Blackwater Construction
- Based in
- Mill Valley
- On San Francisco permits
- Oct 2013 to Jan 2021
- Last 24 months
- 0 permits filed
16 permits since 2000: 15 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2021 | Never finaled issued Jan 2021, no final | 2621 Laguna St | in revision to 202011309793. drywall replacement and new electrical throughout unit. 5/8 types xDetails
in revision to 202011309793. drywall replacement and new electrical throughout unit. 5/8 types x | $60,000 |
| Nov 30, 2020 | Completed final sign-off Mar 2021 | 2621 Laguna St | cosmetic kitchen and bathroom remodelDetails
cosmetic kitchen and bathroom remodel | $60,000 |
| Sep 29, 2016 | Completed final sign-off Feb 2017 | 1737 Sutter St | apt b: cosmetic kitchen remodel. no structural work.Details
apt b: cosmetic kitchen remodel. no structural work. | $20,000 |
| Aug 9, 2016 | Completed final sign-off Feb 2017 | 2621 Laguna St | cosmetic remodel (1) kitchen & (1) bathroom, non structural.Details
cosmetic remodel (1) kitchen & (1) bathroom, non structural. | $18,000 |
| Apr 27, 2016 | Completed final sign-off Sep 2016 | 1401 Chestnut St | soft storey strengthening of garage level for ibc 2012 a4Details
soft storey strengthening of garage level for ibc 2012 a4 | $15,000 |
| Apr 11, 2016 | Completed final sign-off May 2016 | 47 Cortland Av | repair exterior stairs for condo conversion cc_-8033 for less than 50% for gurard railing, risers & connections as needed rear stairway onlyDetails
repair exterior stairs for condo conversion cc_-8033 for less than 50% for gurard railing, risers & connections as needed rear stairway only | $1,800 |
| Aug 3, 2015 | Completed final sign-off Nov 2015 | 1921 Grant Av | revision 201507010457. modify bathroom under previous permitDetails
revision 201507010457. modify bathroom under previous permit | $4,000 |
| Jul 1, 2015 | Completed final sign-off Nov 2015 | 1921 Grant Av | modify closet area & convert to bathroom.Details
modify closet area & convert to bathroom. | $8,000 |
| Apr 2, 2015 | Completed final sign-off Aug 2015 | 2621 Laguna St | cosmetic kitchen & bath remodeling, new cabinets, tub, drywall. work in unit #3. no change to doors or windows. no structural work, no wall mofiication.Details
cosmetic kitchen & bath remodeling, new cabinets, tub, drywall. work in unit #3. no change to doors or windows. no structural work, no wall mofiication. | $10,000 |
| Mar 24, 2015 | Completed final sign-off Nov 2015 | 1919 Grant Av | unit 1919 - remodel unit - add new bath at 2nd level, infill below habitable space at 1st level, modify (e) lighting throughout, comply w/cec 150.0 (k)Details
unit 1919 - remodel unit - add new bath at 2nd level, infill below habitable space at 1st level, modify (e) lighting throughout, comply w/cec 150.0 (k) | $12,000 |
| Feb 19, 2015 | Completed final sign-off Oct 2015 | 2621 Laguna St | foundation replacement along south side wallDetails
foundation replacement along south side wall | $4,000 |
| Jan 20, 2015 | Completed final sign-off Aug 2015 | 2621 Laguna St | unit 5: cosmetic kitchen & bath remodel, new cabinets, tile, painting. kitchen 80 sq. ft., bath 90 sq. ft.Details
unit 5: cosmetic kitchen & bath remodel, new cabinets, tile, painting. kitchen 80 sq. ft., bath 90 sq. ft. | $10,000 |
| Dec 26, 2014 | Completed final sign-off Apr 2015 | 2243 Green St | replace existing stairs and landings in kind due to rot. comply with 200225425 item 1Details
replace existing stairs and landings in kind due to rot. comply with 200225425 item 1 | $14,000 |
| Oct 15, 2014 | Completed final sign-off Nov 2014 | 2342 Franklin St | to obtain final inspection for work approved under pa #2006.0323.7344. all work is complete.Details
to obtain final inspection for work approved under pa #2006.0323.7344. all work is complete. | |
| Oct 7, 2014 | Completed final sign-off Dec 2014 | 2340 Franklin St | to comply with physical inspection report #cc - 7516Details
to comply with physical inspection report #cc - 7516 | $10,500 |
| Oct 15, 2013 | Completed final sign-off Dec 2013 | 54 South Park | install new window in roof storqge areaDetails
install new window in roof storqge area | $30,000 |