Back to bathroom remodel contractors
Boaz Mor Design & Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to Apr 2026
- Last 24 months
- 9 permits filed
32 permits since 2000: 18 completed, 10 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 4 completed, 3 in progress. Typically 63 days from filing to permit and 342 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2026 | In progress issued Feb 2026 | 215 29th St | unit 215-1/2 29th st. - revision to permit 202512091286. framing repair to dryrot arount bathroom door, bathroom window, bedroom closet and laundry room door (in-kind, no structural alterations)Details
unit 215-1/2 29th st. - revision to permit 202512091286. framing repair to dryrot arount bathroom door, bathroom window, bedroom closet and laundry room door (in-kind, no structural alterations) | |
| Dec 9, 2025 | In progress issued Dec 2025 | 215 29th St | unit 1/2: bathroom remodel in-kind, showerpan. kitchen remodel in-kind, cabinets and appliances.Details
unit 1/2: bathroom remodel in-kind, showerpan. kitchen remodel in-kind, cabinets and appliances. | $119,500 |
| Sep 11, 2023 | In progress issued Nov 2023 | 1033 Green St | basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear sidingDetails
basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear siding | $200,000 |
| Mar 12, 2020 | Completed final sign-off Oct 2020 | 56 Mirabel Av | revision to pa #2018-0710-4122: partial renovation to existing bathroom in the existing location. replacement of rear bedroom window in kind due to dry rot issues.Details
revision to pa #2018-0710-4122: partial renovation to existing bathroom in the existing location. replacement of rear bedroom window in kind due to dry rot issues. | $10,000 |
| Jul 10, 2018 | Completed final sign-off Oct 2020 | 56 Mirabel Av | add vertical clearance to(e)garage space by excavating within(e) ftprint.new extr stair to access garage via backyard.garage incl genl uncond space plus 1 bathroom,laundry&cond multipurpose rm.(n) bathrm&expd kitcehn openg at 2/f.2 new wood casement windows at frt.expd back area of garage.Details
add vertical clearance to(e)garage space by excavating within(e) ftprint.new extr stair to access garage via backyard.garage incl genl uncond space plus 1 bathroom,laundry&cond multipurpose rm.(n) bathrm&expd kitcehn openg at 2/f.2 new wood casement windows at frt.expd back area of garage. | $100,000 |
| Dec 22, 2016 | Completed final sign-off Dec 2017 | 1786 10th Av | interior bath renovation of existing location on 2nd floor. repair & replace in kind rear guardrail @ 3rd floor. replacement clad-wd windows at existing locations 2nd floor rear. total (6). no work visible from the street.Details
interior bath renovation of existing location on 2nd floor. repair & replace in kind rear guardrail @ 3rd floor. replacement clad-wd windows at existing locations 2nd floor rear. total (6). no work visible from the street. | $25,000 |
| Jun 23, 2015 | Completed final sign-off Sep 2018 | 45 Mirabel Av | (n) partition walls @ 2nd fl kitchen & bathroom remodel. switch out (e) sliding glass doors @ rear wall. add bay to rear of bldg, previously approved under permit #200212113304-s1. replace part of (e) roof @ rear. re-roof entire roof.Details
(n) partition walls @ 2nd fl kitchen & bathroom remodel. switch out (e) sliding glass doors @ rear wall. add bay to rear of bldg, previously approved under permit #200212113304-s1. replace part of (e) roof @ rear. re-roof entire roof. |