Back to bathroom remodel contractors
Brendan Waters Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Aug 2026
- Last 24 months
- 9 permits filed
204 permits since 2000: 162 completed, 6 in progress, 25 never finaled, 11 expired or cancelled.
Of the 25 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
78 bathroom remodel permits: 57 completed, 4 in progress, 9 never finaled, 8 expired or cancelled. Typically 1 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Aug 2026 | 1379 06th Av | 1 primary bathroom and 1 power room remodel in kind. all like for like. 1 kitchen remodel like for like. all work interior. poweder room and kitchen 1st flr and primary bathroom 2nd flr.Details
1 primary bathroom and 1 power room remodel in kind. all like for like. 1 kitchen remodel like for like. all work interior. poweder room and kitchen 1st flr and primary bathroom 2nd flr. | $120,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 314 Locust St | first floor: bathroom remodel like for like, no conversions, no walls being moved. all like for like.Details
first floor: bathroom remodel like for like, no conversions, no walls being moved. all like for like. | $15,000 |
| Jul 18, 2025 | In progress issued Aug 2025 | 181 De Soto St | remodel kitchen and half bath on main level; remodel bathroom and add bathroom on upper level. no exterior workDetails
remodel kitchen and half bath on main level; remodel bathroom and add bathroom on upper level. no exterior work | $50,000 |
| Jul 1, 2025 | In progress issued Jul 2025 | 181 De Soto St | replace bathroom fixtures and tile in kind basement bathroom no wall demolition or construction. no change in plumbing fixture count.Details
replace bathroom fixtures and tile in kind basement bathroom no wall demolition or construction. no change in plumbing fixture count. | $15,000 |
| Jun 27, 2025 | Expired or cancelled withdrawn Jul 2025 | 181 De Soto St | all interior work. remodel kitchen & bathroom on main level. remodel upper fl bathroom and add bathroom. remodel lower level bathroomDetails
all interior work. remodel kitchen & bathroom on main level. remodel upper fl bathroom and add bathroom. remodel lower level bathroom | $180,000 |
| Jan 7, 2025 | Completed final sign-off Oct 2025 | 44 Hartford St | residential alteration kitchen remodel and enlarge opening to dining room replace exterior rear door and window. addition of lav in (e) toilet room. relocation of laundry to 2nd floor addition of bathroom on top level . pitched roof to be raised over (n) bathroom and (e) closetDetails
residential alteration kitchen remodel and enlarge opening to dining room replace exterior rear door and window. addition of lav in (e) toilet room. relocation of laundry to 2nd floor addition of bathroom on top level . pitched roof to be raised over (n) bathroom and (e) closet | $150,000 |
| Aug 27, 2024 | Completed final sign-off Dec 2025 | 1238 26th Av | remodel to existing 3-story single family dwelling including existing kitchen and bathrooms plus a new 1/2 bath. no additional square footing and no explansion of existing building envelope.Details
remodel to existing 3-story single family dwelling including existing kitchen and bathrooms plus a new 1/2 bath. no additional square footing and no explansion of existing building envelope. | $200,000 |
| Jun 18, 2024 | Completed final sign-off Nov 2024 | 72 Molimo Dr | 1st fl - legalize bedroom. add 1 full bathDetails
1st fl - legalize bedroom. add 1 full bath | $65,000 |
| Apr 12, 2024 | Completed final sign-off Oct 2024 | 29 San Leandro Wy | revision to permit 202402296794 (remodel one bathroom in kind). interior remodel - 1/f: removal of foyer, dining, powder room and bathroom, (e) laundry and reconfiguration of stairs. 2/f: alteration of bedrooms and bathrooms, addition of primary suite, replacement of relocation of furnace & laundry.Details
revision to permit 202402296794 (remodel one bathroom in kind). interior remodel - 1/f: removal of foyer, dining, powder room and bathroom, (e) laundry and reconfiguration of stairs. 2/f: alteration of bedrooms and bathrooms, addition of primary suite, replacement of relocation of furnace & laundry. | $180,000 |
| Feb 29, 2024 | Completed final sign-off Oct 2024 | 29 San Leandro Wy | remove lath and plaster from interior walls in living room, dining room, and staircase walls (for engr to access). replace with gyp board after investigation. remodel one bathroom (in kind).Details
remove lath and plaster from interior walls in living room, dining room, and staircase walls (for engr to access). replace with gyp board after investigation. remodel one bathroom (in kind). | $2,000 |
| Oct 30, 2023 | Completed final sign-off Nov 2023 | 209 Upper Tr | install 7 new windows at back of house in prmary suit and bathroom.Details
install 7 new windows at back of house in prmary suit and bathroom. | $3,500 |
| Jun 2, 2023 | Completed final sign-off Nov 2023 | 209 Upper Tr | master bathroom remodel in kind- guest bathroom remodel in kind. no new wall and no existing wall relocation. all plumbing fixtures count remain same. new lighting shall comply with cec 150.0(k)5.Details
master bathroom remodel in kind- guest bathroom remodel in kind. no new wall and no existing wall relocation. all plumbing fixtures count remain same. new lighting shall comply with cec 150.0(k)5. | $20,000 |
| Jan 31, 2023 | Completed final sign-off Sep 2023 | 14 Clayton St | unit 14 & 16: remodel 2 kitchen, 2 bathroom and 1/2/ bath in both units in-kind.Details
unit 14 & 16: remodel 2 kitchen, 2 bathroom and 1/2/ bath in both units in-kind. | $140,000 |
| Oct 4, 2022 | Never finaled issued Jan 2023, no final | 60 Temescal Tr | interior remodel including conversion of 252 sq ft of unconditioned space to conditioned within extg bldg envelope; includes new interior stairway, new half bath, and new laundry room.Details
interior remodel including conversion of 252 sq ft of unconditioned space to conditioned within extg bldg envelope; includes new interior stairway, new half bath, and new laundry room. | $150,000 |
| Sep 29, 2022 | Never finaled issued Sep 2022, no final | 60 Temescal Tr | two bathroom remodel: one master bath- like for like. one guest bath 70 sqft remove ada tub and install shower. no structural/ no changes to walls or openings.Details
two bathroom remodel: one master bath- like for like. one guest bath 70 sqft remove ada tub and install shower. no structural/ no changes to walls or openings. | $45,000 |
| May 11, 2022 | Completed final sign-off Oct 2022 | 385 Corbett Av | remodel kitchen area, add half bath on the main level per plan. all interior work.Details
remodel kitchen area, add half bath on the main level per plan. all interior work. | $40,000 |
| Dec 8, 2021 | Completed final sign-off Feb 2023 | 1371 08th Av | 2nd fl - remodel kitchen including removing a section of center wall; re-configure half bath and pantry. all interior workDetails
2nd fl - remodel kitchen including removing a section of center wall; re-configure half bath and pantry. all interior work | $40,000 |
| Apr 6, 2021 | Completed final sign-off Mar 2022 | 222 Bocana St | revision to pa 202009305595. convert existing covered light well on 2nd flr into a closet. remove skylight and cover with roof to match existing. add new skylight over (e) bath. install air conditioning and replace a.c unit on roof.Details
revision to pa 202009305595. convert existing covered light well on 2nd flr into a closet. remove skylight and cover with roof to match existing. add new skylight over (e) bath. install air conditioning and replace a.c unit on roof. | $18,000 |
| Oct 13, 2020 | Completed final sign-off Nov 2023 | 422 Missouri St | 3-story rear addition, (n) rear deck "pop-out". interior remodel of miscellaneous spaces (including kitchen & bath), replace (e) windows w/ inkind wood windows, re-paint (e) wood siding & trim. no other changes to front (street) facade.Details
3-story rear addition, (n) rear deck "pop-out". interior remodel of miscellaneous spaces (including kitchen & bath), replace (e) windows w/ inkind wood windows, re-paint (e) wood siding & trim. no other changes to front (street) facade. | $350,000 |
| Sep 30, 2020 | Completed final sign-off Mar 2022 | 222 Bocana St | interior and in rrear of building exterior (not visible from street). 1st floor: new interior stair/open, that connects 2 floors. enlarge (e) office & add bath. relocate laundry. 2nd floor: remodel kitchen. reduce footprint of (e) sunroom , convert half to deck.replace skylights, reconfigure windowsDetails
interior and in rrear of building exterior (not visible from street). 1st floor: new interior stair/open, that connects 2 floors. enlarge (e) office & add bath. relocate laundry. 2nd floor: remodel kitchen. reduce footprint of (e) sunroom , convert half to deck.replace skylights, reconfigure windows | $95,000 |
| Sep 28, 2020 | Completed final sign-off Jul 2021 | 251 Bocana St | remodel kitchen & upstairs bathroom in-kindDetails
remodel kitchen & upstairs bathroom in-kind | $60,000 |
| Aug 24, 2020 | Completed final sign-off May 2021 | 3960 18th St | unit a: interior remodel to 1 one condo on 4th floor consisting of reconfiguring existing kitchen & bath. add a 2nd bath and a new w/d closet. all associated electrical & plumbing included. no work on exterior of building.Details
unit a: interior remodel to 1 one condo on 4th floor consisting of reconfiguring existing kitchen & bath. add a 2nd bath and a new w/d closet. all associated electrical & plumbing included. no work on exterior of building. | $125,000 |
| Mar 16, 2020 | Completed final sign-off Jan 2021 | 2471 24th Av | remodel bathroom and kitchen in kind on 2nd floor.Details
remodel bathroom and kitchen in kind on 2nd floor. | $55,000 |
| Mar 10, 2020 | Completed final sign-off Jan 2024 | 591 29th Av | interior remodel: ground fl convert 423 sf of (e) garage into a new family room accessible by (e) interior stair, 2nd fl. reconfigure layout of 2 bathrooms and 2 closets, 1st fl. add new exterior stair lower than 10' from grade within building areaDetails
interior remodel: ground fl convert 423 sf of (e) garage into a new family room accessible by (e) interior stair, 2nd fl. reconfigure layout of 2 bathrooms and 2 closets, 1st fl. add new exterior stair lower than 10' from grade within building area | $60,000 |
| Nov 1, 2019 | Completed final sign-off Oct 2020 | 4320 24th St | 2nd floor: remodel kitchen and bathroom per plan including remove a section of wall. no exterior work. (n) skylights u factor +0.32Details
2nd floor: remodel kitchen and bathroom per plan including remove a section of wall. no exterior work. (n) skylights u factor +0.32 | $30,000 |
| Feb 22, 2019 | Completed final sign-off Oct 2019 | 1949 15th St | remodel kitchen & bathroom new electriacal & plumbing all staying in same location moving no wallsDetails
remodel kitchen & bathroom new electriacal & plumbing all staying in same location moving no walls | $50,000 |
| Oct 15, 2018 | Completed final sign-off Jul 2019 | 571 Page St | demo (e) wall between kitchen & living room. demo bathroom, partial kithcne remode, (n) bathroom, replace window in bath & powder room same size as (e) windows, replace exterior doors in kitchen,& bedrooms, replace interior doors througout (n) wood flooring & (n) lighting throug out,Details
demo (e) wall between kitchen & living room. demo bathroom, partial kithcne remode, (n) bathroom, replace window in bath & powder room same size as (e) windows, replace exterior doors in kitchen,& bedrooms, replace interior doors througout (n) wood flooring & (n) lighting throug out, | $120,000 |
| Aug 7, 2018 | Completed final sign-off Feb 2019 | 54 Bradford St | 1st add 1 bedroom and 1 full bath, 2nd fl remodel kitchenDetails
1st add 1 bedroom and 1 full bath, 2nd fl remodel kitchen | $55,000 |
| Jul 5, 2018 | Completed final sign-off Feb 2020 | 2971 21st St | interior remodel of (e) 2 story sfd. remodel kitchen and 1/2 bath plus associated structural, plumbing & electrical work. no new sq ft & no new work thatis visible from the streetDetails
interior remodel of (e) 2 story sfd. remodel kitchen and 1/2 bath plus associated structural, plumbing & electrical work. no new sq ft & no new work thatis visible from the street | $75,000 |
| Jun 21, 2018 | Completed final sign-off Sep 2018 | 1565 Page St | unit a: bathroom and kitchen remodel. change out all fixtures and cabinets. replace in kind . existing walls to remain in placeDetails
unit a: bathroom and kitchen remodel. change out all fixtures and cabinets. replace in kind . existing walls to remain in place | $65,000 |
| Mar 21, 2018 | Completed final sign-off Oct 2018 | 151 Banks St | remodel kitchen and bathroom, add half bath, legalize full bath @ 1st floorDetails
remodel kitchen and bathroom, add half bath, legalize full bath @ 1st floor | $26,000 |
| Mar 19, 2018 | Completed final sign-off Jul 2018 | 241 Ashbury St | replace all plumbing fitcures in 1.2 bathroom and full bathroom. replace tile where neededDetails
replace all plumbing fitcures in 1.2 bathroom and full bathroom. replace tile where needed | $11,000 |
| Nov 13, 2017 | Completed final sign-off Apr 2018 | 168 Kenwood Wy | at 1st floor -convert existing powder room to full bathroom. remodel laundry room. no structral work.Details
at 1st floor -convert existing powder room to full bathroom. remodel laundry room. no structral work. | $16,500 |
| Jan 25, 2017 | Completed final sign-off Jan 2018 | 6 Encline Ct | bathroom and kitchen remodelDetails
bathroom and kitchen remodel | $35,000 |
| Jan 12, 2017 | Completed final sign-off Jun 2017 | 1375 08th Av | interior remodel kitchen and den area on 2nd floor. interior remodel bathrooms, walk in closet. laundry closet on 3rd floor.Details
interior remodel kitchen and den area on 2nd floor. interior remodel bathrooms, walk in closet. laundry closet on 3rd floor. | $50,000 |
| Mar 17, 2016 | Completed final sign-off Mar 2018 | 230 Acadia St | horizontal addition to (e) 3rd flr to include: new bathroom, dormer, roofdeck, closet, office and enlarge existing bedroom.Details
horizontal addition to (e) 3rd flr to include: new bathroom, dormer, roofdeck, closet, office and enlarge existing bedroom. | $50,000 |
| Feb 25, 2016 | Expired or cancelled expired Jan 2018 | 448 Gold Mine Dr | remodel kitchen and baths per planDetails
remodel kitchen and baths per plan | $30,000 |
| Feb 17, 2016 | Expired or cancelled expired Jan 2018 | 448 Gold Mine Dr | remodel kitchen and master bathroom. new shower pan, double vanity from single, install fan, new tile. kitchen - all new cabinets and extractor fan. no structural work. replace in kindDetails
remodel kitchen and master bathroom. new shower pan, double vanity from single, install fan, new tile. kitchen - all new cabinets and extractor fan. no structural work. replace in kind | $45,000 |
| Dec 17, 2015 | Completed final sign-off Aug 2016 | 1337 Cole St | demo of (e) exterior stairwell along side property line & incorporation of exterior space into new common storage room at 1st floor garage and new conditioned square - footage at bathroom remodel of 2nd floor unit. new work at 3rd floor unit to be subject of separate permit. no work visible from strDetails
demo of (e) exterior stairwell along side property line & incorporation of exterior space into new common storage room at 1st floor garage and new conditioned square - footage at bathroom remodel of 2nd floor unit. new work at 3rd floor unit to be subject of separate permit. no work visible from str | $85,000 |
| Dec 17, 2015 | Completed final sign-off Aug 2016 | 1339 Cole St | demo of (e) exterior stairwell along side property line & incorporation of exterior space into new conditioned square footage at bathroom remodel of 3rd floor unit. new work at 1st and 2nd floor unit to be subject of separate permit. no work visible from street.Details
demo of (e) exterior stairwell along side property line & incorporation of exterior space into new conditioned square footage at bathroom remodel of 3rd floor unit. new work at 1st and 2nd floor unit to be subject of separate permit. no work visible from street. | $75,000 |
| Dec 1, 2015 | Completed final sign-off Jun 2016 | 235 Vicente St | 2nd fl remodel kitchen and bath. 3rd fl remodel bathDetails
2nd fl remodel kitchen and bath. 3rd fl remodel bath | $40,000 |
| Jan 30, 2015 | Completed final sign-off Jun 2015 | 397 30th St | remodel bathroom, new fixtures, new vanity & retile. cosmetic remodel in unit#397.Details
remodel bathroom, new fixtures, new vanity & retile. cosmetic remodel in unit#397. | $15,000 |
| Oct 16, 2014 | Expired or cancelled expired Feb 2017 | 124 Banks St | remodel 1 bathroom and 1 kitchen, all new fixtures and cabinetry on top level unit. no change in walls & openings layout, bathroom lighting shall have main light high efficacy & others if not high efficacy to be controlled by manual on sensor. kitchen lighting min. 50% wattage high efficacy.Details
remodel 1 bathroom and 1 kitchen, all new fixtures and cabinetry on top level unit. no change in walls & openings layout, bathroom lighting shall have main light high efficacy & others if not high efficacy to be controlled by manual on sensor. kitchen lighting min. 50% wattage high efficacy. | $35,000 |
| May 13, 2014 | Completed final sign-off Apr 2015 | 1270 33rd Av | provide new master bathroom, reconfigure interior walls for (2) existing closets, provide (2) new closets, (1z0 new linen closet & a hallway extension. all work on top floor).Details
provide new master bathroom, reconfigure interior walls for (2) existing closets, provide (2) new closets, (1z0 new linen closet & a hallway extension. all work on top floor). | $25,000 |
| May 7, 2014 | Never finaled issued May 2014, no final | 575 Head St | comply with nov# 201465051 by housing inspection, remove sink & counter, cap plumbing. legalize bathroom on 1/f.Details
comply with nov# 201465051 by housing inspection, remove sink & counter, cap plumbing. legalize bathroom on 1/f. | $3,000 |
| Apr 22, 2014 | Completed final sign-off Jun 2015 | 142 Elsie St | remodel kitchen on 1st floor, remove a wall, install new beam, remodel bathroom on 3rd floor.Details
remodel kitchen on 1st floor, remove a wall, install new beam, remodel bathroom on 3rd floor. | $40,000 |
| Apr 8, 2014 | Completed final sign-off Dec 2014 | 407 Cortland Av | remodel kitchen and one bathroom and 1/2 bath, install door and rear of house, same locationDetails
remodel kitchen and one bathroom and 1/2 bath, install door and rear of house, same location | $75,000 |
| Jan 14, 2014 | Completed final sign-off Jul 2014 | 1335 Filbert St | remodel bathroom, replace tile and fixtures, install vanity. replace windows in kind, same opening. not visible from street. layout to remain the same, no wall moved removed or addedDetails
remodel bathroom, replace tile and fixtures, install vanity. replace windows in kind, same opening. not visible from street. layout to remain the same, no wall moved removed or added | $15,000 |
| Jan 7, 2014 | Completed final sign-off Feb 2014 | 862 Wisconsin St | legalize living space on 1st floor including a bathroom. comply w/sf green bldg code "table 4"Details
legalize living space on 1st floor including a bathroom. comply w/sf green bldg code "table 4" | $30,000 |
| Oct 3, 2013 | Completed final sign-off Dec 2013 | 1382 07th Av | add a half bath to extg laundry room and officeDetails
add a half bath to extg laundry room and office | $4,000 |
| Apr 26, 2013 | Never finaled issued Apr 2013, no final | 160 29th Av | partial excavation of (e) basement/garage at rear of (e) house to increase head height & conversion to study, bathroom, laundry & storage. rebuild entry stair at rear.Details
partial excavation of (e) basement/garage at rear of (e) house to increase head height & conversion to study, bathroom, laundry & storage. rebuild entry stair at rear. | $85,000 |
| Apr 15, 2013 | Completed final sign-off Jun 2013 | 528 Filbert St | shower remodel, (n) bathroom tiled floor, install (n) vanity, 8x7 approx.Details
shower remodel, (n) bathroom tiled floor, install (n) vanity, 8x7 approx. | $14,133 |
| Apr 1, 2013 | Completed final sign-off Aug 2013 | 199 Bonview St | remodel of existing bath, two bedrooms & closets (2 new skylights, not visible from street.) no work on ground floor.Details
remodel of existing bath, two bedrooms & closets (2 new skylights, not visible from street.) no work on ground floor. | $30,000 |
| Mar 8, 2013 | Completed final sign-off Nov 2013 | 290 Precita Av | legalize ground floor living space including a bathroom. build new stair connecting 2 floors interior. to comply with nov #201246423Details
legalize ground floor living space including a bathroom. build new stair connecting 2 floors interior. to comply with nov #201246423 | $30,000 |
| Mar 6, 2013 | Completed final sign-off Sep 2013 | 2236 15th St | full bathroom remodelDetails
full bathroom remodel | $15,000 |
| Feb 11, 2013 | Completed final sign-off Jun 2013 | 1419 47th Av | replace windows & siding on front facade. change out cabinets in both units. re-tile 2 kitchens, 4 bathrooms. replace windows at back of house in kind, 14 windows total. no change on walls & openingsDetails
replace windows & siding on front facade. change out cabinets in both units. re-tile 2 kitchens, 4 bathrooms. replace windows at back of house in kind, 14 windows total. no change on walls & openings | $70,000 |
| Dec 5, 2012 | Completed final sign-off Nov 2014 | 82 Cameo Wy | renovation of (e) 2 story residence-update interior finishes, windows & roofing. re-configure (e) kitchen & (e) master bathroom, replace (e) decks in kind. no new square footage added. m.e.p systems to be design build. (e) window opening at front to be modified.Details
renovation of (e) 2 story residence-update interior finishes, windows & roofing. re-configure (e) kitchen & (e) master bathroom, replace (e) decks in kind. no new square footage added. m.e.p systems to be design build. (e) window opening at front to be modified. | $90,000 |
| Nov 29, 2012 | Completed final sign-off Mar 2013 | 93 Sequoia Wy | kitchen & bathroom remodel including structural change of wall & framing per plan. verify/legalize bedroom & deck on ground floor.Details
kitchen & bathroom remodel including structural change of wall & framing per plan. verify/legalize bedroom & deck on ground floor. | $30,000 |
| Oct 2, 2012 | Never finaled issued Oct 2012, no final | 160 29th Av | remodel master bath, relocate 2nd bath. replace fixtures and finishes.Details
remodel master bath, relocate 2nd bath. replace fixtures and finishes. | $25,000 |
| Jun 13, 2012 | Completed final sign-off Aug 2013 | 1462 11th Av | 2nd floor: kitchen remodel, bath remodel, new bath. 1st floor: conversion of unconditional space to include addtitional laundry, bath, family room & bedroom.Details
2nd floor: kitchen remodel, bath remodel, new bath. 1st floor: conversion of unconditional space to include addtitional laundry, bath, family room & bedroom. | $125,000 |
| Jun 11, 2012 | Completed final sign-off Dec 2012 | 4754 17th St | bathroom remodel,change out fixtures and new tile.Details
bathroom remodel,change out fixtures and new tile. | $17,000 |
| Jun 4, 2012 | Never finaled issued Jun 2012, no final | 200 Randall St | change out 1 kitchen cabinet, remodel 1 bath, new fixtures, tile, fixture to remain in same location. non structuralDetails
change out 1 kitchen cabinet, remodel 1 bath, new fixtures, tile, fixture to remain in same location. non structural | $35,000 |
| May 24, 2012 | Never finaled issued Nov 2012, no final | 160 29th Av | horizontal addition in rear to basement & 1/f. remodel existing kitchen & bathrooms, rebuild (e) stairs @ north side of house in (e) configuration. build (n) deck @ rear, reconfigure doors/windows at rear of house.Details
horizontal addition in rear to basement & 1/f. remodel existing kitchen & bathrooms, rebuild (e) stairs @ north side of house in (e) configuration. build (n) deck @ rear, reconfigure doors/windows at rear of house. | $100,000 |
| Apr 20, 2012 | Completed final sign-off Oct 2013 | 4722 19th St | 2 kitchens & 2 bathrooms remodel, change in kind windows using marvin wood clad in (e) spaces at front, drywall repair in all rooms, replace kitchen and bathroom with vinyl windows. not visable from street, u-factor =0.40 max. new lighting in ceiling shall be high efficacy, new bathroom exhaust fanDetails
2 kitchens & 2 bathrooms remodel, change in kind windows using marvin wood clad in (e) spaces at front, drywall repair in all rooms, replace kitchen and bathroom with vinyl windows. not visable from street, u-factor =0.40 max. new lighting in ceiling shall be high efficacy, new bathroom exhaust fan | $65,000 |
| Oct 19, 2011 | Completed final sign-off Jul 2012 | 209 Upper Tr | kitchen remodel, one bathroom remodel, window replacement at kitchen in back of building total of 8. add 1/2 bath at main level.Details
kitchen remodel, one bathroom remodel, window replacement at kitchen in back of building total of 8. add 1/2 bath at main level. | $65,000 |
| May 13, 2011 | Never finaled issued May 2011, no final | 4404 18th St | remodel guest bathroom on 1/f, new bathtub, shower, vanity, toilet & tile. no expansion, same location.Details
remodel guest bathroom on 1/f, new bathtub, shower, vanity, toilet & tile. no expansion, same location. | $9,000 |
| Feb 22, 2011 | Completed final sign-off Jan 2013 | 82 El Sereno Ct | remodel two bathrooms; one upstair, one downstair. no change in fixture locations. habitable space on ground floor is permitted. high efficiency lighting of occupancy sensor control.Details
remodel two bathrooms; one upstair, one downstair. no change in fixture locations. habitable space on ground floor is permitted. high efficiency lighting of occupancy sensor control. | $30,000 |
| Dec 9, 2010 | Completed final sign-off Aug 2011 | 2863 Washington St | interior renovation of 2 bedrooms and 2 baths at rear of unit. to include new french doors out to existing deckDetails
interior renovation of 2 bedrooms and 2 baths at rear of unit. to include new french doors out to existing deck | $45,000 |
| Jul 7, 2010 | Completed final sign-off Jul 2011 | 316 Rutledge St | interior renovation.renovate existing master bath& kitchen. raise ceiling from flat to sloped at family room & kitchen. replace exg interior stairs. add 3-skylights.Details
interior renovation.renovate existing master bath& kitchen. raise ceiling from flat to sloped at family room & kitchen. replace exg interior stairs. add 3-skylights. | $160,000 |
| Mar 16, 2010 | Never finaled issued Mar 2010, no final | 600 11th Av | interior remodeling incl. bath and kitchen, reconfigure int. stairs to ground lvl. add (n) french doors and (n) windows and decorative railings at rear of bldg on 1st fl ( corner bldg). add (n) full bath on 2nd flDetails
interior remodeling incl. bath and kitchen, reconfigure int. stairs to ground lvl. add (n) french doors and (n) windows and decorative railings at rear of bldg on 1st fl ( corner bldg). add (n) full bath on 2nd fl | $25,000 |
| May 29, 2009 | Completed final sign-off Jul 2009 | 2274 Fulton St | bathroom remodel drywall tile new fixtures (upper unit)Details
bathroom remodel drywall tile new fixtures (upper unit) | $9,500 |
| Apr 6, 2009 | Completed final sign-off Jun 2009 | 900 Bush St | work @ unit# 218 only. remodel of kitchen 7 bathroom. no structural. same opening, remove & replace kitchen cabinets & appliances 6' x 8'. remove bathroom vanity & replace new bath & shower & shower door 9 x 5.Details
work @ unit# 218 only. remodel of kitchen 7 bathroom. no structural. same opening, remove & replace kitchen cabinets & appliances 6' x 8'. remove bathroom vanity & replace new bath & shower & shower door 9 x 5. | $26,739 |
| Mar 19, 2009 | Completed final sign-off Mar 2010 | 1000 North Point St | remodel kitchen & bathroom - complete with all new cabinets, fixtures, tiles, flooring of unit. no door & no window work on this permit. nov 200455433/pid.Details
remodel kitchen & bathroom - complete with all new cabinets, fixtures, tiles, flooring of unit. no door & no window work on this permit. nov 200455433/pid. | $30,000 |
| Nov 30, 2006 | Expired or cancelled expired Jan 2008 | 155 San Fernando Wy | this is a revision to pa# 200610124797-remodel 2 bathrooms at 2nd floor, plumbing/electrical, re-tile to be performed and change out fixtures.Details
this is a revision to pa# 200610124797-remodel 2 bathrooms at 2nd floor, plumbing/electrical, re-tile to be performed and change out fixtures. | $15,000 |
| Oct 12, 2006 | Expired or cancelled expired Jan 2008 | 155 San Fernando Wy | 1 kitchen @ 1st floor & 1 bathroom @ 2nd floor remodel. no window replacement.Details
1 kitchen @ 1st floor & 1 bathroom @ 2nd floor remodel. no window replacement. | $28,000 |
| Mar 15, 2006 | Completed final sign-off Aug 2006 | 762 Chenery St | total bathroom remodel upstairs. no structural work.Details
total bathroom remodel upstairs. no structural work. | $12,000 |
| May 17, 2005 | Expired or cancelled expired Feb 2007 | 34 Elsie St | remodel kitchen & bathroom. electrical & plumbing updates, replace window, remove wallDetails
remodel kitchen & bathroom. electrical & plumbing updates, replace window, remove wall | $50,000 |
| Jan 3, 2005 | Expired or cancelled expired Sep 2005 | 662 Arguello Bl | new plumbing + electrical in bathroom furnace in attic above bathroomDetails
new plumbing + electrical in bathroom furnace in attic above bathroom | $4,000 |