Back to kitchen remodel contractors
Bryan J. Valverde Co
- Based in
- San Anselmo
- On San Francisco permits
- Oct 2001 to Aug 2026
- Last 24 months
- 12 permits filed
78 permits since 2000: 36 completed, 4 in progress, 30 never finaled, 8 expired or cancelled.
Of the 30 never-finaled permits, 4 are 3 to 5 years old, 25 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2025 | Completed final sign-off Jun 2026 | 1015 Francisco St | front bldg/unit 3: revision to 202412207243 to comply w/ nov 202533079. modift 1/2 bath to full bath. adding 1/2 bath, remodel kitchen w/ wall removal. no exterior workDetails
front bldg/unit 3: revision to 202412207243 to comply w/ nov 202533079. modift 1/2 bath to full bath. adding 1/2 bath, remodel kitchen w/ wall removal. no exterior work | $20,000 |
| Dec 20, 2024 | Completed final sign-off Jun 2026 | 1015 Francisco St | unit #3 remodel kitchen and 2.5 nath like for like (e). replace 6 (e) windows like for like in front of the bldgDetails
unit #3 remodel kitchen and 2.5 nath like for like (e). replace 6 (e) windows like for like in front of the bldg | $95,000 |
| May 7, 2024 | Expired or cancelled expired Nov 2025 | 201 Waller St | remodel kitchen and 3.5 baths. like for like. (e) (unit #303)Details
remodel kitchen and 3.5 baths. like for like. (e) (unit #303) | $62,000 |
| Jan 4, 2023 | Completed final sign-off Oct 2023 | 3531 16th St | remove/replace in kind (2) existing bathrooms & (1) existing kitchen.Details
remove/replace in kind (2) existing bathrooms & (1) existing kitchen. | $25,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2022 | 50 03rd St | conversion of e basement kitchen and liquor storage room to administrative offices. new exhaust fan on 4th fl roof with ass ductwork servinbv new offices. new lec and mech scope in e phone room. updates to main entry and accessible path to travelDetails
conversion of e basement kitchen and liquor storage room to administrative offices. new exhaust fan on 4th fl roof with ass ductwork servinbv new offices. new lec and mech scope in e phone room. updates to main entry and accessible path to travel | $140,000 |
| Sep 16, 2019 | Completed final sign-off Mar 2021 | 2701 Green St | unit 2: remove replace e kitchen cabinets, bath cabinets, tile as needed, repair drywallDetails
unit 2: remove replace e kitchen cabinets, bath cabinets, tile as needed, repair drywall | $15,000 |
| Feb 23, 2016 | Completed final sign-off Nov 2016 | 771 36th Av | relocate/remodel 1st floor bathroom and remodel kitchen. replace 1 exterior front window and 1 rear window. remodel upstairs bathroom. no additional sq ft. to comply with nov #201699371Details
relocate/remodel 1st floor bathroom and remodel kitchen. replace 1 exterior front window and 1 rear window. remodel upstairs bathroom. no additional sq ft. to comply with nov #201699371 | $5,000 |
| Dec 30, 2015 | Completed final sign-off Nov 2016 | 771 36th Av | interior remodel, replace kitchen cabinets, finishes & fixtures; (2) bathrooms (powder & full bath), replace fixtures & cabinets; no change to walls, doors or windows. no structural work.Details
interior remodel, replace kitchen cabinets, finishes & fixtures; (2) bathrooms (powder & full bath), replace fixtures & cabinets; no change to walls, doors or windows. no structural work. | $35,000 |
| Nov 3, 2015 | Completed final sign-off Dec 2016 | 470 Paris St | demo (e) kitchen move down stairs-relocate, remove single pane window @ 1st flr replace in kind, remove stair case @ rear relocate inside, add one new bath & lr @ 1st flrDetails
demo (e) kitchen move down stairs-relocate, remove single pane window @ 1st flr replace in kind, remove stair case @ rear relocate inside, add one new bath & lr @ 1st flr | $40,000 |
| Jan 7, 2015 | Completed final sign-off Mar 2015 | 1000 North Point St | refresh of condominium unit #305. removing and replacing flooring, paint, kitchen cabinets,new appliances, new bathroom vanity, and refinishing bathtub.Details
refresh of condominium unit #305. removing and replacing flooring, paint, kitchen cabinets,new appliances, new bathroom vanity, and refinishing bathtub. | $19,000 |
| Sep 12, 2014 | Never finaled issued Dec 2014, no final | 572 Ofarrell St | remodeling an (e) restaurant for new restaurant. no change in occupancy, new kitchen layout, new hood, new walk-in cooler, new ada restrooms. n/a ordinance #155-13Details
remodeling an (e) restaurant for new restaurant. no change in occupancy, new kitchen layout, new hood, new walk-in cooler, new ada restrooms. n/a ordinance #155-13 | $120,000 |