Back to bathroom remodel contractors
Blackwater Construction
- Based in
- Mill Valley
- On San Francisco permits
- Oct 2013 to Jan 2021
- Last 24 months
- 0 permits filed
16 permits since 2000: 15 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2020 | Completed final sign-off Mar 2021 | 2621 Laguna St | cosmetic kitchen and bathroom remodelDetails
cosmetic kitchen and bathroom remodel | $60,000 |
| Aug 9, 2016 | Completed final sign-off Feb 2017 | 2621 Laguna St | cosmetic remodel (1) kitchen & (1) bathroom, non structural.Details
cosmetic remodel (1) kitchen & (1) bathroom, non structural. | $18,000 |
| Aug 3, 2015 | Completed final sign-off Nov 2015 | 1921 Grant Av | revision 201507010457. modify bathroom under previous permitDetails
revision 201507010457. modify bathroom under previous permit | $4,000 |
| Jul 1, 2015 | Completed final sign-off Nov 2015 | 1921 Grant Av | modify closet area & convert to bathroom.Details
modify closet area & convert to bathroom. | $8,000 |
| Apr 2, 2015 | Completed final sign-off Aug 2015 | 2621 Laguna St | cosmetic kitchen & bath remodeling, new cabinets, tub, drywall. work in unit #3. no change to doors or windows. no structural work, no wall mofiication.Details
cosmetic kitchen & bath remodeling, new cabinets, tub, drywall. work in unit #3. no change to doors or windows. no structural work, no wall mofiication. | $10,000 |
| Mar 24, 2015 | Completed final sign-off Nov 2015 | 1919 Grant Av | unit 1919 - remodel unit - add new bath at 2nd level, infill below habitable space at 1st level, modify (e) lighting throughout, comply w/cec 150.0 (k)Details
unit 1919 - remodel unit - add new bath at 2nd level, infill below habitable space at 1st level, modify (e) lighting throughout, comply w/cec 150.0 (k) | $12,000 |
| Jan 20, 2015 | Completed final sign-off Aug 2015 | 2621 Laguna St | unit 5: cosmetic kitchen & bath remodel, new cabinets, tile, painting. kitchen 80 sq. ft., bath 90 sq. ft.Details
unit 5: cosmetic kitchen & bath remodel, new cabinets, tile, painting. kitchen 80 sq. ft., bath 90 sq. ft. | $10,000 |