Back to kitchen remodel contractors
Buhler Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2013 to Apr 2025
- Last 24 months
- 2 permits filed
62 permits since 2000: 40 completed, 1 in progress, 16 never finaled, 5 expired or cancelled.
Of the 16 never-finaled permits, 2 are 3 to 5 years old, 7 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 5 completed, 4 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 247 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 1, 2023 | Completed final sign-off Dec 2024 | 3844 19th St | residential remodel of one kitchen and one bathroom along with full electrical rewire of unit. no structural work. all work at unit #3844.Details
residential remodel of one kitchen and one bathroom along with full electrical rewire of unit. no structural work. all work at unit #3844. | $240,000 |
| Feb 8, 2022 | Never finaled issued Feb 2022, no final | 7949 Geary Bl | kitchen enlargement & remodel. interior partitions & structural support. demo (e) bathroom & replace with half bath. lighting & electrical in remodeled area. replace 1 rear & 1 side window.Details
kitchen enlargement & remodel. interior partitions & structural support. demo (e) bathroom & replace with half bath. lighting & electrical in remodeled area. replace 1 rear & 1 side window. | $32,000 |
| May 20, 2019 | Expired or cancelled expired Apr 2024 | 1235 09th Av | renovate extg restaurant/grocery, replace kitchen, replace hood, revise extg ada restroom, new lighting, new mechanical, electrical,plmg. no change of use.Details
renovate extg restaurant/grocery, replace kitchen, replace hood, revise extg ada restroom, new lighting, new mechanical, electrical,plmg. no change of use. | $145,000 |
| Dec 12, 2018 | Completed final sign-off Jun 2019 | 2716 Pine St | revision to 201810102840. renovation of (e) condo 2nd flr - relocate kitchen add bedroom add laundry, closet, renovate bathroom. no ext. work.Details
revision to 201810102840. renovation of (e) condo 2nd flr - relocate kitchen add bedroom add laundry, closet, renovate bathroom. no ext. work. | $45,000 |
| Oct 10, 2018 | Completed final sign-off Jun 2019 | 2716 Pine St | change 2 (e) tub to shower in 2 (e) bathrooms & minor re-wiring. kitchen remodel - move waste , vent & water feed to sink new location. install new lighting nd reptacles, install new stove hood/vent and associated ducting. no exist walls or partitions are moving, no exterior chnages kitchen is 150 sDetails
change 2 (e) tub to shower in 2 (e) bathrooms & minor re-wiring. kitchen remodel - move waste , vent & water feed to sink new location. install new lighting nd reptacles, install new stove hood/vent and associated ducting. no exist walls or partitions are moving, no exterior chnages kitchen is 150 s | $20,000 |
| Jan 25, 2018 | Never finaled issued Mar 2019, no final | 705 06th Av | remove (e) ground fl, garage, add new 2 bed, 2 bath market rate apartment, including kitchen, living rm, laundry, lighting and heating.curb cut to be removed. sprinkler deferred.Details
remove (e) ground fl, garage, add new 2 bed, 2 bath market rate apartment, including kitchen, living rm, laundry, lighting and heating.curb cut to be removed. sprinkler deferred. | $125,000 |
| May 6, 2016 | Never finaled issued May 2016, no final | 281 Collingwood St | remove (e) kitchen/dining ceiling. remove 1 kitchen cab. add led can lights (10) sheet rock lid. replace (e) bathtub, toilet, vanity.Details
remove (e) kitchen/dining ceiling. remove 1 kitchen cab. add led can lights (10) sheet rock lid. replace (e) bathtub, toilet, vanity. | $25,000 |
| Jun 4, 2015 | Completed final sign-off Aug 2015 | 2955 23rd St | correcting original contractors errors. replacing hardwood floors & kitchen cabinets,no changes in layout and no additions or subtractions to original plumbing or elec to bldg. to comply with violation 201543791.Details
correcting original contractors errors. replacing hardwood floors & kitchen cabinets,no changes in layout and no additions or subtractions to original plumbing or elec to bldg. to comply with violation 201543791. | $100,000 |
| Nov 10, 2014 | Never finaled issued Nov 2014, no final | 221 Oak St | remodel upstairs residential unit. new plumbing and electrical. hvac/heating sysstems including new doors, flooring, vanities, cabinets, finishes. paint, etc. (one kitchen and bath remodel).Details
remodel upstairs residential unit. new plumbing and electrical. hvac/heating sysstems including new doors, flooring, vanities, cabinets, finishes. paint, etc. (one kitchen and bath remodel). | $18,000 |
| Oct 21, 2013 | Completed final sign-off Aug 2014 | 3846 19th St | remodel kitchen and bath. new cabinets, flooring, plumb, elec, new vanities, shower enclosure tile, doors, sheetrock, finish carpentry. complete rewire for elec, reroute drains and water lines in kitchen for corner sink, move gas hvac where nec. no structuralDetails
remodel kitchen and bath. new cabinets, flooring, plumb, elec, new vanities, shower enclosure tile, doors, sheetrock, finish carpentry. complete rewire for elec, reroute drains and water lines in kitchen for corner sink, move gas hvac where nec. no structural | $100,000 |