C Wakeman Construction
- Based in
- Corte Madera
- On San Francisco permits
- Oct 2005 to Feb 2018
- Last 24 months
- 0 permits filed
23 permits since 2000: 20 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2018 | Completed final sign-off May 2019 | 79 Uranus Tr | 2nd fl: remodel: demolish interior stair; remodel interior including kitchen, bath, closets. replace decking and railing.Details
2nd fl: remodel: demolish interior stair; remodel interior including kitchen, bath, closets. replace decking and railing. | $75,000 |
| Mar 17, 2016 | Expired or cancelled cancelled Jun 2016 | 351 Buena Vista East Av | no structural work, no wall modification. remodel kitchen & 2 baths, no change in walls, replace cabinets & counters in kitchen, keep appliances, replace tile and vanities in bathrooms, install electrical and plumbing as needed, toilets to be low flow, all lighting high efficacy led.Details
no structural work, no wall modification. remodel kitchen & 2 baths, no change in walls, replace cabinets & counters in kitchen, keep appliances, replace tile and vanities in bathrooms, install electrical and plumbing as needed, toilets to be low flow, all lighting high efficacy led. | $63,000 |
| Jul 31, 2013 | Completed final sign-off Dec 2013 | 242 Anderson St | remove front porch tile, install waterproof membraine and reinstall tile.Details
remove front porch tile, install waterproof membraine and reinstall tile. | $4,500 |
| Apr 26, 2013 | Completed final sign-off Mar 2014 | 163 Masonic Av | kitchen remodel, no change in walls, change cabinets & counters, install led title 24 lights & circuits, move plumbing as needed, install 2 new windows to match existing, marvin window aluminum wood/clad max = 0.4 max. tempered window at breakfast nook, new ranges, hood to existing duct.Details
kitchen remodel, no change in walls, change cabinets & counters, install led title 24 lights & circuits, move plumbing as needed, install 2 new windows to match existing, marvin window aluminum wood/clad max = 0.4 max. tempered window at breakfast nook, new ranges, hood to existing duct. | $34,000 |
| May 19, 2011 | Completed final sign-off Aug 2011 | 2 Douglass St | remove illegal wood sub-floor installed in (e) garage;add new garage door opener, restore garage to original condition, no structural change; no change to window walls doorsDetails
remove illegal wood sub-floor installed in (e) garage;add new garage door opener, restore garage to original condition, no structural change; no change to window walls doors | $1,300 |
| Dec 2, 2010 | Completed final sign-off Apr 2011 | 450 El Camino Del Mar | remodel 2nd floor bathroom. install new tub, new shower pan, new fixtures and tile. no change in walls.Details
remodel 2nd floor bathroom. install new tub, new shower pan, new fixtures and tile. no change in walls. | $13,000 |
| Jul 26, 2010 | Never finaled issued Dec 2012, no final | 450 El Camino Del Mar | new deck at 2nd floor rear yard. new door & window at deck to replace existing window.Details
new deck at 2nd floor rear yard. new door & window at deck to replace existing window. | $8,000 |
| Apr 30, 2010 | Completed final sign-off Jan 2011 | 564 12th Av | (n) family room at 1st. flr. with (n) bathroom, storage rm. and laundry rm. remove stair from 1st. flr. to garage and replace with (n) stair.Details
(n) family room at 1st. flr. with (n) bathroom, storage rm. and laundry rm. remove stair from 1st. flr. to garage and replace with (n) stair. | $50,000 |
| Mar 22, 2010 | Completed final sign-off Apr 2011 | 450 El Camino Del Mar | remove kitchen and laundry room, no change in walls, install new cabinets, counters, electrical as needed, new appliances, change out one existing window in kitchen, clean up plumbing move as needed. window u= 0.40 max. lighting shall comply with cec 150 (k)Details
remove kitchen and laundry room, no change in walls, install new cabinets, counters, electrical as needed, new appliances, change out one existing window in kitchen, clean up plumbing move as needed. window u= 0.40 max. lighting shall comply with cec 150 (k) | $46,000 |
| Mar 12, 2009 | Completed final sign-off Apr 2009 | 2200 Pacific Av | remodel kitchen, replace cabinets + countertop, replace some appliances, change kitchen floor, add under cabinet ltc. no new walls no modification of existing non structural partitions.Details
remodel kitchen, replace cabinets + countertop, replace some appliances, change kitchen floor, add under cabinet ltc. no new walls no modification of existing non structural partitions. | $14,000 |
| Dec 12, 2008 | Completed final sign-off Apr 2009 | 9 Burlwood Dr | repair pest report work front porch area to rear of building. approx 1 floor on west side of building. sections 1, 6, 5, 3, 4, 8 of pest report.Details
repair pest report work front porch area to rear of building. approx 1 floor on west side of building. sections 1, 6, 5, 3, 4, 8 of pest report. | $8,000 |
| Oct 7, 2008 | Completed final sign-off Apr 2009 | 9 Burlwood Dr | remodel kitchen and bath at 2nd fl. remodel e bath at 3rd floor, new full bath.Details
remodel kitchen and bath at 2nd fl. remodel e bath at 3rd floor, new full bath. | $55,000 |
| Mar 10, 2008 | Completed final sign-off May 2008 | 614 Clarendon Av | demo bath as needed. install new plumbing fixtures and tile. sheetrock as needed. new vanity, toilet, fan lights. no change in walls.Details
demo bath as needed. install new plumbing fixtures and tile. sheetrock as needed. new vanity, toilet, fan lights. no change in walls. | $8,000 |
| Mar 6, 2008 | Completed final sign-off Sep 2008 | 564 12th Av | remodel kitchen - provide new vanity, remove bathroom at 2nd floor, provide new 1 story deck and stairs.Details
remodel kitchen - provide new vanity, remove bathroom at 2nd floor, provide new 1 story deck and stairs. | $40,000 |
| Apr 16, 2007 | Completed final sign-off Jul 2007 | 52 Palm Av | top floor unit kitchen remodel no change in walls. lighting: at least 50% wattage must be flourescent.Details
top floor unit kitchen remodel no change in walls. lighting: at least 50% wattage must be flourescent. | $35,000 |
| Apr 9, 2007 | Completed final sign-off Apr 2007 | 414 Eureka St | renew app#200511288964 and 200601051555 for final inspectionDetails
renew app#200511288964 and 200601051555 for final inspection | |
| Mar 21, 2007 | Completed final sign-off Jul 2007 | 614 Clarendon Av | replace vanity cabinet & top, tile, bath floor & paint. replace toilet, add 4 can lights. all plumbing stays in the same location. no change in walls.Details
replace vanity cabinet & top, tile, bath floor & paint. replace toilet, add 4 can lights. all plumbing stays in the same location. no change in walls. | $8,000 |
| Nov 2, 2006 | Completed final sign-off Nov 2007 | 1838 Golden Gate Av | convert closet space into bathroom at 1st floor unit.Details
convert closet space into bathroom at 1st floor unit. | $10,000 |
| Apr 24, 2006 | Completed final sign-off Sep 2006 | 209 Eureka St | bathroom remodel 2nd floor flourescent lighting single unitDetails
bathroom remodel 2nd floor flourescent lighting single unit | $17,000 |
| Mar 2, 2006 | Completed final sign-off Aug 2006 | 564 12th Av | remodel existing bathroom and add new bathroom at 3/fDetails
remodel existing bathroom and add new bathroom at 3/f | $20,000 |
| Feb 21, 2006 | Expired or cancelled expired Jun 2007 | 232 Rutledge St | remodel kitchen, no change inw alls, replace cabinets, and counters, bring electrical up to code, bring plumbing up to code, flourescent lightingDetails
remodel kitchen, no change inw alls, replace cabinets, and counters, bring electrical up to code, bring plumbing up to code, flourescent lighting | $15,000 |
| Jan 5, 2006 | Completed final sign-off Apr 2007 | 414 Eureka St | kitchen remodel, upgrade electrical, plumbing, cabinets revision to pa 200511288964Details
kitchen remodel, upgrade electrical, plumbing, cabinets revision to pa 200511288964 | $15,000 |
| Oct 24, 2005 | Completed final sign-off Feb 2006 | 558 12th Av | partial demo, new faucets, fixtures, tile, fans, no change in walls, bath at bathroom 2nd floor, replace existing rear yard window not visible from the streetDetails
partial demo, new faucets, fixtures, tile, fans, no change in walls, bath at bathroom 2nd floor, replace existing rear yard window not visible from the street | $14,000 |