Back to bathroom remodel contractors
C Wakeman Construction
- Based in
- Corte Madera
- On San Francisco permits
- Oct 2005 to Feb 2018
- Last 24 months
- 0 permits filed
23 permits since 2000: 20 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 11 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2018 | Completed final sign-off May 2019 | 79 Uranus Tr | 2nd fl: remodel: demolish interior stair; remodel interior including kitchen, bath, closets. replace decking and railing.Details
2nd fl: remodel: demolish interior stair; remodel interior including kitchen, bath, closets. replace decking and railing. | $75,000 |
| Mar 17, 2016 | Expired or cancelled cancelled Jun 2016 | 351 Buena Vista East Av | no structural work, no wall modification. remodel kitchen & 2 baths, no change in walls, replace cabinets & counters in kitchen, keep appliances, replace tile and vanities in bathrooms, install electrical and plumbing as needed, toilets to be low flow, all lighting high efficacy led.Details
no structural work, no wall modification. remodel kitchen & 2 baths, no change in walls, replace cabinets & counters in kitchen, keep appliances, replace tile and vanities in bathrooms, install electrical and plumbing as needed, toilets to be low flow, all lighting high efficacy led. | $63,000 |
| Dec 2, 2010 | Completed final sign-off Apr 2011 | 450 El Camino Del Mar | remodel 2nd floor bathroom. install new tub, new shower pan, new fixtures and tile. no change in walls.Details
remodel 2nd floor bathroom. install new tub, new shower pan, new fixtures and tile. no change in walls. | $13,000 |
| Apr 30, 2010 | Completed final sign-off Jan 2011 | 564 12th Av | (n) family room at 1st. flr. with (n) bathroom, storage rm. and laundry rm. remove stair from 1st. flr. to garage and replace with (n) stair.Details
(n) family room at 1st. flr. with (n) bathroom, storage rm. and laundry rm. remove stair from 1st. flr. to garage and replace with (n) stair. | $50,000 |
| Oct 7, 2008 | Completed final sign-off Apr 2009 | 9 Burlwood Dr | remodel kitchen and bath at 2nd fl. remodel e bath at 3rd floor, new full bath.Details
remodel kitchen and bath at 2nd fl. remodel e bath at 3rd floor, new full bath. | $55,000 |
| Mar 10, 2008 | Completed final sign-off May 2008 | 614 Clarendon Av | demo bath as needed. install new plumbing fixtures and tile. sheetrock as needed. new vanity, toilet, fan lights. no change in walls.Details
demo bath as needed. install new plumbing fixtures and tile. sheetrock as needed. new vanity, toilet, fan lights. no change in walls. | $8,000 |
| Mar 6, 2008 | Completed final sign-off Sep 2008 | 564 12th Av | remodel kitchen - provide new vanity, remove bathroom at 2nd floor, provide new 1 story deck and stairs.Details
remodel kitchen - provide new vanity, remove bathroom at 2nd floor, provide new 1 story deck and stairs. | $40,000 |
| Mar 21, 2007 | Completed final sign-off Jul 2007 | 614 Clarendon Av | replace vanity cabinet & top, tile, bath floor & paint. replace toilet, add 4 can lights. all plumbing stays in the same location. no change in walls.Details
replace vanity cabinet & top, tile, bath floor & paint. replace toilet, add 4 can lights. all plumbing stays in the same location. no change in walls. | $8,000 |
| Nov 2, 2006 | Completed final sign-off Nov 2007 | 1838 Golden Gate Av | convert closet space into bathroom at 1st floor unit.Details
convert closet space into bathroom at 1st floor unit. | $10,000 |
| Apr 24, 2006 | Completed final sign-off Sep 2006 | 209 Eureka St | bathroom remodel 2nd floor flourescent lighting single unitDetails
bathroom remodel 2nd floor flourescent lighting single unit | $17,000 |
| Mar 2, 2006 | Completed final sign-off Aug 2006 | 564 12th Av | remodel existing bathroom and add new bathroom at 3/fDetails
remodel existing bathroom and add new bathroom at 3/f | $20,000 |
| Oct 24, 2005 | Completed final sign-off Feb 2006 | 558 12th Av | partial demo, new faucets, fixtures, tile, fans, no change in walls, bath at bathroom 2nd floor, replace existing rear yard window not visible from the streetDetails
partial demo, new faucets, fixtures, tile, fans, no change in walls, bath at bathroom 2nd floor, replace existing rear yard window not visible from the street | $14,000 |