Block 1211, lot 007

239 Clayton St

City’s use
Multi-Family Residential
Built
1909
Stories
3
Units
6
Rooms
6 bathrooms
Building
6,225 sq ft
Lot
2,652 sq ft
Zoning
RH3
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

9 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 15, 2024In progress
filed Nov 2024, not yet issued
239 Clayton Stevacuation maps for 1st- 4th fl
Details
Permit
202411155139
Status
filed
Filed
Nov 15, 2024
Address
239 Clayton St

evacuation maps for 1st- 4th fl

Open the permit page

Mar 8, 2023Completed
final sign-off Mar 2023
239 Clayton StCrime Watch Security Sys Llcupgrade () fire alarm system to comply with sffc section 1103.7.6.1 and include sprinkler monitoring. ref pa 2020-1021-7055
Details
Permit
202303083243
Status
complete
Filed
Mar 8, 2023
Permit issued
Mar 8, 2023
Final sign-off
Mar 17, 2023
Declared cost
$29,400
Address
239 Clayton St

upgrade () fire alarm system to comply with sffc section 1103.7.6.1 and include sprinkler monitoring. ref pa 2020-1021-7055

Open the permit page

$29,400
Aug 15, 2022Completed
final sign-off Apr 2023
239 Clayton StAll Star Fire Protection Llcinstall new fire sprinklers throughout gr fl including 2" dedicated service ref 202010217055
Details
Permit
202208150507
Status
complete
Filed
Aug 15, 2022
Permit issued
Aug 16, 2022
Final sign-off
Apr 3, 2023
Declared cost
$14,500
Address
239 Clayton St

install new fire sprinklers throughout gr fl including 2" dedicated service ref 202010217055

Open the permit page

$14,500
Jan 6, 2021Completed
final sign-off Apr 2023
239 Clayton StBlackline Constructionremodel 6 kitchens & 6 bathrooms. no new wall & no existing wall relocation. all plumbing fixtures remain at same location. new lighting in kitchen and bathroom remodel shall comply with cec 150k
Details
Permit
202101062158
Status
complete
Filed
Jan 6, 2021
Permit issued
Jan 6, 2021
Final sign-off
Apr 19, 2023
Declared cost
$79,700
Address
239 Clayton St

remodel 6 kitchens & 6 bathrooms. no new wall & no existing wall relocation. all plumbing fixtures remain at same location. new lighting in kitchen and bathroom remodel shall comply with cec 150k

Open the permit page

$79,700
Oct 21, 2020Completed
final sign-off Apr 2023
239 Clayton StBlackline Constructionrevision to pa# 201910255559. existing 6 unit electrical upgrade, main panel amp increase, addition of 2 adu's, update 3 existing kitchens.
Details
Permit
202010217055
Status
complete
Filed
Oct 21, 2020
Permit issued
Jun 30, 2022
Final sign-off
Apr 19, 2023
Declared cost
$300,000
Address
239 Clayton St

revision to pa# 201910255559. existing 6 unit electrical upgrade, main panel amp increase, addition of 2 adu's, update 3 existing kitchens.

Open the permit page

$300,000
Oct 25, 2019Completed
final sign-off Apr 2023
239 Clayton Strev to pa# 201905221372: under revision a portion of the foundation slab will be demolished and excavated 7" to create ground floor ceiling heights suitable for residental use
Details
Permit
201910255559
Status
complete
Filed
Oct 25, 2019
Permit issued
Dec 16, 2019
Final sign-off
Apr 19, 2023
Declared cost
$10,000
Address
239 Clayton St

rev to pa# 201905221372: under revision a portion of the foundation slab will be demolished and excavated 7" to create ground floor ceiling heights suitable for residental use

Open the permit page

$10,000
May 22, 2019Completed
final sign-off Apr 2023
239 Clayton Stcreates two adus per ord# 162-16 @ basement level of an (e) 6-appartment bldg. work will be performed under (e) soft story retrofit permit# 2017-0912-7804. the entire basement level will be fully sprinklered.
Details
Permit
201905221372
Status
complete
Filed
May 22, 2019
Permit issued
Oct 18, 2019
Final sign-off
Apr 19, 2023
Declared cost
$5,000
Address
239 Clayton St

creates two adus per ord# 162-16 @ basement level of an (e) 6-appartment bldg. work will be performed under (e) soft story retrofit permit# 2017-0912-7804. the entire basement level will be fully sprinklered.

Open the permit page

$5,000
Jun 18, 2018Never finaled
issued Jun 2018, no final
239 Clayton Ststreet space
Details
Permit
M940748
Status
issued
Filed
Jun 18, 2018
Permit issued
Jun 18, 2018
Address
239 Clayton St

street space

Open the permit page

Sep 12, 2017Completed
final sign-off Oct 2018
239 Clayton StSft Construction Corpsoft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4
Details
Permit
201709127804
Status
complete
Filed
Sep 12, 2017
Permit issued
Jun 15, 2018
Final sign-off
Oct 16, 2018
Declared cost
$65,000
Address
239 Clayton St

soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4

Open the permit page

$65,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Blackline Construction (2), All Star Fire Protection Llc, Crime Watch Security Sys Llc, Sft Construction Corp
Architects
Nathan Conrad (2), Michael Ford

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.