Back to kitchen remodel contractors
Bjlgc Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2011 to Aug 2026
- Last 24 months
- 7 permits filed
148 permits since 2000: 111 completed, 4 in progress, 25 never finaled, 8 expired or cancelled.
Of the 25 never-finaled permits, 1 is 3 to 5 years old, 10 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
32 kitchen remodel permits: 27 completed, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 299 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2024 | Completed final sign-off Jul 2025 | 1998 Broadway | unit 1005: all work in kind. remodel (2) bathrooms, (1) laundry rm with w/d, (1) kitchen with new vanity cabinets, kitchen cabinets and stone. all new plumbing fixtures will comply with current gpm flows. also, new low voltage track lighting in ceiling. (e) ceilings to remain. no structural work.Details
unit 1005: all work in kind. remodel (2) bathrooms, (1) laundry rm with w/d, (1) kitchen with new vanity cabinets, kitchen cabinets and stone. all new plumbing fixtures will comply with current gpm flows. also, new low voltage track lighting in ceiling. (e) ceilings to remain. no structural work. | $209,000 |
| Apr 15, 2024 | Completed final sign-off Feb 2025 | 999 Green St | install a 4" wide x4" tall x4' long wood soffit at entry hall leading to kitchen. install a 4"wide x4 tall x6' long wood soffit at entry hallway leading to living room. install a 3" wide x3" tall 3' long wood soffit in front of guest bedroom door.Details
install a 4" wide x4" tall x4' long wood soffit at entry hall leading to kitchen. install a 4"wide x4 tall x6' long wood soffit at entry hallway leading to living room. install a 3" wide x3" tall 3' long wood soffit in front of guest bedroom door. | $500 |
| Nov 28, 2023 | Completed final sign-off Feb 2025 | 875 California St | ph2-rooftop remodel, new rooftop kitchen, pergola, sound system, fire table, parapet, raised deck area.Details
ph2-rooftop remodel, new rooftop kitchen, pergola, sound system, fire table, parapet, raised deck area. | $90,000 |
| Oct 4, 2022 | Completed final sign-off Aug 2023 | 999 Green St | demo of all interior finishes including cabintry, countertops, tile, plumbing fixtures, and dry wall and framing (no structural) as necessary in kitchen and bathroom, install new led lighting trhoughout, and all new appliancesDetails
demo of all interior finishes including cabintry, countertops, tile, plumbing fixtures, and dry wall and framing (no structural) as necessary in kitchen and bathroom, install new led lighting trhoughout, and all new appliances | $43,500 |
| Nov 18, 2021 | Completed final sign-off Jun 2022 | 999 Green St | remove and replace existing kitchen cabinets, countertops, faucet, and appliances and replace with new in same locations. install new recessed (6ea) low voltage cans in kitchen ceiling and new low voltagae strip lights below upper cabinets and (5ea) new low voltage recessed cans in hallway replacingDetails
remove and replace existing kitchen cabinets, countertops, faucet, and appliances and replace with new in same locations. install new recessed (6ea) low voltage cans in kitchen ceiling and new low voltagae strip lights below upper cabinets and (5ea) new low voltage recessed cans in hallway replacing | $39,500 |
| Jul 8, 2021 | Never finaled issued Jul 2021, no final | 999 Green St | replacement in-kind - no change/no structural. 1 kitchen:reface (e) cabinets, counter, fixtures & lights. 1 powder room: reface (e) cabinets,counter & fixtures. hall way: replace (e) led lights.Details
replacement in-kind - no change/no structural. 1 kitchen:reface (e) cabinets, counter, fixtures & lights. 1 powder room: reface (e) cabinets,counter & fixtures. hall way: replace (e) led lights. | $28,000 |
| Jun 28, 2021 | Completed final sign-off Jan 2023 | 2721 Sacramento St | replace kitchen cabnet doors in kind,tile vanity sink in kind & plmg fixtures in kind. replace and installed light in living room, bedroom and bathroom inkd. no changes/ no structural. maintain ratio assy.Details
replace kitchen cabnet doors in kind,tile vanity sink in kind & plmg fixtures in kind. replace and installed light in living room, bedroom and bathroom inkd. no changes/ no structural. maintain ratio assy. | $26,000 |
| Oct 24, 2019 | Completed final sign-off Dec 2021 | 999 Green St | demo and replacement of all interior finishes including cabinetry, counter tops, hardwood flooring, tile and plumbing fixtures and drywall and framing (no structural) as necessary in kitchen and bathroom. new led lights fixtures, replacement of windows at north andDetails
demo and replacement of all interior finishes including cabinetry, counter tops, hardwood flooring, tile and plumbing fixtures and drywall and framing (no structural) as necessary in kitchen and bathroom. new led lights fixtures, replacement of windows at north and | $47,000 |
| Feb 1, 2019 | Completed final sign-off Sep 2021 | 2164 Hyde St | #305: remodel (e) kitchen & 2 bathrooms in kind. replace (e) appliances, fixtures, cabinets, floors, tile and drywall, led lights. no changes. no structuralDetails
#305: remodel (e) kitchen & 2 bathrooms in kind. replace (e) appliances, fixtures, cabinets, floors, tile and drywall, led lights. no changes. no structural | $75,000 |
| Jan 28, 2019 | Completed final sign-off Aug 2019 | 425 01st St | ref pa# 201808086838 per district bldg insp fergal clancy, add the following language to existing permit: altered existing ceiling which raised in the follwoing locations; kitchen, entrance hall, living room, dining room, master bedroom, closets, master and guest bathrooms.Details
ref pa# 201808086838 per district bldg insp fergal clancy, add the following language to existing permit: altered existing ceiling which raised in the follwoing locations; kitchen, entrance hall, living room, dining room, master bedroom, closets, master and guest bathrooms. | $15,000 |
| Oct 15, 2018 | Completed final sign-off Jun 2019 | 999 Green St | replace all (e) interior doors, kitchen, bath, cabinets, counter tops, appliances, tile & plumbings fixts, hardwood flooring & replace all lighting w/ new led fixts. install new drywall as required & paint.Details
replace all (e) interior doors, kitchen, bath, cabinets, counter tops, appliances, tile & plumbings fixts, hardwood flooring & replace all lighting w/ new led fixts. install new drywall as required & paint. | $40,000 |
| Aug 8, 2018 | Never finaled issued Aug 2018, no final | 425 01st St | kitchen and bathroom remodel: replace (e) cabinets, counter tops, lighting(le), hardwood floors, vanity, tiles. no changes. in kind. maher n/aDetails
kitchen and bathroom remodel: replace (e) cabinets, counter tops, lighting(le), hardwood floors, vanity, tiles. no changes. in kind. maher n/a | $40,000 |
| Feb 28, 2018 | Completed final sign-off Oct 2018 | 999 Green St | unit #1901: replacement of kitchen and bath cabinets, counters, and lighting with all led in same configuration as existing. new plumbing fixtures, tiles, doors and hardwood floor. 1 bathroom, 1 kitchen, replace door in kind. no structural work.Details
unit #1901: replacement of kitchen and bath cabinets, counters, and lighting with all led in same configuration as existing. new plumbing fixtures, tiles, doors and hardwood floor. 1 bathroom, 1 kitchen, replace door in kind. no structural work. | $45,885 |
| Dec 1, 2017 | Completed final sign-off Jan 2019 | 999 Green St | replace 2 (e) pocket door at office/living room, hallway and dkitchen pantry. replace (e) outlets. no changes - in -kindDetails
replace 2 (e) pocket door at office/living room, hallway and dkitchen pantry. replace (e) outlets. no changes - in -kind | $7,500 |
| Jul 5, 2017 | Completed final sign-off Jun 2018 | 999 Green St | unit 2404: replacement in-kind, replace(e) interior doors, kitchen/bath cabinets, appliances, counters, led lights, tile, plumbing fixtures; @ east wall of unit replace (e) window glass onto (e) frame, patch/drywall as needed, no structural.Details
unit 2404: replacement in-kind, replace(e) interior doors, kitchen/bath cabinets, appliances, counters, led lights, tile, plumbing fixtures; @ east wall of unit replace (e) window glass onto (e) frame, patch/drywall as needed, no structural. | $40,000 |
| Apr 27, 2017 | Completed final sign-off Jan 2018 | 624 Noriega St | interior remodel of a kitchen, three bathrooms and living room. work in these areas to include new cabinets, countertops, tile, appliances, plumbing fixtures, low efficacy lighting, lighting controls and outlets per code, interior doors, door hardwares and hardwood flooring. no structural work.Details
interior remodel of a kitchen, three bathrooms and living room. work in these areas to include new cabinets, countertops, tile, appliances, plumbing fixtures, low efficacy lighting, lighting controls and outlets per code, interior doors, door hardwares and hardwood flooring. no structural work. | $30,000 |
| Jan 9, 2017 | Completed final sign-off Mar 2020 | 1167 Munich St | add (n) vertical 2nd fl w/ (n) bedroom, bath. kitchen: replace (e) cabinets, counter, sink & fixtures. bathroom: replace (e) vanity, sink, lights & fixtures.Details
add (n) vertical 2nd fl w/ (n) bedroom, bath. kitchen: replace (e) cabinets, counter, sink & fixtures. bathroom: replace (e) vanity, sink, lights & fixtures. | $160,000 |
| Sep 29, 2016 | Expired or cancelled suspend Aug 2021 | 3241 Washington St | remodel of interior unit & associated structural work including relocating kitchen, baths & laundry. replace existing windows or sashes at select locations. install new radiant heat system. new floors, repaint all walls, ceiling & trims. interiors demo less than 75% casement windows street facing,Details
remodel of interior unit & associated structural work including relocating kitchen, baths & laundry. replace existing windows or sashes at select locations. install new radiant heat system. new floors, repaint all walls, ceiling & trims. interiors demo less than 75% casement windows street facing, | $437,000 |
| Aug 22, 2016 | Completed final sign-off Nov 2016 | 310 Townsend St | replace in kind. no alteration of wall window and door. kitchen - replace existing countertop. bathroom - replace existing vanity sink, faucet, fan and medicine cabinet, tile floor. n/a maherDetails
replace in kind. no alteration of wall window and door. kitchen - replace existing countertop. bathroom - replace existing vanity sink, faucet, fan and medicine cabinet, tile floor. n/a maher | $6,500 |
| Jul 25, 2016 | Never finaled issued Jul 2016, no final | 2 Fallon Pl | replacement in-kind kitchen - replace (e) cabinets and laminate floors, bathroom - replace (e0 cabinets and tile. no structural work - no wall modification.Details
replacement in-kind kitchen - replace (e) cabinets and laminate floors, bathroom - replace (e0 cabinets and tile. no structural work - no wall modification. | $4,800 |
| Jun 23, 2016 | Completed final sign-off Jun 2017 | 999 Green St | unit 3004 - remodel 2 bedrooms, 2 baths and kitchen. existing exterior glazed wall to remain, refurbish (e) frames and galss as requiredDetails
unit 3004 - remodel 2 bedrooms, 2 baths and kitchen. existing exterior glazed wall to remain, refurbish (e) frames and galss as required | $290,100 |
| Jan 22, 2016 | Completed final sign-off Nov 2016 | 999 Green St | replace (e) kitchen cabinets, counter, floor, fixtures and patch drywall. in-kindDetails
replace (e) kitchen cabinets, counter, floor, fixtures and patch drywall. in-kind | $7,500 |
| Dec 30, 2015 | Completed final sign-off Nov 2016 | 771 36th Av | interior remodel, replace kitchen cabinets, finishes & fixtures; (2) bathrooms (powder & full bath), replace fixtures & cabinets; no change to walls, doors or windows. no structural work.Details
interior remodel, replace kitchen cabinets, finishes & fixtures; (2) bathrooms (powder & full bath), replace fixtures & cabinets; no change to walls, doors or windows. no structural work. | $35,000 |
| Oct 29, 2015 | Completed final sign-off Feb 2016 | 1101 Green St | replace (e) counter, cabinets 2 kitchen and office. refinish floors. no change. no walls mokved, removed, added or infilled. all (e) layouts to remain unchangedDetails
replace (e) counter, cabinets 2 kitchen and office. refinish floors. no change. no walls mokved, removed, added or infilled. all (e) layouts to remain unchanged | $20,000 |
| Apr 23, 2015 | Completed final sign-off Jul 2016 | 999 Green St | unit 3101: remodel uni, new light & plumbing fixtures, new hardwood floors throughout, new kitchen cabinets; remodel 1 kitchen, 2 bathrooms, 1 bedroom, no structural.Details
unit 3101: remodel uni, new light & plumbing fixtures, new hardwood floors throughout, new kitchen cabinets; remodel 1 kitchen, 2 bathrooms, 1 bedroom, no structural. | $65,000 |
| Apr 21, 2015 | Completed final sign-off Jul 2016 | 999 Green St | #3103 - remodel kitchen, one bathroom, dining room & living room. inteiror remodel only - new finishes on walls & floors, new light + plumbing fixtures, cabinets. no structural work.Details
#3103 - remodel kitchen, one bathroom, dining room & living room. inteiror remodel only - new finishes on walls & floors, new light + plumbing fixtures, cabinets. no structural work. | $80,000 |
| Apr 2, 2014 | Completed final sign-off Sep 2014 | 229 Brannan St | replacement in kind, kitchen: replace (e) cabinets, sink, countertop,floor,& fixtures, 2 bathrooms :replace (e) vanity,countertops,sinks& fixtures,living room :replace (e) hardwood floor, no changes to doors or windows, all work just for unit 16eDetails
replacement in kind, kitchen: replace (e) cabinets, sink, countertop,floor,& fixtures, 2 bathrooms :replace (e) vanity,countertops,sinks& fixtures,living room :replace (e) hardwood floor, no changes to doors or windows, all work just for unit 16e | $25,500 |
| Apr 8, 2013 | Never finaled issued Apr 2013, no final | 1750 Taylor St | #703- replacement in kind: kitchen- replace existing counter, cabinets, sink, appliances & fixtures. masterbath & hallway bath- replace existing counter, vanity, sink and fixtures.Details
#703- replacement in kind: kitchen- replace existing counter, cabinets, sink, appliances & fixtures. masterbath & hallway bath- replace existing counter, vanity, sink and fixtures. | $24,500 |
| Mar 29, 2013 | Completed final sign-off Nov 2013 | 999 Green St | bunit #1401-replacement in kind, kitchen-replace (e) counter, cabinets, sink, appliances & fixtures. master bathroom & hallway bathroom-replace (e) counter, vanity, sink & fixturesDetails
bunit #1401-replacement in kind, kitchen-replace (e) counter, cabinets, sink, appliances & fixtures. master bathroom & hallway bathroom-replace (e) counter, vanity, sink & fixtures | $24,500 |
| Sep 18, 2012 | Completed final sign-off Jun 2013 | 999 Green St | #2201: replacement "in kind" kitchen: replace (e) counter, cabinets, sink, appliances and fixtures. master bath and hallway bath: replace (e) counter, vanity, sink and fixtures.Details
#2201: replacement "in kind" kitchen: replace (e) counter, cabinets, sink, appliances and fixtures. master bath and hallway bath: replace (e) counter, vanity, sink and fixtures. | $24,500 |
| Apr 18, 2012 | Completed final sign-off Sep 2012 | 1750 Taylor St | unit #902 - remodel existing master bath & add a closet, add a bathtub at guest bath & remodel, enlarge guestroom & remodel kitchen.Details
unit #902 - remodel existing master bath & add a closet, add a bathtub at guest bath & remodel, enlarge guestroom & remodel kitchen. | $125,000 |
| Oct 24, 2011 | Completed final sign-off Sep 2012 | 999 Green St | kitchen: replace existing cabinets, sink, countertop, appliances and fixtures in kind. at least 50% high efficacy wattage, cec150(k). no change to exhaust system.Details
kitchen: replace existing cabinets, sink, countertop, appliances and fixtures in kind. at least 50% high efficacy wattage, cec150(k). no change to exhaust system. | $18,800 |