Back to bathroom remodel contractors
Buzzer 9 Development Inc
- Based in
- Sausalito
- On San Francisco permits
- Jan 2014 to Jan 2025
- Last 24 months
- 2 permits filed
26 permits since 2000: 18 completed, 3 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 3 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 129 days from filing to permit and 282 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 2, 2025 | In progress issued Sep 2025 | 500 Castro St | prop h: tenant improvement to include demolishng existing bar, kitchen, bathrooms and demizing wall between 500 and 504 castro street. install new bar, new kitchen, new bathrooms, new stairs and mezzanine, new finishes, fixures and lighting. replace exterior windows & doors.Details
prop h: tenant improvement to include demolishng existing bar, kitchen, bathrooms and demizing wall between 500 and 504 castro street. install new bar, new kitchen, new bathrooms, new stairs and mezzanine, new finishes, fixures and lighting. replace exterior windows & doors. | $550,000 |
| Oct 3, 2023 | Completed final sign-off Jul 2024 | 1809 Gough St | remodel of (e) 1st and 2nd level condo in area of bedrooms, baths, study, hall, kitchen & family rm. addition of washer/dryer at 2nd level. replace 3 windows in kind. remove (e) balcony at 2nd level on side yard. extend wood deck at side yard at less than 30" above grade. new elec/plumbing at areasDetails
remodel of (e) 1st and 2nd level condo in area of bedrooms, baths, study, hall, kitchen & family rm. addition of washer/dryer at 2nd level. replace 3 windows in kind. remove (e) balcony at 2nd level on side yard. extend wood deck at side yard at less than 30" above grade. new elec/plumbing at areas | $185,000 |
| Sep 20, 2022 | Expired or cancelled withdrawn Oct 2023 | 12 Retiro Wy | in kind kitchen and bathroom renovation at 14 retiro way.Details
in kind kitchen and bathroom renovation at 14 retiro way. | $10,000 |
| Mar 17, 2021 | Never finaled issued Nov 2021, no final | 24 Presidio Av | demo plaster & drywall to studs. remove cabinetry & fireplace as required. add 91 can lights. upgrade electrical in kitchen & baths. new drywall throughout. new molding/base/case/crown. new cabinetry & custom closets. new bath fixtures, tile & hardwood.Details
demo plaster & drywall to studs. remove cabinetry & fireplace as required. add 91 can lights. upgrade electrical in kitchen & baths. new drywall throughout. new molding/base/case/crown. new cabinetry & custom closets. new bath fixtures, tile & hardwood. | $600,000 |
| Nov 25, 2020 | Completed final sign-off Nov 2022 | 2566 35th Av | 2/f:reconfigure (e) bathroom, closet & add 2nd bathroom. 1/f: add full bathroom & recessed entry door. replace windows, skylights, lights & electrical.Details
2/f:reconfigure (e) bathroom, closet & add 2nd bathroom. 1/f: add full bathroom & recessed entry door. replace windows, skylights, lights & electrical. | $150,000 |
| Dec 6, 2019 | Completed final sign-off Oct 2020 | 2054 34th Av | kitchen remodel. relocate 1 bath at 2nd fl. re-configure bedrooms and add full master bath. replace 2 front windows & 3 rear windows and water heater. add drywall at ground fl. remove rear patio & construction new rear stair,Details
kitchen remodel. relocate 1 bath at 2nd fl. re-configure bedrooms and add full master bath. replace 2 front windows & 3 rear windows and water heater. add drywall at ground fl. remove rear patio & construction new rear stair, | $150,000 |
| Nov 8, 2019 | Never finaled issued Nov 2019, no final | 3749 Scott St | bathroom remodel. no structural 7 ft by 8 ft.Details
bathroom remodel. no structural 7 ft by 8 ft. | $16,061 |