Buhler Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2013 to Apr 2025
- Last 24 months
- 2 permits filed
62 permits since 2000: 40 completed, 1 in progress, 16 never finaled, 5 expired or cancelled.
Of the 16 never-finaled permits, 2 are 3 to 5 years old, 7 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
7 stairs permits: 4 completed, 1 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 129 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2024 | Completed final sign-off Jul 2024 | 85 El Plazuela Wy | remove and rebuild like for like six stairs (6 steps) and landing to front door of house due to dry rot. repair to the max. of 50%Details
remove and rebuild like for like six stairs (6 steps) and landing to front door of house due to dry rot. repair to the max. of 50% | $32,000 |
| May 12, 2022 | Never finaled issued May 2022, no final | 7949 Geary Bl | construct new deck over storage room on 1st fl. construct new exterior stairs from deck to grade.Details
construct new deck over storage room on 1st fl. construct new exterior stairs from deck to grade. | $35,000 |
| Feb 26, 2016 | Completed final sign-off Dec 2016 | 488 Bryant St | new acces stairs to roof - new access stair enclosure on roof. new access pathway to e sprint antennas. new lighting on roof. volunatry strengthening of trusses.Details
new acces stairs to roof - new access stair enclosure on roof. new access pathway to e sprint antennas. new lighting on roof. volunatry strengthening of trusses. | $100,000 |
| Dec 8, 2015 | Expired or cancelled withdrawn Mar 2016 | 488 Bryant St | new ada bathrooms on ground floor, interior parttions and roof access stair/ladder and door enclosure, mechanical equip access path. n/a for maherDetails
new ada bathrooms on ground floor, interior parttions and roof access stair/ladder and door enclosure, mechanical equip access path. n/a for maher | $158,000 |
| Feb 17, 2015 | Expired or cancelled expired Mar 2019 | 334 Bowdoin St | repair front entry staircase due to dry-rot of wood members and repair stucco where necessary (less than 50% to be altered); no change in dimension, like for like only.Details
repair front entry staircase due to dry-rot of wood members and repair stucco where necessary (less than 50% to be altered); no change in dimension, like for like only. | $15,000 |
| May 13, 2014 | Completed final sign-off Jun 2014 | 129 Noe St | to comply w/ physical inspection report #cc-7520 which includes repair (not more than 50% rear exterior stairway, legalize remodeling work in unit#129 done w/o permit. and others miscellaneous minor repairs as described in report.Details
to comply w/ physical inspection report #cc-7520 which includes repair (not more than 50% rear exterior stairway, legalize remodeling work in unit#129 done w/o permit. and others miscellaneous minor repairs as described in report. | $20,000 |
| Jun 6, 2013 | Completed final sign-off Dec 2013 | 330 Moraga St | 2/f master bathroom remodel- shower tile, fixtures, flooring, cabinets, sheetrock & finish materials. convert down stairs bathroom half bath into full bath -add new shower, relocate toilet, sheetrock, fixtures, flooring. no adding or moving walls in masterbath.Details
2/f master bathroom remodel- shower tile, fixtures, flooring, cabinets, sheetrock & finish materials. convert down stairs bathroom half bath into full bath -add new shower, relocate toilet, sheetrock, fixtures, flooring. no adding or moving walls in masterbath. | $55,000 |