Back to bathroom remodel contractors
Bull Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to Apr 2026
- Last 24 months
- 2 permits filed
20 permits since 2000: 16 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 7 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2018 | Completed final sign-off Sep 2018 | 2875 21st St | unit 4: replace kitchen caibnets in same location. replce two bathroom vanities. building to comply with sffc 1103.7.6.1 for fire alarm.Details
unit 4: replace kitchen caibnets in same location. replce two bathroom vanities. building to comply with sffc 1103.7.6.1 for fire alarm. | $25,000 |
| May 17, 2018 | Completed final sign-off Oct 2018 | 1541 Treat Av | remodel existing apartment, reconfigure some interior partitions, remodel kitchen & bathroom. replace existing windows at sides & rear & add new window at side. replacement windows to be alum. clad wood new window to be alum clad wood,. bathroom tobe fiberglass windowDetails
remodel existing apartment, reconfigure some interior partitions, remodel kitchen & bathroom. replace existing windows at sides & rear & add new window at side. replacement windows to be alum. clad wood new window to be alum clad wood,. bathroom tobe fiberglass window | $75,000 |
| Apr 11, 2014 | Completed final sign-off Sep 2022 | 74 Parnassus Av | to comply with cc application #7412 (phisical inspection report for condo conversion). remove bathroom in basementDetails
to comply with cc application #7412 (phisical inspection report for condo conversion). remove bathroom in basement | $8,000 |