Back to kitchen remodel contractors
C Wakeman Construction
- Based in
- Corte Madera
- On San Francisco permits
- Oct 2005 to Feb 2018
- Last 24 months
- 0 permits filed
23 permits since 2000: 20 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 8 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 258 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2018 | Completed final sign-off May 2019 | 79 Uranus Tr | 2nd fl: remodel: demolish interior stair; remodel interior including kitchen, bath, closets. replace decking and railing.Details
2nd fl: remodel: demolish interior stair; remodel interior including kitchen, bath, closets. replace decking and railing. | $75,000 |
| Mar 17, 2016 | Expired or cancelled cancelled Jun 2016 | 351 Buena Vista East Av | no structural work, no wall modification. remodel kitchen & 2 baths, no change in walls, replace cabinets & counters in kitchen, keep appliances, replace tile and vanities in bathrooms, install electrical and plumbing as needed, toilets to be low flow, all lighting high efficacy led.Details
no structural work, no wall modification. remodel kitchen & 2 baths, no change in walls, replace cabinets & counters in kitchen, keep appliances, replace tile and vanities in bathrooms, install electrical and plumbing as needed, toilets to be low flow, all lighting high efficacy led. | $63,000 |
| Apr 26, 2013 | Completed final sign-off Mar 2014 | 163 Masonic Av | kitchen remodel, no change in walls, change cabinets & counters, install led title 24 lights & circuits, move plumbing as needed, install 2 new windows to match existing, marvin window aluminum wood/clad max = 0.4 max. tempered window at breakfast nook, new ranges, hood to existing duct.Details
kitchen remodel, no change in walls, change cabinets & counters, install led title 24 lights & circuits, move plumbing as needed, install 2 new windows to match existing, marvin window aluminum wood/clad max = 0.4 max. tempered window at breakfast nook, new ranges, hood to existing duct. | $34,000 |
| Mar 22, 2010 | Completed final sign-off Apr 2011 | 450 El Camino Del Mar | remove kitchen and laundry room, no change in walls, install new cabinets, counters, electrical as needed, new appliances, change out one existing window in kitchen, clean up plumbing move as needed. window u= 0.40 max. lighting shall comply with cec 150 (k)Details
remove kitchen and laundry room, no change in walls, install new cabinets, counters, electrical as needed, new appliances, change out one existing window in kitchen, clean up plumbing move as needed. window u= 0.40 max. lighting shall comply with cec 150 (k) | $46,000 |
| Mar 12, 2009 | Completed final sign-off Apr 2009 | 2200 Pacific Av | remodel kitchen, replace cabinets + countertop, replace some appliances, change kitchen floor, add under cabinet ltc. no new walls no modification of existing non structural partitions.Details
remodel kitchen, replace cabinets + countertop, replace some appliances, change kitchen floor, add under cabinet ltc. no new walls no modification of existing non structural partitions. | $14,000 |
| Oct 7, 2008 | Completed final sign-off Apr 2009 | 9 Burlwood Dr | remodel kitchen and bath at 2nd fl. remodel e bath at 3rd floor, new full bath.Details
remodel kitchen and bath at 2nd fl. remodel e bath at 3rd floor, new full bath. | $55,000 |
| Mar 6, 2008 | Completed final sign-off Sep 2008 | 564 12th Av | remodel kitchen - provide new vanity, remove bathroom at 2nd floor, provide new 1 story deck and stairs.Details
remodel kitchen - provide new vanity, remove bathroom at 2nd floor, provide new 1 story deck and stairs. | $40,000 |
| Apr 16, 2007 | Completed final sign-off Jul 2007 | 52 Palm Av | top floor unit kitchen remodel no change in walls. lighting: at least 50% wattage must be flourescent.Details
top floor unit kitchen remodel no change in walls. lighting: at least 50% wattage must be flourescent. | $35,000 |
| Feb 21, 2006 | Expired or cancelled expired Jun 2007 | 232 Rutledge St | remodel kitchen, no change inw alls, replace cabinets, and counters, bring electrical up to code, bring plumbing up to code, flourescent lightingDetails
remodel kitchen, no change inw alls, replace cabinets, and counters, bring electrical up to code, bring plumbing up to code, flourescent lighting | $15,000 |
| Jan 5, 2006 | Completed final sign-off Apr 2007 | 414 Eureka St | kitchen remodel, upgrade electrical, plumbing, cabinets revision to pa 200511288964Details
kitchen remodel, upgrade electrical, plumbing, cabinets revision to pa 200511288964 | $15,000 |