Back to kitchen remodel contractors
Blair Burke General Contractors Inc
- Based in
- Fairfax
- On San Francisco permits
- May 2000 to Oct 2026
- Last 24 months
- 16 permits filed
195 permits since 2000: 131 completed, 9 in progress, 17 never finaled, 38 expired or cancelled.
Of the 17 never-finaled permits, 4 are 3 to 5 years old, 5 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
30 kitchen remodel permits: 21 completed, 1 in progress, 1 never finaled, 7 expired or cancelled. Typically 12 days from filing to permit and 318 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2026 | In progress issued Jul 2026 | 1573 34th Av | new 3rd story vertical addition to (e) sfd and interior remodel @ 1st & 2md story to include: remodel & expand (e) kitchen, and 2 (e) bathjs, new primary bedroom and abath, new windows @ addition, (e)courtyard and rear elevation, replace (e) foundation for new clg hgt @ 1st story, new structuralDetails
new 3rd story vertical addition to (e) sfd and interior remodel @ 1st & 2md story to include: remodel & expand (e) kitchen, and 2 (e) bathjs, new primary bedroom and abath, new windows @ addition, (e)courtyard and rear elevation, replace (e) foundation for new clg hgt @ 1st story, new structural | $850,000 |
| Sep 10, 2025 | Completed final sign-off Jul 2026 | 285 Cumberland St | interior kitchen and bath remodel. expanding opening between kitchen and dining.Details
interior kitchen and bath remodel. expanding opening between kitchen and dining. | $125,000 |
| Feb 27, 2025 | Completed final sign-off Feb 2026 | 441 Linden St | 1st floor laundry remodel- replace in kind. 1st floor bathroom remodel- replace inkind. 2nd floor bathroom remodel-replace inkind. 2nd floor kitchen remodel-replace in kind.Details
1st floor laundry remodel- replace in kind. 1st floor bathroom remodel- replace inkind. 2nd floor bathroom remodel-replace inkind. 2nd floor kitchen remodel-replace in kind. | $180,000 |
| Feb 1, 2022 | Never finaled issued Feb 2022, no final | 280 Spear St | unit #33e: master bath & kitchen remodel in kind. replace toilet, bath, shower, sinks, cabinetry in master bath & kitchen in kind. all plumbing fixtures to remain in same location. all appliances to remain.Details
unit #33e: master bath & kitchen remodel in kind. replace toilet, bath, shower, sinks, cabinetry in master bath & kitchen in kind. all plumbing fixtures to remain in same location. all appliances to remain. | $145,000 |
| Aug 2, 2021 | Expired or cancelled withdrawn Sep 2021 | 36 Parnassus Av | 2/f: kitchen & 2 bathrooms renovation. replace of plumbing & electrical fixtures, in-kind.Details
2/f: kitchen & 2 bathrooms renovation. replace of plumbing & electrical fixtures, in-kind. | $45,000 |
| Jul 15, 2021 | Expired or cancelled expired May 2026 | 475 28th St | basement addition, addition at kitchen/deck, add bay at rear facade at 2nd level, add 2 powder rooms, remodel 2 bathrooms and kitchen. new ground floor area is 1,198 sq. ft.Details
basement addition, addition at kitchen/deck, add bay at rear facade at 2nd level, add 2 powder rooms, remodel 2 bathrooms and kitchen. new ground floor area is 1,198 sq. ft. | $420,000 |
| Feb 8, 2021 | Completed final sign-off Aug 2022 | 1907 Diamond St | minor window & door altesations. not at the front facade including structural. remodel (e) kitchen and 3 baths, new interior finishes. new windows and doors with insulated glazzing, new bldg insul, new hvac, wh, and skylithg. mep via separate permits.Details
minor window & door altesations. not at the front facade including structural. remodel (e) kitchen and 3 baths, new interior finishes. new windows and doors with insulated glazzing, new bldg insul, new hvac, wh, and skylithg. mep via separate permits. | $150,000 |
| Dec 21, 2020 | Completed final sign-off Aug 2022 | 1907 Diamond St | replace kitchen and master bath in-kind (all plumbing and wall locations to remain). replace plumbing fixtures in the powder room. refinish existing floors & painting as needed.Details
replace kitchen and master bath in-kind (all plumbing and wall locations to remain). replace plumbing fixtures in the powder room. refinish existing floors & painting as needed. | $138,500 |
| Aug 13, 2020 | Completed final sign-off Dec 2021 | 2383 Bush St | re-face kitchen cabinets, remodel existing master bathroom, powder room and guest bathroom in kind. repair broken window sash(@ the rear) as needed. replace existing fau with new high efficiency unit. repair existing deck (less than 50%)as needed. repair apaint siding as needed.Details
re-face kitchen cabinets, remodel existing master bathroom, powder room and guest bathroom in kind. repair broken window sash(@ the rear) as needed. replace existing fau with new high efficiency unit. repair existing deck (less than 50%)as needed. repair apaint siding as needed. | $75,000 |
| Aug 13, 2020 | Expired or cancelled expired Oct 2021 | 1360 Dolores St | remodel kitchen and master bathroom in kind.Details
remodel kitchen and master bathroom in kind. | $45,000 |
| Oct 25, 2019 | Completed final sign-off Jul 2022 | 3524 Fulton St | seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint.Details
seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint. | $340,000 |
| May 18, 2018 | Completed final sign-off Jun 2021 | 2586 Great Hy | interior alterations: demo partitions on ground floor & install new bathroom & laundry; new stair; new rear windows; relocate kitchen to 3rd floor; new finishes & fixtures throughout. no work visible from streetDetails
interior alterations: demo partitions on ground floor & install new bathroom & laundry; new stair; new rear windows; relocate kitchen to 3rd floor; new finishes & fixtures throughout. no work visible from street | $419,000 |
| May 18, 2018 | Expired or cancelled expired Nov 2021 | 270 Castro St | interior reno of lower unit, including remodeling kitchen (1) and bath (1) and adding (n) half bath. replace window at rear south elevation with (n) sliding glass pocket door.Details
interior reno of lower unit, including remodeling kitchen (1) and bath (1) and adding (n) half bath. replace window at rear south elevation with (n) sliding glass pocket door. | $50,000 |
| Jun 9, 2017 | Completed final sign-off Aug 2018 | 487 29th St | excavate and replace basement & foundation to add recreation, storage space, kitchenette and internal stair; renovate kitchen, add 2 bathrooms, 1 powder room, and 2 skylights. enlarge/replace windows at rear facade. replace built up roofing, sprinkler basement and 1st floors per pre app meeting noteDetails
excavate and replace basement & foundation to add recreation, storage space, kitchenette and internal stair; renovate kitchen, add 2 bathrooms, 1 powder room, and 2 skylights. enlarge/replace windows at rear facade. replace built up roofing, sprinkler basement and 1st floors per pre app meeting note | $478,000 |
| Jan 6, 2017 | Completed final sign-off Feb 2018 | 76 Oakwood St | add 1 new living unit to (e) ground floor space w/(e) bldg envelope. 1 new kitchen, 1 living/dining rm, 3(n) bedrooms, 2 (n) bathrms & 1(n) laundry. 2 (n) windows & 1 (n) door added to upper unit. (n) hvac, lighting/elec. & plbg in (n) unit. (n) hvac in upper unit.Details
add 1 new living unit to (e) ground floor space w/(e) bldg envelope. 1 new kitchen, 1 living/dining rm, 3(n) bedrooms, 2 (n) bathrms & 1(n) laundry. 2 (n) windows & 1 (n) door added to upper unit. (n) hvac, lighting/elec. & plbg in (n) unit. (n) hvac in upper unit. | $275,000 |
| Feb 8, 2016 | Completed final sign-off Sep 2016 | 1 Bernice St | interior remodel of (e) live work space, including 1)reconfigure/relocate of existing kitchen, 2) new stair to mezzanine, 3)new mezzanine configuration(reduces sq ft). 4) new bathroom on mezzanine one. 5) plmg & electrical work on seperate permit.Details
interior remodel of (e) live work space, including 1)reconfigure/relocate of existing kitchen, 2) new stair to mezzanine, 3)new mezzanine configuration(reduces sq ft). 4) new bathroom on mezzanine one. 5) plmg & electrical work on seperate permit. | $220,000 |
| Nov 24, 2015 | Completed final sign-off Aug 2018 | 109 Wool St | the work includes renovating the (e) 2/f & adding a legally accessilde 3/f w/two bedrms & two bathrms. the kitchen and one powder rm is renovated on the 2/f. front and rear facades are modified.Details
the work includes renovating the (e) 2/f & adding a legally accessilde 3/f w/two bedrms & two bathrms. the kitchen and one powder rm is renovated on the 2/f. front and rear facades are modified. | $350,000 |
| Feb 25, 2015 | Expired or cancelled withdrawn Aug 2015 | 922 Treat Av | conversion of 2-dwelling unit into a 1-dwelling (unit merger). interior renovation/reconfigure, including kitchen, living area, bedrms & bathrms. remove 2 skylights & add 4 skylights. replace/reconifgure all windows/doors.Details
conversion of 2-dwelling unit into a 1-dwelling (unit merger). interior renovation/reconfigure, including kitchen, living area, bedrms & bathrms. remove 2 skylights & add 4 skylights. replace/reconifgure all windows/doors. | $375,000 |
| Feb 17, 2015 | Expired or cancelled expired Dec 2017 | 444 30th St | revision to app#201403261745. remodel kitchen and new bathroom on 2nd floor with structural revision.Details
revision to app#201403261745. remodel kitchen and new bathroom on 2nd floor with structural revision. | $18,000 |
| Jun 27, 2014 | Completed final sign-off Aug 2017 | 21 Laidley St | horizontal addition @ basement and ground floor, remodel of (e) kitchen and all (e) bathrooms to a single family residence including remodel of (e) residence and conversion of interior space for a new single car garageDetails
horizontal addition @ basement and ground floor, remodel of (e) kitchen and all (e) bathrooms to a single family residence including remodel of (e) residence and conversion of interior space for a new single car garage | $575,000 |
| Mar 12, 2014 | Completed final sign-off Feb 2015 | 69 Uranus Tr | remodel kitchen & existing bathrooms, expansion of existing basement level room to create new bedroom & bth. no changes to exterior.Details
remodel kitchen & existing bathrooms, expansion of existing basement level room to create new bedroom & bth. no changes to exterior. | $95,000 |
| Oct 2, 2013 | Completed final sign-off May 2015 | 3028 Laguna St | interior remodel of dwelling, including siesmic upgrade, new interior stair, new 1/2 bath and full bath, kitchen remodel, and new bedroom. plumbing & electrical on seperate permit. no exterior work.Details
interior remodel of dwelling, including siesmic upgrade, new interior stair, new 1/2 bath and full bath, kitchen remodel, and new bedroom. plumbing & electrical on seperate permit. no exterior work. | $206,126 |
| Oct 1, 2013 | Completed final sign-off Jan 2014 | 730 Polk St | subdivide existing breakroom into office and kitchenetteDetails
subdivide existing breakroom into office and kitchenette | $5,000 |
| May 28, 2013 | Completed final sign-off Jul 2013 | 283 Randall St | light kitchen/dining room remodel. remove one 5 foot length of non-bearing partition between the kitchen an dining room. patch wood floor. replace 2 surface mounted incandescent lights to be replace with high efficacy led light fixtures. all work will be code compliant with the currentDetails
light kitchen/dining room remodel. remove one 5 foot length of non-bearing partition between the kitchen an dining room. patch wood floor. replace 2 surface mounted incandescent lights to be replace with high efficacy led light fixtures. all work will be code compliant with the current | $2,500 |
| May 10, 2013 | Completed final sign-off Sep 2013 | 200 Beacon St | bathroom & kitchen remodel- replace cabinets and plumbing fixtures. new locations of plumbing shall remain the same. work will comply with current title 24 as required & all current building, plumbing & electrical codes as adopted. bathroom & kitchen remodel only.Details
bathroom & kitchen remodel- replace cabinets and plumbing fixtures. new locations of plumbing shall remain the same. work will comply with current title 24 as required & all current building, plumbing & electrical codes as adopted. bathroom & kitchen remodel only. | $45,000 |
| Oct 24, 2011 | Completed final sign-off Feb 2012 | 3792 16th St | interior remodel of upper unit (#3972) of 2 unit residential bldg. including demo of non-structural walls, kitchen & bath. remodel & replacement of windows in kind.Details
interior remodel of upper unit (#3972) of 2 unit residential bldg. including demo of non-structural walls, kitchen & bath. remodel & replacement of windows in kind. | $65,000 |
| Jul 15, 2010 | Completed final sign-off Jan 2011 | 350 Valdez Av | remodel (e) kitchen and bathroom. replace cabinets, plbg and elec. fixtures. new tiled surfaces and slab counters. no structural work will be done. all electrical will be title 24 compliant. work on first floor above garageDetails
remodel (e) kitchen and bathroom. replace cabinets, plbg and elec. fixtures. new tiled surfaces and slab counters. no structural work will be done. all electrical will be title 24 compliant. work on first floor above garage | $38,000 |
| Mar 9, 2009 | Completed final sign-off Nov 2009 | 840 Powell St | 1 kitchen remodel and 1 bath remodel. we will meet title 24 compliance for all new work. kitchen:15'x 20' appliance, cabinet, lighting, plumbing fixture, countertop. area= 6' x 8' replace vanity, light fixture, toilet. no relocation of (e) walls. 0 egress door work &no window work on this permitDetails
1 kitchen remodel and 1 bath remodel. we will meet title 24 compliance for all new work. kitchen:15'x 20' appliance, cabinet, lighting, plumbing fixture, countertop. area= 6' x 8' replace vanity, light fixture, toilet. no relocation of (e) walls. 0 egress door work &no window work on this permit | $75,000 |
| Nov 12, 2008 | Expired or cancelled cancelled Aug 2012 | 444 Collingwood St | remodel 2 unit 3-story residential bldg w/ interior remodel of lower unit w/new master bath, kitchen, 1/2 bath, new interior stair, replace existing front decks, new windows & doors & exterior finishes - voluntary seismic upgrade as shown on plans.Details
remodel 2 unit 3-story residential bldg w/ interior remodel of lower unit w/new master bath, kitchen, 1/2 bath, new interior stair, replace existing front decks, new windows & doors & exterior finishes - voluntary seismic upgrade as shown on plans. | $150,000 |
| Sep 30, 2008 | Completed final sign-off Oct 2008 | 446 Collingwood St | to comply w/physical inspection report 3r-4950. kitchen remodel of upper unit (446 collingwood st) 12x12 kitchen floor area.Details
to comply w/physical inspection report 3r-4950. kitchen remodel of upper unit (446 collingwood st) 12x12 kitchen floor area. | $20,549 |