Back to kitchen remodel contractors
Bull Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to Apr 2026
- Last 24 months
- 2 permits filed
20 permits since 2000: 16 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2022 | Completed final sign-off Feb 2024 | 420 Precita Av | rev to pa201812067573: change original kitchen from media room to kitchenette and 2 burner stove. add new header beams at bearing wall openings.Details
rev to pa201812067573: change original kitchen from media room to kitchenette and 2 burner stove. add new header beams at bearing wall openings. | $5,000 |
| Jun 28, 2021 | Completed final sign-off Jul 2021 | 1335 Filbert St | to comply with nov 202174233. kitchen remodel in a 492 sf ft studio apt consisting of new cabinets, countertops with new sink and faucet. all work is like for like. no rough work - no protrusion in dry wall.Details
to comply with nov 202174233. kitchen remodel in a 492 sf ft studio apt consisting of new cabinets, countertops with new sink and faucet. all work is like for like. no rough work - no protrusion in dry wall. | $10,000 |
| Jun 7, 2018 | Completed final sign-off Sep 2018 | 2875 21st St | unit 4: replace kitchen caibnets in same location. replce two bathroom vanities. building to comply with sffc 1103.7.6.1 for fire alarm.Details
unit 4: replace kitchen caibnets in same location. replce two bathroom vanities. building to comply with sffc 1103.7.6.1 for fire alarm. | $25,000 |
| May 17, 2018 | Completed final sign-off Oct 2018 | 1541 Treat Av | remodel existing apartment, reconfigure some interior partitions, remodel kitchen & bathroom. replace existing windows at sides & rear & add new window at side. replacement windows to be alum. clad wood new window to be alum clad wood,. bathroom tobe fiberglass windowDetails
remodel existing apartment, reconfigure some interior partitions, remodel kitchen & bathroom. replace existing windows at sides & rear & add new window at side. replacement windows to be alum. clad wood new window to be alum clad wood,. bathroom tobe fiberglass window | $75,000 |
| Jan 31, 2017 | Completed final sign-off Jul 2017 | 1547 Treat Av | relocate kitchen to (e) dining room & dining room to (e) kitchen; replace existing windows & exterior doors at rear & lightwell - not visable from the street. new electrical, drywall & add insulation as required for new work.Details
relocate kitchen to (e) dining room & dining room to (e) kitchen; replace existing windows & exterior doors at rear & lightwell - not visable from the street. new electrical, drywall & add insulation as required for new work. | $42,000 |
| Mar 10, 2014 | Expired or cancelled withdrawn Nov 2015 | 3599 24th St | remove extg wall to enlarge closet space in the kitchen. the wall to be removed is not a load bearing wall.Details
remove extg wall to enlarge closet space in the kitchen. the wall to be removed is not a load bearing wall. | $1,000 |