Block 6640, lot 007A
469 Day St
- City’s use
- Single Family Residential
- Built
- 1990
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 3,260 sq ft
- Lot
- 2,848 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 19, 2026 | Completed final sign-off May 2026 | 469 Day St | Jr Santos Co | 2 bathroom remodels - all in kind. 1 shower pan installation. will also be updating plumbing and electrical as neccessary. both bathrooms on 2nd floor. new exhaust fan.Details
2 bathroom remodels - all in kind. 1 shower pan installation. will also be updating plumbing and electrical as neccessary. both bathrooms on 2nd floor. new exhaust fan. | $8,000 |
| Oct 27, 2025 | Completed final sign-off Dec 2025 | 469 Day St | Apollo Building & Roofing Group Inc. | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,000 |
| Nov 9, 2015 | Never finaled issued Nov 2015, no final | 469 Day St | street space & sidewalkDetails
street space & sidewalk | ||
| Sep 24, 2010 | Completed final sign-off Oct 2010 | 469 Day St | Kibuk Construction Inc | install fiber cement siding over t-1-11 plywood siding at back sides, approx 1500 sq.ft. no structural workDetails
install fiber cement siding over t-1-11 plywood siding at back sides, approx 1500 sq.ft. no structural work | $11,870 |
| Jun 2, 2008 | Completed final sign-off Aug 2008 | 469 Day St | Camarina Construction Corp | retile bathroom, replace vanity cabinet and paint.Details
retile bathroom, replace vanity cabinet and paint. | $4,000 |
| Feb 19, 2008 | Completed final sign-off Aug 2008 | 469 Day St | Camarina Construction Corp | replace 4 (off street) windows in kind. not visable from the street.Details
replace 4 (off street) windows in kind. not visable from the street. | $4,000 |
| Aug 20, 2007 | Completed final sign-off Oct 2007 | 469 Day St | Camarina Construction Corp | replace three windows & retile on bath can't see from street.Details
replace three windows & retile on bath can't see from street. | $5,000 |
| Dec 5, 2006 | Completed final sign-off Jan 2007 | 469 Day St | Camarina Construction Corp | replace four windows and approx. 150 sq. ft. of t-111 siding to install windows, no vissible from street, in kind.Details
replace four windows and approx. 150 sq. ft. of t-111 siding to install windows, no vissible from street, in kind. | $4,000 |
| Nov 18, 2005 | Never finaled issued Nov 2005, no final | 469 Day St | streetspaceDetails
streetspace | ||
| Oct 26, 2005 | Completed final sign-off Feb 2006 | 469 Day St | replace (e) ext. stair / & landing on same size per plan. add grante on top of the stair & landing.Details
replace (e) ext. stair / & landing on same size per plan. add grante on top of the stair & landing. | $3,000 | |
| Oct 20, 2005 | Completed final sign-off Feb 2006 | 469 Day St | Camarina Construction Corp | remove front steps, install new granite steps, less than 50%. lower landing, repair framing as needed. replace 13 windows, wood wndws w/ like kind. repair dryrt siding as needed. reroof 1 lightwell and membrane. steps with hot tar.dbl door at bottom entrance and paint front of houseDetails
remove front steps, install new granite steps, less than 50%. lower landing, repair framing as needed. replace 13 windows, wood wndws w/ like kind. repair dryrt siding as needed. reroof 1 lightwell and membrane. steps with hot tar.dbl door at bottom entrance and paint front of house | $13,000 |
| Sep 27, 2002 | Completed final sign-off Jan 2003 | 469 Day St | Oxypower Inc Dba Occidental Power | install solar electric panels on roof & wire it into the service panelDetails
install solar electric panels on roof & wire it into the service panel | $19,000 |
| Sep 11, 2002 | Completed final sign-off Feb 2003 | 469 Day St | dry/damp rot repairs to framing in rec.room & roof deck parappet above source of h2o,replace sidingDetails
dry/damp rot repairs to framing in rec.room & roof deck parappet above source of h2o,replace siding | $11,000 | |
| Aug 6, 2002 | Completed final sign-off Feb 2003 | 469 Day St | repair (e) deck & expand grade level at deck below 3' add hot tubDetails
repair (e) deck & expand grade level at deck below 3' add hot tub | $4,000 | |
| Aug 1, 2002 | Completed final sign-off Feb 2003 | 469 Day St | take out & repl kitchen & bath cabinetsDetails
take out & repl kitchen & bath cabinets | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Camarina Construction Corp (5), Apollo Building & Roofing Group Inc., Jr Santos Co, Kibuk Construction Inc, Oxypower Inc Dba Occidental Power
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.