Back to kitchen remodel contractors
Blucal
- Based in
- San Francisco
- On San Francisco permits
- Jan 2018 to Jul 2026
- Last 24 months
- 11 permits filed
32 permits since 2000: 25 completed, 6 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 12 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2026 | In progress issued Jul 2026 | 1450 Golden Gate Av | unit 303: bathroom remodel, remove tub surround, install new vanity, new faucet, tiles. kitchen remodel, new base sink, cabinets, counter tops, new faucet, and new linoleum in kind.Details
unit 303: bathroom remodel, remove tub surround, install new vanity, new faucet, tiles. kitchen remodel, new base sink, cabinets, counter tops, new faucet, and new linoleum in kind. | $7,000 |
| May 6, 2026 | Completed final sign-off Aug 2026 | 1405 Franklin St | unit 402: replace damaged wiring and install new outlets lights, switches, new light fixtures throughout home. new isullation in ceiling and walls. new cabinets in kitchen, new flooring, new baseboard trim. new drywall and paint inpartial bathroom remodel. provide fire rating around new lighting.Details
unit 402: replace damaged wiring and install new outlets lights, switches, new light fixtures throughout home. new isullation in ceiling and walls. new cabinets in kitchen, new flooring, new baseboard trim. new drywall and paint inpartial bathroom remodel. provide fire rating around new lighting. | $110,000 |
| Feb 26, 2026 | Completed final sign-off Mar 2026 | 1405 Franklin St | #202: in kitchen install 12-19 insolation install 21 sq ft of drywall in hallway, patch the wall around the sub electrical panel from water damaged, interior work onlyDetails
#202: in kitchen install 12-19 insolation install 21 sq ft of drywall in hallway, patch the wall around the sub electrical panel from water damaged, interior work only | $6,500 |
| Aug 14, 2024 | Completed final sign-off Sep 2025 | 563 Webster St | units b,c,d,e,f- units b,d,f to include kitchen and bath remodel to include remove partition wall at living room and kitchen and add pony wall with mep trade work. repair roof and ceiling for units e and f. all work is due to fire damage. no exterior work.Details
units b,c,d,e,f- units b,d,f to include kitchen and bath remodel to include remove partition wall at living room and kitchen and add pony wall with mep trade work. repair roof and ceiling for units e and f. all work is due to fire damage. no exterior work. | $110,000 |
| Oct 30, 2023 | Completed final sign-off Dec 2023 | 833 Ashbury St | remove (e) sheet rock in unit 8 bedroom wall & ceiling, total 32 sqft. install new sheetrock, patch and paint, remove 1 kitchen wall cabinet and sink cabinet in unit #10. remove kitchen wall shet rock total 32 sqft. install new sheet rock in kind in kitchen reinstall cabinetsDetails
remove (e) sheet rock in unit 8 bedroom wall & ceiling, total 32 sqft. install new sheetrock, patch and paint, remove 1 kitchen wall cabinet and sink cabinet in unit #10. remove kitchen wall shet rock total 32 sqft. install new sheet rock in kind in kitchen reinstall cabinets | $5,000 |
| Sep 6, 2023 | Completed final sign-off Nov 2023 | 685 Mcallister St | unit 106 renovation- required kitchen and bath to sf code. new cabinets, new appliances in kitchen, full bathroom renovation. new bathtub new sink. kitchen and bathroom in kind. approx. 65 sq ft. for kitchen and bath.Details
unit 106 renovation- required kitchen and bath to sf code. new cabinets, new appliances in kitchen, full bathroom renovation. new bathtub new sink. kitchen and bathroom in kind. approx. 65 sq ft. for kitchen and bath. | $49,000 |
| Jun 30, 2023 | Completed final sign-off Feb 2024 | 990 Geary St | (unit# 408) removal of kitchen cabinets, bathroom sink, bathroom cabinet, bathroom wainscot tile 100 sq ft, sheetrock 400 sq ft in bathroom, kitchen, and entry hall. install new material in kind.Details
(unit# 408) removal of kitchen cabinets, bathroom sink, bathroom cabinet, bathroom wainscot tile 100 sq ft, sheetrock 400 sq ft in bathroom, kitchen, and entry hall. install new material in kind. | $14,000 |
| Jun 27, 2023 | Never finaled issued Jun 2023, no final | 990 Geary St | unit 408: removal of 180 sq ft of sheet rock repair wall and ceiling bathroom/kitchen. total 180 sq. ft. of sheet rock and paint. patch back in kind.Details
unit 408: removal of 180 sq ft of sheet rock repair wall and ceiling bathroom/kitchen. total 180 sq. ft. of sheet rock and paint. patch back in kind. | $10,000 |
| Apr 7, 2022 | Completed final sign-off Oct 2022 | 78 Buchanan St | #504 6th flr: 1) convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom 4)install washer and elec dryer.Details
#504 6th flr: 1) convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom 4)install washer and elec dryer. | $42,000 |
| Apr 24, 2018 | Completed final sign-off Jul 2018 | 3862 California St | unit#4 kitchen & bath remodel. no structural work. no walls to be removed.Details
unit#4 kitchen & bath remodel. no structural work. no walls to be removed. | $46,000 |
| Feb 14, 2018 | Completed final sign-off Jul 2018 | 1405 Franklin St | unit #601: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer.Details
unit #601: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. | $28,000 |
| Feb 14, 2018 | Completed final sign-off Jul 2018 | 1405 Franklin St | unit #301: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer.Details
unit #301: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. | $28,000 |
| Jan 18, 2018 | Completed final sign-off Jul 2018 | 1405 Franklin St | unit 202 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer & dryerDetails
unit 202 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer & dryer | $34,000 |
| Jan 3, 2018 | Completed final sign-off Feb 2018 | 200 Arguello Bl | kitchen/bath remodel. new cabinet/countertops, add dw, replace oven vent hood with mw vent combo. replace range with gas, tile surround in shower, flooring, relocate elec subpanel, led surf mount light to lv rm,bathDetails
kitchen/bath remodel. new cabinet/countertops, add dw, replace oven vent hood with mw vent combo. replace range with gas, tile surround in shower, flooring, relocate elec subpanel, led surf mount light to lv rm,bath | $40,000 |