Bull Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to Apr 2026
- Last 24 months
- 2 permits filed
20 permits since 2000: 16 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 435 days from filing to permit and 1154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2018 | Completed final sign-off Apr 2023 | 420 Precita Av | vertical addition with mezzanine (approximately 213 square feet) and horizontal additions at the second (53 square feet) and third floors (292 square feet). existing rear second floor roof converted to deck. interior work. no work proposed at rear cottage.Details
vertical addition with mezzanine (approximately 213 square feet) and horizontal additions at the second (53 square feet) and third floors (292 square feet). existing rear second floor roof converted to deck. interior work. no work proposed at rear cottage. | $125,000 |