Blackwater Construction
- Based in
- Mill Valley
- On San Francisco permits
- Oct 2013 to Jan 2021
- Last 24 months
- 0 permits filed
16 permits since 2000: 15 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 8 days from filing to permit and 61 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2016 | Completed final sign-off May 2016 | 47 Cortland Av | repair exterior stairs for condo conversion cc_-8033 for less than 50% for gurard railing, risers & connections as needed rear stairway onlyDetails
repair exterior stairs for condo conversion cc_-8033 for less than 50% for gurard railing, risers & connections as needed rear stairway only | $1,800 |
| Dec 26, 2014 | Completed final sign-off Apr 2015 | 2243 Green St | replace existing stairs and landings in kind due to rot. comply with 200225425 item 1Details
replace existing stairs and landings in kind due to rot. comply with 200225425 item 1 | $14,000 |