Back to bathroom remodel contractors
Blue Wood Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2017 to Mar 2026
- Last 24 months
- 14 permits filed
75 permits since 2000: 64 completed, 4 in progress, 7 never finaled.
Of the 7 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 17 completed, 2 in progress, 1 never finaled. Typically 15 days from filing to permit and 277 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 2, 2026 | Completed final sign-off Sep 2026 | 2116 18th Av | to abate nov 202541803 to legalize unpermitted wet bar and bathroom at garage level.Details
to abate nov 202541803 to legalize unpermitted wet bar and bathroom at garage level. | $20,000 |
| Sep 30, 2025 | In progress issued Oct 2025 | 57 Masonic Av | 2nd/fl: interior remodel at primary unit on the second floor including: remodel kitchen and existing bathroom, add new bathroom, enclose interior atrium adding 49 sf of conditioned floor area, add new skylights on flat roof.Details
2nd/fl: interior remodel at primary unit on the second floor including: remodel kitchen and existing bathroom, add new bathroom, enclose interior atrium adding 49 sf of conditioned floor area, add new skylights on flat roof. | $200,000 |
| May 19, 2025 | Completed final sign-off Jun 2026 | 1465 23rd Av | remodel (e) kitchen, add 1 new full bathroom & replace (e) sheetrock w. new at 2/f. construct 2 bedroom, 2 bathroom, family room & install wetbar at g/f including in-fill 1 bedroom. in-fill (e) light-well.Details
remodel (e) kitchen, add 1 new full bathroom & replace (e) sheetrock w. new at 2/f. construct 2 bedroom, 2 bathroom, family room & install wetbar at g/f including in-fill 1 bedroom. in-fill (e) light-well. | $439,900 |
| May 8, 2025 | Completed final sign-off Feb 2026 | 2501 Moraga St | remodel (e) kitchen, bathroom, add 1 full bathroom. re-built interior staircase & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 1 full bath, family room, & install wetbar at g/f.Details
remodel (e) kitchen, bathroom, add 1 full bathroom. re-built interior staircase & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 1 full bath, family room, & install wetbar at g/f. | $385,000 |
| Apr 30, 2025 | Completed final sign-off Aug 2026 | 1723 32nd Av | legalize 1 bedroom, full bath & install wetbar at g/f. construct new deck at rear of building (12.5'x8'x9').Details
legalize 1 bedroom, full bath & install wetbar at g/f. construct new deck at rear of building (12.5'x8'x9'). | $137,000 |
| Mar 26, 2025 | Completed final sign-off Aug 2026 | 1723 32nd Av | remodel av existing bathroom and add a new bathroom and a laurndy closet.Details
remodel av existing bathroom and add a new bathroom and a laurndy closet. | $40,000 |
| Nov 20, 2024 | Completed final sign-off Sep 2025 | 3815 Market St | 1st flor: add 1 den and 1 full bath. 2nd flr: remodel kitchen and replace 1 rear window. new glass stair railing and 1 new skylight.Details
1st flor: add 1 den and 1 full bath. 2nd flr: remodel kitchen and replace 1 rear window. new glass stair railing and 1 new skylight. | $60,000 |
| Sep 20, 2024 | In progress issued Jan 2025 | 34 Roselyn Tr | interior remodel and rear deck addition, replace all windows (facing front) add bathroom at 2nd floor, enlarge lower front entry doorway, add sliding glass door at rear, upgrade hvac, water heater, electrical and lighting throughout.Details
interior remodel and rear deck addition, replace all windows (facing front) add bathroom at 2nd floor, enlarge lower front entry doorway, add sliding glass door at rear, upgrade hvac, water heater, electrical and lighting throughout. | $100,000 |
| Jul 3, 2024 | Completed final sign-off Feb 2025 | 2527 41st Av | construct 2 bedroom, 2 bathroom, media room, wet bar & laundry room at g/f. remodel (e) kitchen, 2 bathroom, & create new hallway for bedroom at 2/f.Details
construct 2 bedroom, 2 bathroom, media room, wet bar & laundry room at g/f. remodel (e) kitchen, 2 bathroom, & create new hallway for bedroom at 2/f. | $328,000 |
| Mar 12, 2024 | Completed final sign-off Nov 2025 | 1907 12th Av | 1st fl add 1 bedroom, family rm, 1 full bath, powder room, wet bar and relocate laundry. 2nd fl remodel kitchen and dining rm. new electrical fireplaceDetails
1st fl add 1 bedroom, family rm, 1 full bath, powder room, wet bar and relocate laundry. 2nd fl remodel kitchen and dining rm. new electrical fireplace | $120,000 |
| Jun 12, 2023 | Completed final sign-off Sep 2023 | 370 Monterey Bl | apt 105: in kind bathroom remodel. replace all and shower tiles. replace shower faucet. install shower door. replace toilet. relocate subpanel to hallway.Details
apt 105: in kind bathroom remodel. replace all and shower tiles. replace shower faucet. install shower door. replace toilet. relocate subpanel to hallway. | $10,000 |
| Apr 14, 2023 | Completed final sign-off Jul 2023 | 1666 48th Av | remodel 2 existing bathroom and 1 kitchen in kind. no changes to layout. (2nd fl/#a)Details
remodel 2 existing bathroom and 1 kitchen in kind. no changes to layout. (2nd fl/#a) | $40,000 |
| Oct 3, 2022 | Completed final sign-off Mar 2023 | 1765 Mcallister St | unit #a: remodel kitchen and bathroom.Details
unit #a: remodel kitchen and bathroom. | $25,000 |
| Apr 19, 2022 | Completed final sign-off Jul 2022 | 4345 Clement St | unit # 3: remodel 2 (e) bathrooms and (e) kitchen. replace cabiinets and shower pan/tub. no change in floor plan. no change in wall layout.Details
unit # 3: remodel 2 (e) bathrooms and (e) kitchen. replace cabiinets and shower pan/tub. no change in floor plan. no change in wall layout. | $35,000 |
| Jan 8, 2020 | Completed final sign-off Aug 2021 | 2327 Kirkham St | construct one bedroom, one full bathroom, and family room at ground fl. remodel (e) kitchen, bathroom & add one new bathroom at 2nd fl.Details
construct one bedroom, one full bathroom, and family room at ground fl. remodel (e) kitchen, bathroom & add one new bathroom at 2nd fl. | $65,000 |
| Mar 18, 2019 | Completed final sign-off Mar 2020 | 944 Pacific Av | unit 944: remodel (e) kitchen, bathroom. (replace counter, cabinets, sink & flooring), rewire electrical. all work at 2nd fl.Details
unit 944: remodel (e) kitchen, bathroom. (replace counter, cabinets, sink & flooring), rewire electrical. all work at 2nd fl. | $20,000 |
| Nov 28, 2018 | Completed final sign-off Apr 2020 | 1155 Powell St | interior remodel including moving bedrooms to street side of building, kitchen & bath remodel, associaed elec & plumbing, wood interior/aluminum exterior windows to be fully simulated(sp?)Details
interior remodel including moving bedrooms to street side of building, kitchen & bath remodel, associaed elec & plumbing, wood interior/aluminum exterior windows to be fully simulated(sp?) | $225,000 |
| Aug 15, 2018 | Never finaled issued Aug 2018, no final | 562 Head St | remodel (e) house inside main floor: add powder room, add new deck, replace windows with alum clad wood at front. gr fl space converted into 2 bedrooms and 1 full bath. replace front doorDetails
remodel (e) house inside main floor: add powder room, add new deck, replace windows with alum clad wood at front. gr fl space converted into 2 bedrooms and 1 full bath. replace front door | $50,000 |
| Apr 3, 2018 | Completed final sign-off Mar 2019 | 1656 Palou Av | relocate (e) kitchen, bathroom & construct 1 full bathroom. replace (e) sheetroc at 2nd floor; upgrade (e) bathroom, family room & bedrooms @ ground floorDetails
relocate (e) kitchen, bathroom & construct 1 full bathroom. replace (e) sheetroc at 2nd floor; upgrade (e) bathroom, family room & bedrooms @ ground floor | $56,000 |
| Oct 6, 2017 | Completed final sign-off Jan 2019 | 123 Galewood Cr | at 2nd fl: remodel (e) kitchen & fmaily & living. at 3rd fl: remodel (e) master bathroom and common bath. replace al lfront and rear windows.Details
at 2nd fl: remodel (e) kitchen & fmaily & living. at 3rd fl: remodel (e) master bathroom and common bath. replace al lfront and rear windows. | $30,000 |