Blue Wood Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2017 to Mar 2026
- Last 24 months
- 14 permits filed
75 permits since 2000: 64 completed, 4 in progress, 7 never finaled.
Of the 7 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 5 completed, 2 in progress, 1 never finaled. Typically 7 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2026 | Completed final sign-off Apr 2026 | 386 29th St | back of bldg: repair dryrot to rear stairs, treads, decking, railing, replace in kind less than 50%.Details
back of bldg: repair dryrot to rear stairs, treads, decking, railing, replace in kind less than 50%. | $4,000 |
| Mar 19, 2026 | Completed final sign-off Jun 2026 | 1465 23rd Av | waterproof front stairs and install new tiles, less than 50% repair, street facing.Details
waterproof front stairs and install new tiles, less than 50% repair, street facing. | $2,000 |
| May 28, 2025 | In progress issued Jun 2025 | 34 Roselyn Tr | revision to permit 202408299703 & 202503202658. to add an supplemental railing detail for interior stairs.Details
revision to permit 202408299703 & 202503202658. to add an supplemental railing detail for interior stairs. | |
| May 8, 2025 | Completed final sign-off Feb 2026 | 2501 Moraga St | remodel (e) kitchen, bathroom, add 1 full bathroom. re-built interior staircase & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 1 full bath, family room, & install wetbar at g/f.Details
remodel (e) kitchen, bathroom, add 1 full bathroom. re-built interior staircase & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 1 full bath, family room, & install wetbar at g/f. | $385,000 |
| Mar 20, 2025 | In progress issued Mar 2025 | 34 Roselyn Tr | this is a revision to pa#2024-0829-9703. replace slab on grade. replace custom deck railing to pre-engineered. change rear window types. change wood partition at stair opening to glass guardrail.Details
this is a revision to pa#2024-0829-9703. replace slab on grade. replace custom deck railing to pre-engineered. change rear window types. change wood partition at stair opening to glass guardrail. | $5,000 |
| Nov 20, 2024 | Completed final sign-off Sep 2025 | 3815 Market St | 1st flor: add 1 den and 1 full bath. 2nd flr: remodel kitchen and replace 1 rear window. new glass stair railing and 1 new skylight.Details
1st flor: add 1 den and 1 full bath. 2nd flr: remodel kitchen and replace 1 rear window. new glass stair railing and 1 new skylight. | $60,000 |
| Oct 31, 2023 | Completed final sign-off Mar 2024 | 61 Buena Vista Tr | unit 61, interior alteration, remove (e) spiral staircase, (n) staircase @ (n)location, remove (e) interior wall @ 2/f, enlarge unit 59 from square footage taken from unit 61, replace (e) sliding door with (n) in same opening at back of bldg.Details
unit 61, interior alteration, remove (e) spiral staircase, (n) staircase @ (n)location, remove (e) interior wall @ 2/f, enlarge unit 59 from square footage taken from unit 61, replace (e) sliding door with (n) in same opening at back of bldg. | $20,000 |
| Oct 20, 2017 | Never finaled issued Oct 2017, no final | 1231 11th Av | to comply with complaint 201701891 make necessary repairs. repair stairs both back door landings, repair fire proofing. materials, repair smoke enclosure door, remove combustible storage. provide extinguisher, repair & paint peeling paint. stair repair < 50%Details
to comply with complaint 201701891 make necessary repairs. repair stairs both back door landings, repair fire proofing. materials, repair smoke enclosure door, remove combustible storage. provide extinguisher, repair & paint peeling paint. stair repair < 50% | $3,000 |