Blue Wood Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2017 to Mar 2026
- Last 24 months
- 14 permits filed
75 permits since 2000: 64 completed, 4 in progress, 7 never finaled.
Of the 7 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 2 completed, 2 in progress, 1 never finaled. Typically 6 days from filing to permit and 228 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2026 | Completed final sign-off Apr 2026 | 386 29th St | back of bldg: repair dryrot to rear stairs, treads, decking, railing, replace in kind less than 50%.Details
back of bldg: repair dryrot to rear stairs, treads, decking, railing, replace in kind less than 50%. | $4,000 |
| Apr 30, 2025 | Completed final sign-off Aug 2026 | 1723 32nd Av | legalize 1 bedroom, full bath & install wetbar at g/f. construct new deck at rear of building (12.5'x8'x9').Details
legalize 1 bedroom, full bath & install wetbar at g/f. construct new deck at rear of building (12.5'x8'x9'). | $137,000 |
| Mar 20, 2025 | In progress issued Mar 2025 | 34 Roselyn Tr | this is a revision to pa#2024-0829-9703. replace slab on grade. replace custom deck railing to pre-engineered. change rear window types. change wood partition at stair opening to glass guardrail.Details
this is a revision to pa#2024-0829-9703. replace slab on grade. replace custom deck railing to pre-engineered. change rear window types. change wood partition at stair opening to glass guardrail. | $5,000 |
| Sep 20, 2024 | In progress issued Jan 2025 | 34 Roselyn Tr | interior remodel and rear deck addition, replace all windows (facing front) add bathroom at 2nd floor, enlarge lower front entry doorway, add sliding glass door at rear, upgrade hvac, water heater, electrical and lighting throughout.Details
interior remodel and rear deck addition, replace all windows (facing front) add bathroom at 2nd floor, enlarge lower front entry doorway, add sliding glass door at rear, upgrade hvac, water heater, electrical and lighting throughout. | $100,000 |
| Aug 15, 2018 | Never finaled issued Aug 2018, no final | 562 Head St | remodel (e) house inside main floor: add powder room, add new deck, replace windows with alum clad wood at front. gr fl space converted into 2 bedrooms and 1 full bath. replace front doorDetails
remodel (e) house inside main floor: add powder room, add new deck, replace windows with alum clad wood at front. gr fl space converted into 2 bedrooms and 1 full bath. replace front door | $50,000 |