Back to bathroom remodel contractors
Blair Burke General Contractors Inc
- Based in
- Fairfax
- On San Francisco permits
- May 2000 to Oct 2026
- Last 24 months
- 16 permits filed
195 permits since 2000: 131 completed, 9 in progress, 17 never finaled, 38 expired or cancelled.
Of the 17 never-finaled permits, 4 are 3 to 5 years old, 5 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
52 bathroom remodel permits: 39 completed, 1 in progress, 3 never finaled, 9 expired or cancelled. Typically 20 days from filing to permit and 307 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2026 | In progress issued Jun 2026 | 1100 Sacramento St | apt#208: interior remodel: 1) primary bath relocated fixtures & new finishes.2) relocate walk-in closet. 3)(n) interior doors in select locations 4) electrical & plumbing via separate permit, no structural work, no change to building envelopeDetails
apt#208: interior remodel: 1) primary bath relocated fixtures & new finishes.2) relocate walk-in closet. 3)(n) interior doors in select locations 4) electrical & plumbing via separate permit, no structural work, no change to building envelope | $65,000 |
| Sep 10, 2025 | Completed final sign-off Jul 2026 | 285 Cumberland St | interior kitchen and bath remodel. expanding opening between kitchen and dining.Details
interior kitchen and bath remodel. expanding opening between kitchen and dining. | $125,000 |
| Feb 27, 2025 | Completed final sign-off Feb 2026 | 441 Linden St | 1st floor laundry remodel- replace in kind. 1st floor bathroom remodel- replace inkind. 2nd floor bathroom remodel-replace inkind. 2nd floor kitchen remodel-replace in kind.Details
1st floor laundry remodel- replace in kind. 1st floor bathroom remodel- replace inkind. 2nd floor bathroom remodel-replace inkind. 2nd floor kitchen remodel-replace in kind. | $180,000 |
| Feb 1, 2022 | Never finaled issued Feb 2022, no final | 280 Spear St | unit #33e: master bath & kitchen remodel in kind. replace toilet, bath, shower, sinks, cabinetry in master bath & kitchen in kind. all plumbing fixtures to remain in same location. all appliances to remain.Details
unit #33e: master bath & kitchen remodel in kind. replace toilet, bath, shower, sinks, cabinetry in master bath & kitchen in kind. all plumbing fixtures to remain in same location. all appliances to remain. | $145,000 |
| Oct 8, 2021 | Completed final sign-off Mar 2022 | 70 Linda St | remodel (e) bathroom. infill 1 lightwell. revision to 2021 0601 1333 (no plans)Details
remodel (e) bathroom. infill 1 lightwell. revision to 2021 0601 1333 (no plans) | $30,000 |
| Aug 2, 2021 | Expired or cancelled withdrawn Sep 2021 | 36 Parnassus Av | 2/f: kitchen & 2 bathrooms renovation. replace of plumbing & electrical fixtures, in-kind.Details
2/f: kitchen & 2 bathrooms renovation. replace of plumbing & electrical fixtures, in-kind. | $45,000 |
| Jul 15, 2021 | Expired or cancelled expired May 2026 | 475 28th St | basement addition, addition at kitchen/deck, add bay at rear facade at 2nd level, add 2 powder rooms, remodel 2 bathrooms and kitchen. new ground floor area is 1,198 sq. ft.Details
basement addition, addition at kitchen/deck, add bay at rear facade at 2nd level, add 2 powder rooms, remodel 2 bathrooms and kitchen. new ground floor area is 1,198 sq. ft. | $420,000 |
| Jun 1, 2021 | Completed final sign-off Nov 2021 | 5 Winfield St | revision to pa 201412173930. swap shower and toilet locations in master bath. add a glass door to adjacent deck. change wood siding to stucco siding on south and east walls.Details
revision to pa 201412173930. swap shower and toilet locations in master bath. add a glass door to adjacent deck. change wood siding to stucco siding on south and east walls. | $5,000 |
| Jun 1, 2021 | Completed final sign-off Mar 2022 | 70 Linda St | 2nf fl bathroom renovation. replacement of plumbing and electrical fixtures, in kind. 5 x 8Details
2nf fl bathroom renovation. replacement of plumbing and electrical fixtures, in kind. 5 x 8 | $30,000 |
| Feb 8, 2021 | Completed final sign-off Aug 2022 | 1907 Diamond St | minor window & door altesations. not at the front facade including structural. remodel (e) kitchen and 3 baths, new interior finishes. new windows and doors with insulated glazzing, new bldg insul, new hvac, wh, and skylithg. mep via separate permits.Details
minor window & door altesations. not at the front facade including structural. remodel (e) kitchen and 3 baths, new interior finishes. new windows and doors with insulated glazzing, new bldg insul, new hvac, wh, and skylithg. mep via separate permits. | $150,000 |
| Dec 21, 2020 | Completed final sign-off Aug 2022 | 1907 Diamond St | replace kitchen and master bath in-kind (all plumbing and wall locations to remain). replace plumbing fixtures in the powder room. refinish existing floors & painting as needed.Details
replace kitchen and master bath in-kind (all plumbing and wall locations to remain). replace plumbing fixtures in the powder room. refinish existing floors & painting as needed. | $138,500 |
| Nov 20, 2020 | Never finaled issued Nov 2020, no final | 3544 Baker St | replace (e) master bathroom and kids bathroom in-kind, painting and refinishing (e) floors.Details
replace (e) master bathroom and kids bathroom in-kind, painting and refinishing (e) floors. | $130,000 |
| Aug 13, 2020 | Completed final sign-off Dec 2021 | 2383 Bush St | re-face kitchen cabinets, remodel existing master bathroom, powder room and guest bathroom in kind. repair broken window sash(@ the rear) as needed. replace existing fau with new high efficiency unit. repair existing deck (less than 50%)as needed. repair apaint siding as needed.Details
re-face kitchen cabinets, remodel existing master bathroom, powder room and guest bathroom in kind. repair broken window sash(@ the rear) as needed. replace existing fau with new high efficiency unit. repair existing deck (less than 50%)as needed. repair apaint siding as needed. | $75,000 |
| Aug 13, 2020 | Expired or cancelled expired Oct 2021 | 1360 Dolores St | remodel kitchen and master bathroom in kind.Details
remodel kitchen and master bathroom in kind. | $45,000 |
| Nov 1, 2019 | Completed final sign-off Sep 2020 | 147 04th Av | foyer, bedroom , and living area at 1st fl. add windows to 1st fl. add full bathroom to 1st fl. add 1 hr rating at garage, new deck to replace existingDetails
foyer, bedroom , and living area at 1st fl. add windows to 1st fl. add full bathroom to 1st fl. add 1 hr rating at garage, new deck to replace existing | $122,000 |
| Oct 25, 2019 | Completed final sign-off Jul 2022 | 3524 Fulton St | seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint.Details
seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint. | $340,000 |
| Mar 25, 2019 | Completed final sign-off Nov 2020 | 1560 Sanchez St | revision to pa 201312204718. add 2 (n) skylights over bathroom 2 & bathroom 3. revise hvac & title 24 reportDetails
revision to pa 201312204718. add 2 (n) skylights over bathroom 2 & bathroom 3. revise hvac & title 24 report | $1,000 |
| Dec 21, 2018 | Expired or cancelled expired Nov 2021 | 270 Castro St | revision to pa #201805189556. revision to interior structural as needed. reconfigure bath 1, change n. sliding door type in bedroom, enclose e. lightwell to capture space in closet, add window on west wall of study, revise e. structural.Details
revision to pa #201805189556. revision to interior structural as needed. reconfigure bath 1, change n. sliding door type in bedroom, enclose e. lightwell to capture space in closet, add window on west wall of study, revise e. structural. | $32,000 |
| Jun 27, 2018 | Completed final sign-off Sep 2018 | 444 30th St | revision to #201403261745. reduction in scope no remodel work at 3rd fl bath or bedroom closet. existing to remain.Details
revision to #201403261745. reduction in scope no remodel work at 3rd fl bath or bedroom closet. existing to remain. | |
| May 18, 2018 | Completed final sign-off Jun 2021 | 2586 Great Hy | interior alterations: demo partitions on ground floor & install new bathroom & laundry; new stair; new rear windows; relocate kitchen to 3rd floor; new finishes & fixtures throughout. no work visible from streetDetails
interior alterations: demo partitions on ground floor & install new bathroom & laundry; new stair; new rear windows; relocate kitchen to 3rd floor; new finishes & fixtures throughout. no work visible from street | $419,000 |
| May 18, 2018 | Expired or cancelled expired Nov 2021 | 270 Castro St | interior reno of lower unit, including remodeling kitchen (1) and bath (1) and adding (n) half bath. replace window at rear south elevation with (n) sliding glass pocket door.Details
interior reno of lower unit, including remodeling kitchen (1) and bath (1) and adding (n) half bath. replace window at rear south elevation with (n) sliding glass pocket door. | $50,000 |
| Apr 24, 2018 | Completed final sign-off Apr 2021 | 111 Holly Park Cr | legalize unpermitted extg 1st floor addition w/ rec room @ rear of building, and add (n) bathroom. rebuild unpermitted exit stair, deck and landing to code. dry rot repair.Details
legalize unpermitted extg 1st floor addition w/ rec room @ rear of building, and add (n) bathroom. rebuild unpermitted exit stair, deck and landing to code. dry rot repair. | $138,000 |
| Feb 26, 2018 | Completed final sign-off May 2019 | 25 Burnett Av | revision to 201709279689 add minor remodel to (e) 2nd flr bathroom. new reduction of 1 plm fixtureDetails
revision to 201709279689 add minor remodel to (e) 2nd flr bathroom. new reduction of 1 plm fixture | $5,000 |
| Jul 31, 2017 | Completed final sign-off Mar 2024 | 358 Lombard St | interior renovation with horizontal and vertical addition. 2 new additional bedrooms & 3.5 new additional bathrooms.Details
interior renovation with horizontal and vertical addition. 2 new additional bedrooms & 3.5 new additional bathrooms. | $550,000 |
| Jun 9, 2017 | Completed final sign-off Aug 2018 | 487 29th St | excavate and replace basement & foundation to add recreation, storage space, kitchenette and internal stair; renovate kitchen, add 2 bathrooms, 1 powder room, and 2 skylights. enlarge/replace windows at rear facade. replace built up roofing, sprinkler basement and 1st floors per pre app meeting noteDetails
excavate and replace basement & foundation to add recreation, storage space, kitchenette and internal stair; renovate kitchen, add 2 bathrooms, 1 powder room, and 2 skylights. enlarge/replace windows at rear facade. replace built up roofing, sprinkler basement and 1st floors per pre app meeting note | $478,000 |
| Feb 8, 2016 | Completed final sign-off Sep 2016 | 1 Bernice St | interior remodel of (e) live work space, including 1)reconfigure/relocate of existing kitchen, 2) new stair to mezzanine, 3)new mezzanine configuration(reduces sq ft). 4) new bathroom on mezzanine one. 5) plmg & electrical work on seperate permit.Details
interior remodel of (e) live work space, including 1)reconfigure/relocate of existing kitchen, 2) new stair to mezzanine, 3)new mezzanine configuration(reduces sq ft). 4) new bathroom on mezzanine one. 5) plmg & electrical work on seperate permit. | $220,000 |
| Jun 11, 2015 | Completed final sign-off Feb 2016 | 285 Cumberland St | 1) 3rd floor remodel: add one new bathroom. 2)add two new skylights. 3)replace extg comp. shingle roof.Details
1) 3rd floor remodel: add one new bathroom. 2)add two new skylights. 3)replace extg comp. shingle roof. | $125,000 |
| Apr 2, 2015 | Completed final sign-off Jan 2016 | 11 Roscoe St | interior remodel at ground level to convert portion of garage into family/media room. modification to extg bathroom. change out extg sliding glass door with new french door and new window in extg opening. misc. plmg and elect. modificationsDetails
interior remodel at ground level to convert portion of garage into family/media room. modification to extg bathroom. change out extg sliding glass door with new french door and new window in extg opening. misc. plmg and elect. modifications | $27,000 |
| Mar 5, 2015 | Completed final sign-off Mar 2017 | 36 Winfield St | horizontal addition at rear of house. partial interior remodel (add 1 bedroom & 1 bathroom) & window replacement at front of house.Details
horizontal addition at rear of house. partial interior remodel (add 1 bedroom & 1 bathroom) & window replacement at front of house. | $120,000 |
| Feb 17, 2015 | Expired or cancelled expired Dec 2017 | 444 30th St | revision to app#201403261745. remodel kitchen and new bathroom on 2nd floor with structural revision.Details
revision to app#201403261745. remodel kitchen and new bathroom on 2nd floor with structural revision. | $18,000 |
| Dec 22, 2014 | Completed final sign-off Nov 2015 | 361 28th St | infill existing closet window in property line wall at 3rd floor. infill existing lightwell at 3rd floor bathroom on neighboring wall. remove existing skylight and add new skylight in 3rd floor bathroom at new location. add attic access to roof. revision to 201402219069Details
infill existing closet window in property line wall at 3rd floor. infill existing lightwell at 3rd floor bathroom on neighboring wall. remove existing skylight and add new skylight in 3rd floor bathroom at new location. add attic access to roof. revision to 201402219069 | $5,000 |
| Dec 17, 2014 | Completed final sign-off Nov 2021 | 5 Winfield St | horizontal addition. expand living to front setback, (n) master suite with bath, (n) roof ~kf21&Details
horizontal addition. expand living to front setback, (n) master suite with bath, (n) roof ~kf21& | $125,000 |
| Jun 27, 2014 | Completed final sign-off Aug 2017 | 21 Laidley St | horizontal addition @ basement and ground floor, remodel of (e) kitchen and all (e) bathrooms to a single family residence including remodel of (e) residence and conversion of interior space for a new single car garageDetails
horizontal addition @ basement and ground floor, remodel of (e) kitchen and all (e) bathrooms to a single family residence including remodel of (e) residence and conversion of interior space for a new single car garage | $575,000 |
| Mar 26, 2014 | Expired or cancelled expired Dec 2017 | 444 30th St | expand (e) basement level room into bedroom w/(n) bath. interior remodel of rear 1st floor. structural work required. remove (e0 rear deck and stairs, remodel 2nd floor to replace (e) bedroom & (e) bath w/(n) family room & 1/2 bath. remodel 3rd floor (e) bath & (e) bedroom closet.Details
expand (e) basement level room into bedroom w/(n) bath. interior remodel of rear 1st floor. structural work required. remove (e0 rear deck and stairs, remodel 2nd floor to replace (e) bedroom & (e) bath w/(n) family room & 1/2 bath. remodel 3rd floor (e) bath & (e) bedroom closet. | $90,523 |
| Mar 12, 2014 | Completed final sign-off Feb 2015 | 69 Uranus Tr | remodel kitchen & existing bathrooms, expansion of existing basement level room to create new bedroom & bth. no changes to exterior.Details
remodel kitchen & existing bathrooms, expansion of existing basement level room to create new bedroom & bth. no changes to exterior. | $95,000 |
| Feb 5, 2014 | Never finaled issued Feb 2014, no final | 3945 25th St | revision to appl #2013.01.04.7214 - delete balcony, set back luandry room, change garage door to wood, add lighting & modify stairs & bathroom at 1st floor.Details
revision to appl #2013.01.04.7214 - delete balcony, set back luandry room, change garage door to wood, add lighting & modify stairs & bathroom at 1st floor. | $2,400 |
| Jan 3, 2014 | Completed final sign-off May 2015 | 3028 Laguna St | replace (e) windows w/(n) dual-pane al clad wood winodws w/historical detail at front, provide (n) winodws at rear & side. elevations, (n) family room & bath in (e) unconditioned aera, plumbing & electrical work via sep permit.Details
replace (e) windows w/(n) dual-pane al clad wood winodws w/historical detail at front, provide (n) winodws at rear & side. elevations, (n) family room & bath in (e) unconditioned aera, plumbing & electrical work via sep permit. | $67,730 |
| Nov 27, 2013 | Completed final sign-off May 2015 | 3028 Laguna St | exterior remodel of dwelling, including .replace portion of (e) sloped roof with (n) flat roof. relocate (e) stair cabin. (n) master bath, family room & bath. (n) windows, expand (e) roof deck.Details
exterior remodel of dwelling, including .replace portion of (e) sloped roof with (n) flat roof. relocate (e) stair cabin. (n) master bath, family room & bath. (n) windows, expand (e) roof deck. | $74,080 |
| Oct 2, 2013 | Completed final sign-off May 2015 | 3028 Laguna St | interior remodel of dwelling, including siesmic upgrade, new interior stair, new 1/2 bath and full bath, kitchen remodel, and new bedroom. plumbing & electrical on seperate permit. no exterior work.Details
interior remodel of dwelling, including siesmic upgrade, new interior stair, new 1/2 bath and full bath, kitchen remodel, and new bedroom. plumbing & electrical on seperate permit. no exterior work. | $206,126 |
| May 10, 2013 | Completed final sign-off Sep 2013 | 200 Beacon St | bathroom & kitchen remodel- replace cabinets and plumbing fixtures. new locations of plumbing shall remain the same. work will comply with current title 24 as required & all current building, plumbing & electrical codes as adopted. bathroom & kitchen remodel only.Details
bathroom & kitchen remodel- replace cabinets and plumbing fixtures. new locations of plumbing shall remain the same. work will comply with current title 24 as required & all current building, plumbing & electrical codes as adopted. bathroom & kitchen remodel only. | $45,000 |
| Oct 10, 2012 | Completed final sign-off Jan 2013 | 200 Beacon St | remodel (2) two bathrooms. enclose 5 sq ft of (e) deck to be used as bathrm in the master bath.Details
remodel (2) two bathrooms. enclose 5 sq ft of (e) deck to be used as bathrm in the master bath. | $30,000 |
| Oct 24, 2011 | Completed final sign-off Feb 2012 | 3792 16th St | interior remodel of upper unit (#3972) of 2 unit residential bldg. including demo of non-structural walls, kitchen & bath. remodel & replacement of windows in kind.Details
interior remodel of upper unit (#3972) of 2 unit residential bldg. including demo of non-structural walls, kitchen & bath. remodel & replacement of windows in kind. | $65,000 |
| Jul 15, 2010 | Completed final sign-off Jan 2011 | 350 Valdez Av | remodel (e) kitchen and bathroom. replace cabinets, plbg and elec. fixtures. new tiled surfaces and slab counters. no structural work will be done. all electrical will be title 24 compliant. work on first floor above garageDetails
remodel (e) kitchen and bathroom. replace cabinets, plbg and elec. fixtures. new tiled surfaces and slab counters. no structural work will be done. all electrical will be title 24 compliant. work on first floor above garage | $38,000 |
| May 21, 2010 | Completed final sign-off Sep 2010 | 216 Fair Oaks St | legalize (e) remodel of single fam. residence. move door from garage to hall. increase headroom @ stair landing. increase headroom @ bath#2. remove & replace in-kind ext. stair. add bollard @ water heater.Details
legalize (e) remodel of single fam. residence. move door from garage to hall. increase headroom @ stair landing. increase headroom @ bath#2. remove & replace in-kind ext. stair. add bollard @ water heater. | $12,000 |
| May 27, 2009 | Completed final sign-off Nov 2009 | 840 Powell St | work @ unit# 401 only. bath remodel # 2.Details
work @ unit# 401 only. bath remodel # 2. | $6,000 |
| Mar 26, 2009 | Completed final sign-off May 2010 | 3951 26th St | remodel (e) 2 story single family residence includes 1st floor. remodel in (e) garage adding 2 bedrooms, 1 bathroom, laundry. also construct new stairs, new bathroom at 2nd story & new deck at rearDetails
remodel (e) 2 story single family residence includes 1st floor. remodel in (e) garage adding 2 bedrooms, 1 bathroom, laundry. also construct new stairs, new bathroom at 2nd story & new deck at rear | $120,000 |
| Mar 9, 2009 | Completed final sign-off Nov 2009 | 840 Powell St | 1 kitchen remodel and 1 bath remodel. we will meet title 24 compliance for all new work. kitchen:15'x 20' appliance, cabinet, lighting, plumbing fixture, countertop. area= 6' x 8' replace vanity, light fixture, toilet. no relocation of (e) walls. 0 egress door work &no window work on this permitDetails
1 kitchen remodel and 1 bath remodel. we will meet title 24 compliance for all new work. kitchen:15'x 20' appliance, cabinet, lighting, plumbing fixture, countertop. area= 6' x 8' replace vanity, light fixture, toilet. no relocation of (e) walls. 0 egress door work &no window work on this permit | $75,000 |
| Feb 4, 2009 | Completed final sign-off Feb 2010 | 375 Valdez Av | the project includes a partial interior remodel of ground floor of 2-story single family residence. new master bedroom/bath, guest bath, wine cellar, laundry, media room and office. partial foundation replacement, rebuild interior stair. replace in kind front entry stair. new electrical, lightingDetails
the project includes a partial interior remodel of ground floor of 2-story single family residence. new master bedroom/bath, guest bath, wine cellar, laundry, media room and office. partial foundation replacement, rebuild interior stair. replace in kind front entry stair. new electrical, lighting | $175,000 |
| Nov 12, 2008 | Expired or cancelled cancelled Aug 2012 | 444 Collingwood St | remodel 2 unit 3-story residential bldg w/ interior remodel of lower unit w/new master bath, kitchen, 1/2 bath, new interior stair, replace existing front decks, new windows & doors & exterior finishes - voluntary seismic upgrade as shown on plans.Details
remodel 2 unit 3-story residential bldg w/ interior remodel of lower unit w/new master bath, kitchen, 1/2 bath, new interior stair, replace existing front decks, new windows & doors & exterior finishes - voluntary seismic upgrade as shown on plans. | $150,000 |
| Oct 17, 2005 | Expired or cancelled expired Jan 2009 | 5 Winfield St | (n)addition @front of property including:demo (e)front porch & build (n) enclosed living room space,w/(n)bedroom below. (n)horiz.addition @south of prop.for home office w/storage below.(n)internal stair from 1/f to basement.(n)bath @1/f.adjust (e)ext.stair to suit (n)layout.Details
(n)addition @front of property including:demo (e)front porch & build (n) enclosed living room space,w/(n)bedroom below. (n)horiz.addition @south of prop.for home office w/storage below.(n)internal stair from 1/f to basement.(n)bath @1/f.adjust (e)ext.stair to suit (n)layout. | $80,000 |
| Mar 22, 2005 | Completed final sign-off Jun 2006 | 1708 Broderick St | r/r foundation walk&footings&slabs.build new stair from 1st&2nd floor.build bedroom &move (e) bath..Details
r/r foundation walk&footings&slabs.build new stair from 1st&2nd floor.build bedroom &move (e) bath.. | $80,000 |
| May 8, 2002 | Completed final sign-off Mar 2003 | 476 27th St | remodel basement to provide bedrooms &bath, const. int. stair to living areaDetails
remodel basement to provide bedrooms &bath, const. int. stair to living area | $125,000 |