Back to bathroom remodel contractors
Bryan J. Valverde Co
- Based in
- San Anselmo
- On San Francisco permits
- Oct 2001 to Aug 2026
- Last 24 months
- 12 permits filed
78 permits since 2000: 36 completed, 4 in progress, 30 never finaled, 8 expired or cancelled.
Of the 30 never-finaled permits, 4 are 3 to 5 years old, 25 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 9 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 316 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2025 | Completed final sign-off Jun 2026 | 1015 Francisco St | front bldg/unit 3: revision to 202412207243 to comply w/ nov 202533079. modift 1/2 bath to full bath. adding 1/2 bath, remodel kitchen w/ wall removal. no exterior workDetails
front bldg/unit 3: revision to 202412207243 to comply w/ nov 202533079. modift 1/2 bath to full bath. adding 1/2 bath, remodel kitchen w/ wall removal. no exterior work | $20,000 |
| May 7, 2024 | Expired or cancelled expired Nov 2025 | 201 Waller St | remodel kitchen and 3.5 baths. like for like. (e) (unit #303)Details
remodel kitchen and 3.5 baths. like for like. (e) (unit #303) | $62,000 |
| Jun 5, 2023 | Expired or cancelled cancelled Jan 2026 | 3214 Fillmore St | g/f: fill in doorway at (e) closet to bathroom.install new door at bathroom (n) opening.Details
g/f: fill in doorway at (e) closet to bathroom.install new door at bathroom (n) opening. | $3,500 |
| Jan 4, 2023 | Completed final sign-off Oct 2023 | 3531 16th St | remove/replace in kind (2) existing bathrooms & (1) existing kitchen.Details
remove/replace in kind (2) existing bathrooms & (1) existing kitchen. | $25,000 |
| Sep 16, 2019 | Completed final sign-off Mar 2021 | 2701 Green St | unit 2: remove replace e kitchen cabinets, bath cabinets, tile as needed, repair drywallDetails
unit 2: remove replace e kitchen cabinets, bath cabinets, tile as needed, repair drywall | $15,000 |
| Aug 3, 2018 | Completed final sign-off Apr 2019 | 3177 16th St | ti - ground flr (hair salon) construction of new partitioan walls, new lighting & plumbing fixtures, new accessible bathroom and some new interior finishes. mech, ele, plm engineering will be done by design build contractiors. no structuralDetails
ti - ground flr (hair salon) construction of new partitioan walls, new lighting & plumbing fixtures, new accessible bathroom and some new interior finishes. mech, ele, plm engineering will be done by design build contractiors. no structural | $50,000 |
| Jul 28, 2017 | Never finaled issued Jul 2017, no final | 246 Hartford St | remodel bath in kind, in lower unit. no moving of walls, doors, or windows.Details
remodel bath in kind, in lower unit. no moving of walls, doors, or windows. | $20,000 |
| May 26, 2016 | Completed final sign-off May 2019 | 413 Los Palmos Dr | (n) 411 sq.ft. bedroom addition, (n) 470 sq.ft. lower deck/stairs, and (n) 393 sq.ft upper fl balcony/stairs. lower fl bathroom remodel.Details
(n) 411 sq.ft. bedroom addition, (n) 470 sq.ft. lower deck/stairs, and (n) 393 sq.ft upper fl balcony/stairs. lower fl bathroom remodel. | $80,000 |
| Feb 23, 2016 | Completed final sign-off Nov 2016 | 771 36th Av | relocate/remodel 1st floor bathroom and remodel kitchen. replace 1 exterior front window and 1 rear window. remodel upstairs bathroom. no additional sq ft. to comply with nov #201699371Details
relocate/remodel 1st floor bathroom and remodel kitchen. replace 1 exterior front window and 1 rear window. remodel upstairs bathroom. no additional sq ft. to comply with nov #201699371 | $5,000 |
| Dec 30, 2015 | Completed final sign-off Nov 2016 | 771 36th Av | interior remodel, replace kitchen cabinets, finishes & fixtures; (2) bathrooms (powder & full bath), replace fixtures & cabinets; no change to walls, doors or windows. no structural work.Details
interior remodel, replace kitchen cabinets, finishes & fixtures; (2) bathrooms (powder & full bath), replace fixtures & cabinets; no change to walls, doors or windows. no structural work. | $35,000 |
| Nov 3, 2015 | Completed final sign-off Dec 2016 | 470 Paris St | demo (e) kitchen move down stairs-relocate, remove single pane window @ 1st flr replace in kind, remove stair case @ rear relocate inside, add one new bath & lr @ 1st flrDetails
demo (e) kitchen move down stairs-relocate, remove single pane window @ 1st flr replace in kind, remove stair case @ rear relocate inside, add one new bath & lr @ 1st flr | $40,000 |
| Jan 7, 2015 | Completed final sign-off Mar 2015 | 1000 North Point St | refresh of condominium unit #305. removing and replacing flooring, paint, kitchen cabinets,new appliances, new bathroom vanity, and refinishing bathtub.Details
refresh of condominium unit #305. removing and replacing flooring, paint, kitchen cabinets,new appliances, new bathroom vanity, and refinishing bathtub. | $19,000 |