Block 3726, lot 061
528 Natoma St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 2
- Units
- 4
- Rooms
- 4 bathrooms
- Building
- 2,590 sq ft
- Lot
- 1,875 sq ft
- Zoning
- RED
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 22, 2024 | Completed final sign-off Jun 2024 | 528 Natoma St | Blackline Construction | provide (n) security bars at (e) front elevation (aluminum clad marval & hung style), 6 total windows 2 at the basement that are non openable security windows bars, and 4 openable security window bars at (e) bedroooms per cbc 1031 and california building standards code part 12, chapter 12-3Details
provide (n) security bars at (e) front elevation (aluminum clad marval & hung style), 6 total windows 2 at the basement that are non openable security windows bars, and 4 openable security window bars at (e) bedroooms per cbc 1031 and california building standards code part 12, chapter 12-3 | $3,500 |
| Aug 8, 2023 | Completed final sign-off Dec 2023 | 528 Natoma St | Blackline Construction | deck repair in-kind < 50% replacement, approved guardrails will be instsalled at deck & stairwell.Details
deck repair in-kind < 50% replacement, approved guardrails will be instsalled at deck & stairwell. | $12,000 |
| Aug 1, 2023 | Completed final sign-off Jan 2024 | 528 Natoma St | Blackline Construction | all 4 units: demolition to studs. remodel remaining portion of interior not coverd under pa 202307061599. add tankless water heater. rebuild closets. replace front windows in kind with wood double hung with ogees. seismic strengthening per sfebc 503.11.1.Details
all 4 units: demolition to studs. remodel remaining portion of interior not coverd under pa 202307061599. add tankless water heater. rebuild closets. replace front windows in kind with wood double hung with ogees. seismic strengthening per sfebc 503.11.1. | $50,000 |
| Jul 6, 2023 | Completed final sign-off Jan 2024 | 528 Natoma St | Blackline Construction | replace 31 windows (11 street facing) to 13 single hung wood and 20 single hung vinyl, max. u factor 0.30. paint street facade. replace 200 sq.ft. of siding w/ engineered paint. remodel 4 kitchens & 4 baths in kind. also replace 4 gas wall heater in kind, min. eff. 80% maximum u factor 0.30Details
replace 31 windows (11 street facing) to 13 single hung wood and 20 single hung vinyl, max. u factor 0.30. paint street facade. replace 200 sq.ft. of siding w/ engineered paint. remodel 4 kitchens & 4 baths in kind. also replace 4 gas wall heater in kind, min. eff. 80% maximum u factor 0.30 | $60,000 |
| May 11, 2023 | Completed final sign-off Nov 2023 | 528 Natoma St | Gateway Roofing And Water Proofing Inc | reroofingDetails
reroofing | $20,960 |
| Feb 17, 2023 | Completed final sign-off Jan 2024 | 528 Natoma St | Blackline Construction | voluntary seismic strengthening of ground flr- new shear walls and foundations, voluntary structural repairs to exterior rear decks and staircase, to comply w/nov# 201979391, remove roof covering at rear deak area.to comply w/nov# 201802811, provide heat. to comply w/nov# 201947472 provide hot waterDetails
voluntary seismic strengthening of ground flr- new shear walls and foundations, voluntary structural repairs to exterior rear decks and staircase, to comply w/nov# 201979391, remove roof covering at rear deak area.to comply w/nov# 201802811, provide heat. to comply w/nov# 201947472 provide hot water | $120,000 |
| Jul 13, 2015 | Completed final sign-off Jul 2015 | 528 Natoma St | Yong Chan Chon (Dba Ace Roofing Co.) | reroofingDetails
reroofing | $11,000 |
| Apr 1, 2011 | Completed final sign-off May 2011 | 528 Natoma St | Mc Kinney & Company | to comply with ces complaint #200452665: repair rear exterior stair less than 50% in-kind, not visible from street. remove and replace dryrot components only. repair and replace in kind.Details
to comply with ces complaint #200452665: repair rear exterior stair less than 50% in-kind, not visible from street. remove and replace dryrot components only. repair and replace in kind. | $1,800 |
| Mar 17, 2011 | Completed final sign-off Mar 2011 | 528 Natoma St | Mc Kinney & Company | repair damaged fire proofing(drywall) at trade corridor ceiling.new 5/8 type x drywall to be installed and fire tape. to comply with notice of violation 201199928.Details
repair damaged fire proofing(drywall) at trade corridor ceiling.new 5/8 type x drywall to be installed and fire tape. to comply with notice of violation 201199928. | $500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Blackline Construction (5), Mc Kinney & Company (2), Gateway Roofing And Water Proofing Inc, Yong Chan Chon (Dba Ace Roofing Co.)
- Engineers
- James Neilson (2)
- Authorized agent-otherss
- Joe Metz
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.