Blackline Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2003 to Aug 2026
- Last 24 months
- 20 permits filed
135 permits since 2000: 115 completed, 6 in progress, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
52 bathroom remodel permits: 46 completed, 2 in progress, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2025 | In progress issued Jul 2025 | 43 Whitney St | infill 533 sf ground floor, below existing deck to include new primary suite with bedroom, bathroom, 2 closets, and direct garden access. relocate existing deck stair with new fire rated wall at property line. waterproof existing main floor terrace & relocate associated stair. create new serviceDetails
infill 533 sf ground floor, below existing deck to include new primary suite with bedroom, bathroom, 2 closets, and direct garden access. relocate existing deck stair with new fire rated wall at property line. waterproof existing main floor terrace & relocate associated stair. create new service | $200,000 |
| Apr 14, 2025 | In progress issued Aug 2025 | 461 Anderson St | 1/f: replace garage door, enclose lightwell, remodel (e) bathroom, family room/den, add mudroom & storage room. 2/f: enclose (e) lightwell, add half bath, relocate (e) full bathroom, remodel kitchen.Details
1/f: replace garage door, enclose lightwell, remodel (e) bathroom, family room/den, add mudroom & storage room. 2/f: enclose (e) lightwell, add half bath, relocate (e) full bathroom, remodel kitchen. | $180,000 |
| Jan 8, 2025 | Completed final sign-off Jul 2025 | 2167 28th Av | remodel 2 bathrooms in kind, fixtures to remain in same location. remodel 1 closet. no wall changes. each bathroom approx. 40 sq ft.Details
remodel 2 bathrooms in kind, fixtures to remain in same location. remodel 1 closet. no wall changes. each bathroom approx. 40 sq ft. | $20,000 |
| Oct 9, 2024 | Completed final sign-off Jun 2025 | 375 14th St | remodel kitchen and bath in 5 units in kind, no moving walls. units 1,2,3,4 and 25. replace 25 windows side and back, 17 vinyl in back 8 sides in kind. all windows replaced in kind in same openings.Details
remodel kitchen and bath in 5 units in kind, no moving walls. units 1,2,3,4 and 25. replace 25 windows side and back, 17 vinyl in back 8 sides in kind. all windows replaced in kind in same openings. | $30,000 |
| Aug 1, 2024 | Completed final sign-off Apr 2026 | 40 Sycamore St | mayor's directive 13-01 priority: (front building) replace broke window panes. remove/replace in kind of windows & flooring in @ unit. remove/replace of all doors in @ unit. remove/replace bathroom fixtures & kitchen fixtures. no final completion until the comparable dwelling unit permit is completeDetails
mayor's directive 13-01 priority: (front building) replace broke window panes. remove/replace in kind of windows & flooring in @ unit. remove/replace of all doors in @ unit. remove/replace bathroom fixtures & kitchen fixtures. no final completion until the comparable dwelling unit permit is complete | $10,000 |
| Jun 26, 2024 | Completed final sign-off Jul 2024 | 186 Collins St | remodel (1) bathroom. no walls are moved.Details
remodel (1) bathroom. no walls are moved. | $28,000 |
| Jun 20, 2024 | Expired or cancelled cancelled Jun 2024 | 188 Collins St | remodel bathroom no wall changedDetails
remodel bathroom no wall changed | $20,000 |
| Jun 13, 2024 | Completed final sign-off Jan 2025 | 199 Chestnut St | unit #3: interior kitchen and bath remodel with mech, electrical and plumbing. no exterior changes.Details
unit #3: interior kitchen and bath remodel with mech, electrical and plumbing. no exterior changes. | $200,000 |
| May 20, 2024 | Expired or cancelled withdrawn Jul 2024 | 40 Sycamore St | remodel 2 kitchens and bathrooms. replace 30 windows. to back building- insulate and add exterior cladding. replace front stairs - less than 50%. paint entire building.Details
remodel 2 kitchens and bathrooms. replace 30 windows. to back building- insulate and add exterior cladding. replace front stairs - less than 50%. paint entire building. | $20,000 |
| Oct 27, 2023 | Completed final sign-off Feb 2024 | 33 Gennessee St | remodel bathroom, replace 1-door with pocketdoor, install exhaust fan, replace 1-window in lightwellDetails
remodel bathroom, replace 1-door with pocketdoor, install exhaust fan, replace 1-window in lightwell | $27,000 |
| Jul 6, 2023 | Completed final sign-off Jan 2024 | 528 Natoma St | replace 31 windows (11 street facing) to 13 single hung wood and 20 single hung vinyl, max. u factor 0.30. paint street facade. replace 200 sq.ft. of siding w/ engineered paint. remodel 4 kitchens & 4 baths in kind. also replace 4 gas wall heater in kind, min. eff. 80% maximum u factor 0.30Details
replace 31 windows (11 street facing) to 13 single hung wood and 20 single hung vinyl, max. u factor 0.30. paint street facade. replace 200 sq.ft. of siding w/ engineered paint. remodel 4 kitchens & 4 baths in kind. also replace 4 gas wall heater in kind, min. eff. 80% maximum u factor 0.30 | $60,000 |
| Jun 27, 2023 | Completed final sign-off Aug 2023 | 344 Precita Av | remodel kitchen and 1 bath add drywall over lath and plaster in 3 rooms replace 2 gas heaters w/ direct vent type (in kind) add lights to ceiling in 5 rooms, comply with cec 150.0(k). no exterior workDetails
remodel kitchen and 1 bath add drywall over lath and plaster in 3 rooms replace 2 gas heaters w/ direct vent type (in kind) add lights to ceiling in 5 rooms, comply with cec 150.0(k). no exterior work | $20,000 |
| May 12, 2023 | Never finaled issued May 2023, no final | 208 Joost Av | add bathroom to 2nd flr w/shower, wc and 2 sinks w/skylight, add washer/ dryer hookup & laundry sink at 2nd flr.Details
add bathroom to 2nd flr w/shower, wc and 2 sinks w/skylight, add washer/ dryer hookup & laundry sink at 2nd flr. | $28,000 |
| Apr 10, 2023 | Completed final sign-off Nov 2023 | 300 Ocean Av | remodel units: 1,3,4,5,and 8. remodel kitchen and bathroom. (10) total.Details
remodel units: 1,3,4,5,and 8. remodel kitchen and bathroom. (10) total. | $20,000 |
| Jan 3, 2023 | Completed final sign-off Jul 2023 | 300 Ocean Av | unit #2,6,7: repair/replace stucco & repaint; remodel 3 kitchen & 3 bathroom (1 kitchen + 1 bath in each apartment; 3 apartments).Details
unit #2,6,7: repair/replace stucco & repaint; remodel 3 kitchen & 3 bathroom (1 kitchen + 1 bath in each apartment; 3 apartments). | $60,000 |
| Apr 15, 2022 | Completed final sign-off Nov 2022 | 375 14th St | replace all (116) windows. double-hung wood windows with integrated ogee lugs on front and side elevations. vinyl at rear elevation. remodel 16 kitchens and 16 bathrooms.Details
replace all (116) windows. double-hung wood windows with integrated ogee lugs on front and side elevations. vinyl at rear elevation. remodel 16 kitchens and 16 bathrooms. | $60,000 |
| Feb 8, 2022 | Completed final sign-off Jul 2022 | 60 Retiro Wy | kitchen, bathroom, & laundry remodelDetails
kitchen, bathroom, & laundry remodel | $67,200 |
| Jan 20, 2022 | Completed final sign-off Mar 2022 | 644 Guerrero St | remodel (e) 1 kitchen & 1 bathroom.Details
remodel (e) 1 kitchen & 1 bathroom. | $29,500 |
| Dec 9, 2021 | Completed final sign-off Mar 2022 | 305 San Carlos St | unit 6: remodel 1 kitchen and 1 bathroom in unit 6: non structuralDetails
unit 6: remodel 1 kitchen and 1 bathroom in unit 6: non structural | $72,000 |
| Nov 15, 2021 | Completed final sign-off Jan 2022 | 2217 Mission St | unit 203: remodel of bathroom and kitchen in unit #203. like of like, no wall removal.Details
unit 203: remodel of bathroom and kitchen in unit #203. like of like, no wall removal. | $22,000 |
| Oct 6, 2021 | Completed final sign-off Jan 2022 | 2217 Mission St | remodel one kitchen and three bathrooms: no walls will be altered. remodel in-kind. comply w/ cec 150.0(k)3 and 150.0(k)5.Details
remodel one kitchen and three bathrooms: no walls will be altered. remodel in-kind. comply w/ cec 150.0(k)3 and 150.0(k)5. | $59,700 |
| Jul 15, 2021 | Completed final sign-off Aug 2021 | 1041 Alabama St | remodel one kitchen and 2 bathrooms. non structural.Details
remodel one kitchen and 2 bathrooms. non structural. | $70,000 |
| Jun 4, 2021 | Completed final sign-off Nov 2021 | 168 Sickles Av | remodel 9 kitchens & 5 bathrooms, partial non structural remodel of 9 units, replacement of 3 windows & 1 door all of which face into the courtyard, paint with scaffold front facade.Details
remodel 9 kitchens & 5 bathrooms, partial non structural remodel of 9 units, replacement of 3 windows & 1 door all of which face into the courtyard, paint with scaffold front facade. | $100,000 |
| Mar 23, 2021 | Completed final sign-off Apr 2023 | 2682 Folsom St | unit 2682-b: replace (4) windows, (1) exterior door in-kind, repair siding 10 sq. ft., remodel (1) kitchen & (1) bath, replace waterheater & wall heater, no change to wall layout, no wall demoDetails
unit 2682-b: replace (4) windows, (1) exterior door in-kind, repair siding 10 sq. ft., remodel (1) kitchen & (1) bath, replace waterheater & wall heater, no change to wall layout, no wall demo | $25,000 |
| Mar 23, 2021 | Completed final sign-off Apr 2023 | 2682 Folsom St | unit 2682-a: replace (4) windows, (1) door in-kind, remodel kitchen & bath in-kind, replace waterheater & wall heater, no change to wall layout, no wall demoDetails
unit 2682-a: replace (4) windows, (1) door in-kind, remodel kitchen & bath in-kind, replace waterheater & wall heater, no change to wall layout, no wall demo | $25,000 |
| Mar 23, 2021 | Completed final sign-off Apr 2023 | 2682 Folsom St | unit 2682-c: replace (4) windows, (1) door in-kind, repair siding, remodel (1) kitchen & (1) bath, replace waterheater & wall heater, no change to wall layout, no wall demoDetails
unit 2682-c: replace (4) windows, (1) door in-kind, repair siding, remodel (1) kitchen & (1) bath, replace waterheater & wall heater, no change to wall layout, no wall demo | $25,000 |
| Mar 23, 2021 | Completed final sign-off Apr 2023 | 2682 Folsom St | unit 2682-d: replace (4) windows, (1) exterior door in-kind, remodel (1) kitchen & (1) bath, replace waterheater & wall heater, no change to wall layout, no wall demoDetails
unit 2682-d: replace (4) windows, (1) exterior door in-kind, remodel (1) kitchen & (1) bath, replace waterheater & wall heater, no change to wall layout, no wall demo | $25,000 |
| Mar 22, 2021 | Completed final sign-off Feb 2022 | 2676 Folsom St | unit d. remodel 1 unit including kitchen & bathroom. replace 1 exteror door in kind. replace 1 water heater, replace 1 gas wall heater. no changes, like for like.Details
unit d. remodel 1 unit including kitchen & bathroom. replace 1 exteror door in kind. replace 1 water heater, replace 1 gas wall heater. no changes, like for like. | $25,000 |
| Mar 22, 2021 | Completed final sign-off Feb 2022 | 2676 Folsom St | unit c. remodel 1 unit including kitchen & bathroom. replace 1 exteror door in kind, replace 4 windows in kind, facing street, will be fiberglass. replace 1 water heater, replace 1 gas wall heater.Details
unit c. remodel 1 unit including kitchen & bathroom. replace 1 exteror door in kind, replace 4 windows in kind, facing street, will be fiberglass. replace 1 water heater, replace 1 gas wall heater. | $25,000 |
| Mar 22, 2021 | Completed final sign-off Oct 2021 | 2676 Folsom St | unit b. remodel 1 unit including 2 kitchen & bathroom. replace 1 exteror door in kind, replace 1 water heater, replace 1 gas wall heater.windows facing street wood or alum.Details
unit b. remodel 1 unit including 2 kitchen & bathroom. replace 1 exteror door in kind, replace 1 water heater, replace 1 gas wall heater.windows facing street wood or alum. | $25,000 |
| Jan 6, 2021 | Completed final sign-off Apr 2023 | 239 Clayton St | remodel 6 kitchens & 6 bathrooms. no new wall & no existing wall relocation. all plumbing fixtures remain at same location. new lighting in kitchen and bathroom remodel shall comply with cec 150kDetails
remodel 6 kitchens & 6 bathrooms. no new wall & no existing wall relocation. all plumbing fixtures remain at same location. new lighting in kitchen and bathroom remodel shall comply with cec 150k | $79,700 |
| Oct 15, 2020 | Completed final sign-off Apr 2021 | 2676 Folsom St | remodel kitchen, bath, replace 7 windows in kind/retrofit. replace 2 exterior doors in kind windows at front to be either fiberglass, fibrex, aluminum or wood.Details
remodel kitchen, bath, replace 7 windows in kind/retrofit. replace 2 exterior doors in kind windows at front to be either fiberglass, fibrex, aluminum or wood. | $20,000 |
| Feb 18, 2020 | Completed final sign-off Oct 2020 | 307 Athens St | remodel entry, livingrooms, bathroom & bedrooms, removal of cabninets. add fireplace insert in (e) fireplace. add a laundry box on g/f. upgrade electrical & add new lighting. remodel (e) bathroom.Details
remodel entry, livingrooms, bathroom & bedrooms, removal of cabninets. add fireplace insert in (e) fireplace. add a laundry box on g/f. upgrade electrical & add new lighting. remodel (e) bathroom. | $20,000 |
| Feb 27, 2019 | Completed final sign-off Aug 2019 | 300 Berry St | replace (e) cabinets in kitchen and bathroom. replace in kind. compy w/ cec150.0 (k)3 and cec 150.0 (k) 5Details
replace (e) cabinets in kitchen and bathroom. replace in kind. compy w/ cec150.0 (k)3 and cec 150.0 (k) 5 | $25,000 |
| Jan 25, 2019 | Completed final sign-off Jul 2019 | 74 New Montgomery St | unit 609 - remove closet remove ceiling, raise elec conduits & lights to new (e) ceiling, create storage over bathDetails
unit 609 - remove closet remove ceiling, raise elec conduits & lights to new (e) ceiling, create storage over bath | $25,000 |
| Jul 11, 2018 | Completed final sign-off Dec 2018 | 2420 Lake St | remodel 2-1/2 bathrooms, new fixtures & tiles. layout unchanged and no walls modified or infilled.Details
remodel 2-1/2 bathrooms, new fixtures & tiles. layout unchanged and no walls modified or infilled. | $33,000 |
| May 4, 2018 | Completed final sign-off Jul 2018 | 600 Buchanan St | remodel bathroom.Details
remodel bathroom. | $12,500 |
| Jan 4, 2018 | Completed final sign-off Oct 2018 | 865 Vallejo St | remodel like materials to update residential space, new flooring at 2 bedrooms, 2.5 bath, 1 kitchen. like kitchen cabinets, same layout as existing. new bath, tile, same bathroom layouts. new hardwood floorsDetails
remodel like materials to update residential space, new flooring at 2 bedrooms, 2.5 bath, 1 kitchen. like kitchen cabinets, same layout as existing. new bath, tile, same bathroom layouts. new hardwood floors | $125,000 |
| Aug 6, 2015 | Completed final sign-off Mar 2016 | 601 Van Ness Av | update finishes in 1 bathroom. plumbing and electrical remain the same location: new shower, toilet and sink; new light fixture and new fan. no change on walls.Details
update finishes in 1 bathroom. plumbing and electrical remain the same location: new shower, toilet and sink; new light fixture and new fan. no change on walls. | $15,000 |
| Mar 5, 2015 | Completed final sign-off Jun 2015 | 865 Vallejo St | update finishes in (2) bathrooms, plumbing remain the same. add (2) light fixtures, (2) switches, (4) circuits. no change on walls.Details
update finishes in (2) bathrooms, plumbing remain the same. add (2) light fixtures, (2) switches, (4) circuits. no change on walls. | $38,000 |
| Aug 28, 2014 | Completed final sign-off Feb 2015 | 217 Masonic Av | renovate kitchen, renovate/turn 1 bathroom into 2 bathrooms.Details
renovate kitchen, renovate/turn 1 bathroom into 2 bathrooms. | $100,000 |
| Jul 30, 2013 | Completed final sign-off Dec 2013 | 74 Sanchez St | unit #2:remove approximately 5' of kitchen wall,move bathroom wall 1.5' , install post and beam. remove and replace bathroom and kitchen cabinets. fixtures and finishes.Details
unit #2:remove approximately 5' of kitchen wall,move bathroom wall 1.5' , install post and beam. remove and replace bathroom and kitchen cabinets. fixtures and finishes. | $75,000 |
| Apr 19, 2013 | Completed final sign-off Jun 2013 | 108 San Jose Av | 2 bathroom remodels - new toilets, shower (replace 1 tub), new tile floor, 2 new sinks, new vanities. no reconfiguration or relocation. no lighting change.Details
2 bathroom remodels - new toilets, shower (replace 1 tub), new tile floor, 2 new sinks, new vanities. no reconfiguration or relocation. no lighting change. | $40,000 |
| Mar 11, 2011 | Completed final sign-off Mar 2011 | 527 Day St | bathroom upgrade. new fixtures, finishes, lighting changes must comply with cec 150kDetails
bathroom upgrade. new fixtures, finishes, lighting changes must comply with cec 150k | $9,037 |
| Apr 23, 2008 | Completed final sign-off Mar 2013 | 435 Burnett Av | horizontal addition to rear of existing second floor 59 sq.ft. new 3rd story vertical addition for master bedroom & bathroom. including new stair. new fireplace.Details
horizontal addition to rear of existing second floor 59 sq.ft. new 3rd story vertical addition for master bedroom & bathroom. including new stair. new fireplace. | $77,000 |
| Oct 15, 2007 | Completed final sign-off Nov 2008 | 435 Burnett Av | 1st floort bathroom renovation, replace forced-air heating with radient heating by accessing. 2nd floor from below (through ceiling of 1st floor)Details
1st floort bathroom renovation, replace forced-air heating with radient heating by accessing. 2nd floor from below (through ceiling of 1st floor) | $30,000 |
| Aug 28, 2007 | Never finaled issued Aug 2007, no final | 107 Holladay Av | (n) fixed skylight of less than 1'.0" in height above roof in (e) bathroom, 5'-0" from property line.Details
(n) fixed skylight of less than 1'.0" in height above roof in (e) bathroom, 5'-0" from property line. | $1,000 |
| Aug 10, 2007 | Completed final sign-off Nov 2007 | 107 Holladay Av | bathroom renovation. remove & replace tub, toilet, vanity, tile floor & surround at existing locations. install new exhaust fan. no structural.Details
bathroom renovation. remove & replace tub, toilet, vanity, tile floor & surround at existing locations. install new exhaust fan. no structural. | $15,000 |
| Feb 28, 2007 | Completed final sign-off Mar 2007 | 34 Clayton St | adding toilet to (e) bathroom remodel, please refer application #2007/02/26/4889Details
adding toilet to (e) bathroom remodel, please refer application #2007/02/26/4889 | $12,000 |
| Feb 1, 2006 | Completed final sign-off May 2006 | 572 Ortega St | renovate first floor bathroom remove and replace tub, toilet vanity finish floor relocate 1 gfci outlet 2 switches and 1 light fixtureDetails
renovate first floor bathroom remove and replace tub, toilet vanity finish floor relocate 1 gfci outlet 2 switches and 1 light fixture | $15,000 |
| Mar 11, 2005 | Completed final sign-off Jul 2005 | 555 Eureka St | renovation of kitchen and bathroom on main floor - kitchen will have new flooring, cabinets,Details
renovation of kitchen and bathroom on main floor - kitchen will have new flooring, cabinets, | $30,000 |
| Nov 13, 2003 | Completed final sign-off Aug 2005 | 166 Curtis St | addition of master bedroom, master bath to (e) 1st level, add family room at rear to garage levelDetails
addition of master bedroom, master bath to (e) 1st level, add family room at rear to garage level | $75,000 |