Back to bathroom remodel contractors
Camarina Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Jan 2026
- Last 24 months
- 4 permits filed
68 permits since 2000: 58 completed, 2 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 22 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2026 | Completed final sign-off Jun 2026 | 1450 Washington St | unit #7: renovate kitchen & bathroom in kind. plumbing and electrical as needed. no shower panDetails
unit #7: renovate kitchen & bathroom in kind. plumbing and electrical as needed. no shower pan | $45,000 |
| Jan 7, 2026 | In progress issued Jan 2026 | 2525 22nd Av | revision to pa #202506259388: new wall to align with existing wall at s.w. corner, part of horizontal expansion/change walls at interior stair to kitchen/new slider patio door at n-w patio/change windows 0034 004 size(smaller) changes in layout of new bath 1 & 2, furnace & water, heater moved intoDetails
revision to pa #202506259388: new wall to align with existing wall at s.w. corner, part of horizontal expansion/change walls at interior stair to kitchen/new slider patio door at n-w patio/change windows 0034 004 size(smaller) changes in layout of new bath 1 & 2, furnace & water, heater moved into | |
| Apr 8, 2025 | Completed final sign-off Nov 2025 | 1550 Hayes St | unit 3- remodel kitchen and bathroom reconfigure bath and kitchen non bearing walls and add closet in bedroom. update electrical and plumbingDetails
unit 3- remodel kitchen and bathroom reconfigure bath and kitchen non bearing walls and add closet in bedroom. update electrical and plumbing | $40,000 |
| Feb 28, 2022 | Completed final sign-off Jul 2022 | 1550 Hayes St | unit 8: remodel kitchen and bath. replace in kind.Details
unit 8: remodel kitchen and bath. replace in kind. | $25,000 |
| Feb 13, 2020 | Completed final sign-off Apr 2020 | 1456 Jones St | apt 26: remodel bathroom & kitchen in-kind.Details
apt 26: remodel bathroom & kitchen in-kind. | $25,000 |
| Mar 6, 2018 | Completed final sign-off Sep 2018 | 1183 Jackson St | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $25,000 |
| Feb 2, 2018 | Completed final sign-off Sep 2018 | 1550 Hayes St | apt #6: remodel kitchen and bathroom.Details
apt #6: remodel kitchen and bathroom. | $25,000 |
| Dec 7, 2017 | Completed final sign-off Apr 2018 | 70 San Pablo Av | remodel bathroom on main floor & interior bedroom remodel.Details
remodel bathroom on main floor & interior bedroom remodel. | $15,000 |
| Dec 7, 2017 | Completed final sign-off Mar 2018 | 1456 Jones St | #1 -remodel kitchen & bathroom. maher naDetails
#1 -remodel kitchen & bathroom. maher na | $15,000 |
| Feb 16, 2016 | Expired or cancelled cancelled Apr 2026 | 1440 Washington St | (2) new dwelling units per ord no. 30-15. 1 bedroom, 1 bath at (e) shell space at rear of bldg. soft story permit#201510089204. ** maher: disburbance of at least 50 cu. yd. of soil. route to dph **Details
(2) new dwelling units per ord no. 30-15. 1 bedroom, 1 bath at (e) shell space at rear of bldg. soft story permit#201510089204. ** maher: disburbance of at least 50 cu. yd. of soil. route to dph ** | $50,000 |
| Nov 3, 2014 | Completed final sign-off Jan 2016 | 110 Everglade Dr | remodeling of (e) bedroom, bath, & family @ 1st flr, new laundry rm & hallway @ 1st flr, re-design of interior stairs, voluntary strengthening to 1st flrDetails
remodeling of (e) bedroom, bath, & family @ 1st flr, new laundry rm & hallway @ 1st flr, re-design of interior stairs, voluntary strengthening to 1st flr | $55,000 |
| Feb 18, 2014 | Completed final sign-off Jun 2014 | 2148 15th Av | revision to app#201401156362. replace skylight, install pocket door, install new doors per plans.remodel of 2 bathroomsDetails
revision to app#201401156362. replace skylight, install pocket door, install new doors per plans.remodel of 2 bathrooms | |
| Jan 15, 2014 | Completed final sign-off Jun 2014 | 2148 15th Av | remodel two bathrooms, repair misc. dry rot repair both bathrooms. no change of walls, window and door.Details
remodel two bathrooms, repair misc. dry rot repair both bathrooms. no change of walls, window and door. | $30,000 |
| Apr 15, 2013 | Completed final sign-off Jun 2013 | 345 Green St | remodel kitchen & bathroom in kind. repair dryrot in bathrooms. 345 green st., unit 3 & 347 green st., unit 1. lighting must comply w/cec 150 (k).Details
remodel kitchen & bathroom in kind. repair dryrot in bathrooms. 345 green st., unit 3 & 347 green st., unit 1. lighting must comply w/cec 150 (k). | $30,000 |
| Sep 26, 2011 | Completed final sign-off Nov 2011 | 1440 Washington St | unit #3. remodel kitchen & bathroom. comply his 201159168. no doors, windows, walls under this permit. comply w/ co alarms per cbc 2010 section 420.4Details
unit #3. remodel kitchen & bathroom. comply his 201159168. no doors, windows, walls under this permit. comply w/ co alarms per cbc 2010 section 420.4 | $20,000 |
| Feb 15, 2011 | Completed final sign-off Mar 2011 | 110 Everglade Dr | remodel bathroom in kindDetails
remodel bathroom in kind | $8,000 |
| Nov 23, 2010 | Completed final sign-off Dec 2012 | 2955 26th St | comply with nov# 200565040. remove illegal unit per plans. legalize rooms & bathroom @ ground floor. interior remodel & horizontal addition @ new corner of building.Details
comply with nov# 200565040. remove illegal unit per plans. legalize rooms & bathroom @ ground floor. interior remodel & horizontal addition @ new corner of building. | $75,000 |
| Aug 23, 2010 | Completed final sign-off Dec 2010 | 4545 Ocean Av | remodel two bathrooms in kind (split level), provide h.e. lights or "manual on" occupancy sensor.Details
remodel two bathrooms in kind (split level), provide h.e. lights or "manual on" occupancy sensor. | $15,000 |
| Feb 6, 2009 | Completed final sign-off Apr 2009 | 38 Springfield Dr | revision to pa #200901291057, for bathroom remodel. rearrange toilet and shower tub.Details
revision to pa #200901291057, for bathroom remodel. rearrange toilet and shower tub. | |
| Jan 29, 2009 | Completed final sign-off Apr 2009 | 38 Springfield Dr | retile, replace bathroom vanity & paint. size: 5'x8', 40 sq.ft.Details
retile, replace bathroom vanity & paint. size: 5'x8', 40 sq.ft. | $2,500 |
| Jun 2, 2008 | Completed final sign-off Aug 2008 | 469 Day St | retile bathroom, replace vanity cabinet and paint.Details
retile bathroom, replace vanity cabinet and paint. | $4,000 |
| Aug 20, 2007 | Completed final sign-off Oct 2007 | 469 Day St | replace three windows & retile on bath can't see from street.Details
replace three windows & retile on bath can't see from street. | $5,000 |
| Dec 23, 2004 | Completed final sign-off Jan 2006 | 2170 Vallejo St | remodel kitchen & two baths, install new closet doors, upgrade elect panel & install new lights & plDetails
remodel kitchen & two baths, install new closet doors, upgrade elect panel & install new lights & pl | $45,000 |
| Nov 21, 2002 | Completed final sign-off Apr 2003 | 1520 Larkin St | remodel 2 bathrooms & kitchen & repair dryrot as necessary.Details
remodel 2 bathrooms & kitchen & repair dryrot as necessary. | $12,000 |