Boaz Mor Design & Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to Apr 2026
- Last 24 months
- 9 permits filed
32 permits since 2000: 18 completed, 10 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 1 in progress, 1 expired or cancelled. Typically 41 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2023 | In progress issued Nov 2023 | 1033 Green St | basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear sidingDetails
basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear siding | $200,000 |
| Jan 27, 2023 | Expired or cancelled withdrawn Jul 2025 | 23 Mirabel Av | deck changes reducing size of 3rd story deck. widening 2nd story deck. removal of existing stair case between 2nd & 3rd story. adding spiral staircase between 2nd & 3rd story.Details
deck changes reducing size of 3rd story deck. widening 2nd story deck. removal of existing stair case between 2nd & 3rd story. adding spiral staircase between 2nd & 3rd story. | $30,000 |
| Jul 10, 2018 | Completed final sign-off Oct 2020 | 56 Mirabel Av | add vertical clearance to(e)garage space by excavating within(e) ftprint.new extr stair to access garage via backyard.garage incl genl uncond space plus 1 bathroom,laundry&cond multipurpose rm.(n) bathrm&expd kitcehn openg at 2/f.2 new wood casement windows at frt.expd back area of garage.Details
add vertical clearance to(e)garage space by excavating within(e) ftprint.new extr stair to access garage via backyard.garage incl genl uncond space plus 1 bathroom,laundry&cond multipurpose rm.(n) bathrm&expd kitcehn openg at 2/f.2 new wood casement windows at frt.expd back area of garage. | $100,000 |
| Mar 14, 2012 | Completed final sign-off May 2012 | 431 Dolores St | to comply with complaint #201188326. repair exisitng rear stair in kind less than 50% of structure.Details
to comply with complaint #201188326. repair exisitng rear stair in kind less than 50% of structure. | $19,700 |
| Oct 13, 2011 | Completed final sign-off Feb 2012 | 424 Murray St | installing a hot tub within an existing deck at the rear.the hot tub is to be properd into an opening in (e) deck cut to accommodate it, (e) deck + 42" rail to remain, (e) stairs to remain, tub is supported independently of deck supports, no alter to front,no increase in height, no hori to footprintDetails
installing a hot tub within an existing deck at the rear.the hot tub is to be properd into an opening in (e) deck cut to accommodate it, (e) deck + 42" rail to remain, (e) stairs to remain, tub is supported independently of deck supports, no alter to front,no increase in height, no hori to footprint | $9,800 |