Back to bathroom remodel contractors
Buhler Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2013 to Apr 2025
- Last 24 months
- 2 permits filed
62 permits since 2000: 40 completed, 1 in progress, 16 never finaled, 5 expired or cancelled.
Of the 16 never-finaled permits, 2 are 3 to 5 years old, 7 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 11 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 195 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2025 | Completed final sign-off Dec 2025 | 1466 44th Av | renovation of ground level/garge to include (n) bedrm, bath, laundry and storage areas; structural work include new partial floor slab and new posts; new lighting mechanical work under separate permitDetails
renovation of ground level/garge to include (n) bedrm, bath, laundry and storage areas; structural work include new partial floor slab and new posts; new lighting mechanical work under separate permit | $150,000 |
| Aug 1, 2023 | Completed final sign-off Dec 2024 | 3844 19th St | residential remodel of one kitchen and one bathroom along with full electrical rewire of unit. no structural work. all work at unit #3844.Details
residential remodel of one kitchen and one bathroom along with full electrical rewire of unit. no structural work. all work at unit #3844. | $240,000 |
| Apr 28, 2022 | Completed final sign-off Nov 2022 | 888 Fell St | one bathroom remodel: replace shower enclosure and pan. install new vanity, vanity light, and fan. non structural.Details
one bathroom remodel: replace shower enclosure and pan. install new vanity, vanity light, and fan. non structural. | $9,000 |
| Feb 8, 2022 | Never finaled issued Feb 2022, no final | 7949 Geary Bl | kitchen enlargement & remodel. interior partitions & structural support. demo (e) bathroom & replace with half bath. lighting & electrical in remodeled area. replace 1 rear & 1 side window.Details
kitchen enlargement & remodel. interior partitions & structural support. demo (e) bathroom & replace with half bath. lighting & electrical in remodeled area. replace 1 rear & 1 side window. | $32,000 |
| Mar 16, 2021 | Completed final sign-off Sep 2021 | 888 Fell St | remodel bathroom in kind. replace lightning, tile and vanity. replace shower. no change of wall and openings.Details
remodel bathroom in kind. replace lightning, tile and vanity. replace shower. no change of wall and openings. | $10,000 |
| Dec 22, 2020 | Completed final sign-off May 2021 | 588 South Van Ness Av | #3: replace shower pan & enclosure, replace vanity & toilet, replace can light over shower, vanity scone, & bath fan. replace tile floor.Details
#3: replace shower pan & enclosure, replace vanity & toilet, replace can light over shower, vanity scone, & bath fan. replace tile floor. | $40,000 |
| Dec 12, 2018 | Completed final sign-off Jun 2019 | 2716 Pine St | revision to 201810102840. renovation of (e) condo 2nd flr - relocate kitchen add bedroom add laundry, closet, renovate bathroom. no ext. work.Details
revision to 201810102840. renovation of (e) condo 2nd flr - relocate kitchen add bedroom add laundry, closet, renovate bathroom. no ext. work. | $45,000 |
| Oct 10, 2018 | Completed final sign-off Jun 2019 | 2716 Pine St | change 2 (e) tub to shower in 2 (e) bathrooms & minor re-wiring. kitchen remodel - move waste , vent & water feed to sink new location. install new lighting nd reptacles, install new stove hood/vent and associated ducting. no exist walls or partitions are moving, no exterior chnages kitchen is 150 sDetails
change 2 (e) tub to shower in 2 (e) bathrooms & minor re-wiring. kitchen remodel - move waste , vent & water feed to sink new location. install new lighting nd reptacles, install new stove hood/vent and associated ducting. no exist walls or partitions are moving, no exterior chnages kitchen is 150 s | $20,000 |
| Jan 25, 2018 | Never finaled issued Mar 2019, no final | 705 06th Av | remove (e) ground fl, garage, add new 2 bed, 2 bath market rate apartment, including kitchen, living rm, laundry, lighting and heating.curb cut to be removed. sprinkler deferred.Details
remove (e) ground fl, garage, add new 2 bed, 2 bath market rate apartment, including kitchen, living rm, laundry, lighting and heating.curb cut to be removed. sprinkler deferred. | $125,000 |
| Dec 8, 2015 | Expired or cancelled withdrawn Mar 2016 | 488 Bryant St | new ada bathrooms on ground floor, interior parttions and roof access stair/ladder and door enclosure, mechanical equip access path. n/a for maherDetails
new ada bathrooms on ground floor, interior parttions and roof access stair/ladder and door enclosure, mechanical equip access path. n/a for maher | $158,000 |
| Oct 2, 2015 | Completed final sign-off Jul 2016 | 245 Jefferson St | two bathrooms renovation, including disabled access upgrades. maher n/aDetails
two bathrooms renovation, including disabled access upgrades. maher n/a | $21,689 |
| Nov 10, 2014 | Never finaled issued Nov 2014, no final | 221 Oak St | remodel upstairs residential unit. new plumbing and electrical. hvac/heating sysstems including new doors, flooring, vanities, cabinets, finishes. paint, etc. (one kitchen and bath remodel).Details
remodel upstairs residential unit. new plumbing and electrical. hvac/heating sysstems including new doors, flooring, vanities, cabinets, finishes. paint, etc. (one kitchen and bath remodel). | $18,000 |
| Oct 21, 2013 | Completed final sign-off Dec 2013 | 39 Lobos St | sheetrock reapair, tile repair/ new grout, new plumbing fixtures in baths and kitche, new lighting fixrtures & can trims, new switches/plugs, interior & exterior paint, texture all interior sheetrock, carpet bedrooms, hardwood floor common areas, new cabinet doors and refinish, new windows & doors.Details
sheetrock reapair, tile repair/ new grout, new plumbing fixtures in baths and kitche, new lighting fixrtures & can trims, new switches/plugs, interior & exterior paint, texture all interior sheetrock, carpet bedrooms, hardwood floor common areas, new cabinet doors and refinish, new windows & doors. | $35,000 |
| Oct 21, 2013 | Completed final sign-off Aug 2014 | 3846 19th St | remodel kitchen and bath. new cabinets, flooring, plumb, elec, new vanities, shower enclosure tile, doors, sheetrock, finish carpentry. complete rewire for elec, reroute drains and water lines in kitchen for corner sink, move gas hvac where nec. no structuralDetails
remodel kitchen and bath. new cabinets, flooring, plumb, elec, new vanities, shower enclosure tile, doors, sheetrock, finish carpentry. complete rewire for elec, reroute drains and water lines in kitchen for corner sink, move gas hvac where nec. no structural | $100,000 |
| Jun 6, 2013 | Completed final sign-off Dec 2013 | 330 Moraga St | 2/f master bathroom remodel- shower tile, fixtures, flooring, cabinets, sheetrock & finish materials. convert down stairs bathroom half bath into full bath -add new shower, relocate toilet, sheetrock, fixtures, flooring. no adding or moving walls in masterbath.Details
2/f master bathroom remodel- shower tile, fixtures, flooring, cabinets, sheetrock & finish materials. convert down stairs bathroom half bath into full bath -add new shower, relocate toilet, sheetrock, fixtures, flooring. no adding or moving walls in masterbath. | $55,000 |