Buzzer 9 Development Inc
- Based in
- Sausalito
- On San Francisco permits
- Jan 2014 to Jan 2025
- Last 24 months
- 2 permits filed
26 permits since 2000: 18 completed, 3 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 180 days from filing to permit and 226 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2023 | Completed final sign-off Jul 2024 | 1809 Gough St | remodel of (e) 1st and 2nd level condo in area of bedrooms, baths, study, hall, kitchen & family rm. addition of washer/dryer at 2nd level. replace 3 windows in kind. remove (e) balcony at 2nd level on side yard. extend wood deck at side yard at less than 30" above grade. new elec/plumbing at areasDetails
remodel of (e) 1st and 2nd level condo in area of bedrooms, baths, study, hall, kitchen & family rm. addition of washer/dryer at 2nd level. replace 3 windows in kind. remove (e) balcony at 2nd level on side yard. extend wood deck at side yard at less than 30" above grade. new elec/plumbing at areas | $185,000 |
| Oct 31, 2022 | Completed final sign-off Apr 2024 | 679 Chenery St | new exterior stair at rear of property, convert roof at rear to habitable deck on 2nd floor, add guardrails around deck, replace window with door. add (1) new dormer to roof at chenery street side. minor modifications to rear exterior window frame materials.Details
new exterior stair at rear of property, convert roof at rear to habitable deck on 2nd floor, add guardrails around deck, replace window with door. add (1) new dormer to roof at chenery street side. minor modifications to rear exterior window frame materials. | $20,000 |