Buzzer 9 Development Inc
- Based in
- Sausalito
- On San Francisco permits
- Jan 2014 to Jan 2025
- Last 24 months
- 2 permits filed
26 permits since 2000: 18 completed, 3 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 in progress. Typically 252 days from filing to permit and 207 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 2, 2025 | In progress issued Sep 2025 | 500 Castro St | prop h: tenant improvement to include demolishng existing bar, kitchen, bathrooms and demizing wall between 500 and 504 castro street. install new bar, new kitchen, new bathrooms, new stairs and mezzanine, new finishes, fixures and lighting. replace exterior windows & doors.Details
prop h: tenant improvement to include demolishng existing bar, kitchen, bathrooms and demizing wall between 500 and 504 castro street. install new bar, new kitchen, new bathrooms, new stairs and mezzanine, new finishes, fixures and lighting. replace exterior windows & doors. | $550,000 |
| Oct 31, 2022 | Completed final sign-off Apr 2024 | 679 Chenery St | new exterior stair at rear of property, convert roof at rear to habitable deck on 2nd floor, add guardrails around deck, replace window with door. add (1) new dormer to roof at chenery street side. minor modifications to rear exterior window frame materials.Details
new exterior stair at rear of property, convert roof at rear to habitable deck on 2nd floor, add guardrails around deck, replace window with door. add (1) new dormer to roof at chenery street side. minor modifications to rear exterior window frame materials. | $20,000 |
| Dec 6, 2019 | Completed final sign-off Oct 2020 | 2054 34th Av | kitchen remodel. relocate 1 bath at 2nd fl. re-configure bedrooms and add full master bath. replace 2 front windows & 3 rear windows and water heater. add drywall at ground fl. remove rear patio & construction new rear stair,Details
kitchen remodel. relocate 1 bath at 2nd fl. re-configure bedrooms and add full master bath. replace 2 front windows & 3 rear windows and water heater. add drywall at ground fl. remove rear patio & construction new rear stair, | $150,000 |