Back to bathroom remodel contractors
Bjlgc Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2011 to Aug 2026
- Last 24 months
- 7 permits filed
148 permits since 2000: 111 completed, 4 in progress, 25 never finaled, 8 expired or cancelled.
Of the 25 never-finaled permits, 1 is 3 to 5 years old, 10 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
47 bathroom remodel permits: 34 completed, 1 in progress, 10 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 286 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2026 | In progress issued May 2026 | 2828 Divisadero St | add tow new windows at the front elevation on the second floor. replace metal railings at the front elevation. remodel existing bathroom and do dry-rot repair on the ground floor. replace existing window on 4th floor and enlarge it. replace dry-rot beam on third floor.Details
add tow new windows at the front elevation on the second floor. replace metal railings at the front elevation. remodel existing bathroom and do dry-rot repair on the ground floor. replace existing window on 4th floor and enlarge it. replace dry-rot beam on third floor. | $70,000 |
| Oct 9, 2024 | Completed final sign-off Jul 2025 | 1998 Broadway | unit 1005: all work in kind. remodel (2) bathrooms, (1) laundry rm with w/d, (1) kitchen with new vanity cabinets, kitchen cabinets and stone. all new plumbing fixtures will comply with current gpm flows. also, new low voltage track lighting in ceiling. (e) ceilings to remain. no structural work.Details
unit 1005: all work in kind. remodel (2) bathrooms, (1) laundry rm with w/d, (1) kitchen with new vanity cabinets, kitchen cabinets and stone. all new plumbing fixtures will comply with current gpm flows. also, new low voltage track lighting in ceiling. (e) ceilings to remain. no structural work. | $209,000 |
| Jun 20, 2024 | Expired or cancelled cancelled Oct 2024 | 2200 Pacific Av | remodel existing bathroom w/ new tile at floors and showerwalls. replacement of vanity & v/tops & faucet. tub/shower combo to be converted to shower only. all new plumbing fixt. throughout (water conservation fix.) all fixtures in the same location as exist no structural workDetails
remodel existing bathroom w/ new tile at floors and showerwalls. replacement of vanity & v/tops & faucet. tub/shower combo to be converted to shower only. all new plumbing fixt. throughout (water conservation fix.) all fixtures in the same location as exist no structural work | $250,000 |
| Mar 6, 2024 | Completed final sign-off Feb 2025 | 2610 Filbert St | remodel of (e) master bathroom with no structural changes. work includes new bathtub, new shower, new vanity, and new wall hung vs. floor mount, toilet, and new tile floor in place of (e) hardwood floor. in kind remodelDetails
remodel of (e) master bathroom with no structural changes. work includes new bathtub, new shower, new vanity, and new wall hung vs. floor mount, toilet, and new tile floor in place of (e) hardwood floor. in kind remodel | $25,000 |
| Apr 13, 2023 | Completed final sign-off Feb 2025 | 875 California St | interior remodel, new dropped ceiling in foyer, new pocket door in living rm, new recessed lighting, speakers, lighting controls throughout unit. new undercounter icemaker at dining rm. new millwork at dining rm, bedroom, closets, bathroom, office, media rm, utility rm.Details
interior remodel, new dropped ceiling in foyer, new pocket door in living rm, new recessed lighting, speakers, lighting controls throughout unit. new undercounter icemaker at dining rm. new millwork at dining rm, bedroom, closets, bathroom, office, media rm, utility rm. | $85,000 |
| Oct 4, 2022 | Completed final sign-off Aug 2023 | 999 Green St | demo of all interior finishes including cabintry, countertops, tile, plumbing fixtures, and dry wall and framing (no structural) as necessary in kitchen and bathroom, install new led lighting trhoughout, and all new appliancesDetails
demo of all interior finishes including cabintry, countertops, tile, plumbing fixtures, and dry wall and framing (no structural) as necessary in kitchen and bathroom, install new led lighting trhoughout, and all new appliances | $43,500 |
| Nov 18, 2021 | Completed final sign-off Feb 2022 | 999 Green St | remove existing toilet, bath tub-shower combination and tile and replace with new toilet in same location and new shower curb, shower drain, shower pan, pressure balance valve and tile in same location as existing- no structural- no electrical no changes in kind.Details
remove existing toilet, bath tub-shower combination and tile and replace with new toilet in same location and new shower curb, shower drain, shower pan, pressure balance valve and tile in same location as existing- no structural- no electrical no changes in kind. | $9,500 |
| Aug 12, 2021 | Completed final sign-off Oct 2023 | 1956 Fell St | convert extg storage to exercise room with bath and wet bar at 1st floor.Details
convert extg storage to exercise room with bath and wet bar at 1st floor. | $15,000 |
| Jun 28, 2021 | Completed final sign-off Jan 2023 | 2721 Sacramento St | replace kitchen cabnet doors in kind,tile vanity sink in kind & plmg fixtures in kind. replace and installed light in living room, bedroom and bathroom inkd. no changes/ no structural. maintain ratio assy.Details
replace kitchen cabnet doors in kind,tile vanity sink in kind & plmg fixtures in kind. replace and installed light in living room, bedroom and bathroom inkd. no changes/ no structural. maintain ratio assy. | $26,000 |
| Oct 22, 2020 | Completed final sign-off May 2021 | 2200 Pacific Av | demo all existing floor coverings. reinstall hardwood flooring in living room, office, hall, powder room, and master bedroom. demo bathtub and vanity in master bath and vanity in powder room. install new tile floor and a new vanity and tileDetails
demo all existing floor coverings. reinstall hardwood flooring in living room, office, hall, powder room, and master bedroom. demo bathtub and vanity in master bath and vanity in powder room. install new tile floor and a new vanity and tile | $20,000 |
| Oct 24, 2019 | Completed final sign-off Dec 2021 | 999 Green St | demo and replacement of all interior finishes including cabinetry, counter tops, hardwood flooring, tile and plumbing fixtures and drywall and framing (no structural) as necessary in kitchen and bathroom. new led lights fixtures, replacement of windows at north andDetails
demo and replacement of all interior finishes including cabinetry, counter tops, hardwood flooring, tile and plumbing fixtures and drywall and framing (no structural) as necessary in kitchen and bathroom. new led lights fixtures, replacement of windows at north and | $47,000 |
| Feb 1, 2019 | Completed final sign-off Sep 2021 | 2164 Hyde St | #305: remodel (e) kitchen & 2 bathrooms in kind. replace (e) appliances, fixtures, cabinets, floors, tile and drywall, led lights. no changes. no structuralDetails
#305: remodel (e) kitchen & 2 bathrooms in kind. replace (e) appliances, fixtures, cabinets, floors, tile and drywall, led lights. no changes. no structural | $75,000 |
| Jan 28, 2019 | Completed final sign-off Aug 2019 | 425 01st St | ref pa# 201808086838 per district bldg insp fergal clancy, add the following language to existing permit: altered existing ceiling which raised in the follwoing locations; kitchen, entrance hall, living room, dining room, master bedroom, closets, master and guest bathrooms.Details
ref pa# 201808086838 per district bldg insp fergal clancy, add the following language to existing permit: altered existing ceiling which raised in the follwoing locations; kitchen, entrance hall, living room, dining room, master bedroom, closets, master and guest bathrooms. | $15,000 |
| Oct 15, 2018 | Completed final sign-off Jun 2019 | 999 Green St | replace all (e) interior doors, kitchen, bath, cabinets, counter tops, appliances, tile & plumbings fixts, hardwood flooring & replace all lighting w/ new led fixts. install new drywall as required & paint.Details
replace all (e) interior doors, kitchen, bath, cabinets, counter tops, appliances, tile & plumbings fixts, hardwood flooring & replace all lighting w/ new led fixts. install new drywall as required & paint. | $40,000 |
| Aug 8, 2018 | Never finaled issued Aug 2018, no final | 425 01st St | kitchen and bathroom remodel: replace (e) cabinets, counter tops, lighting(le), hardwood floors, vanity, tiles. no changes. in kind. maher n/aDetails
kitchen and bathroom remodel: replace (e) cabinets, counter tops, lighting(le), hardwood floors, vanity, tiles. no changes. in kind. maher n/a | $40,000 |
| Feb 28, 2018 | Completed final sign-off Oct 2018 | 999 Green St | unit #1901: replacement of kitchen and bath cabinets, counters, and lighting with all led in same configuration as existing. new plumbing fixtures, tiles, doors and hardwood floor. 1 bathroom, 1 kitchen, replace door in kind. no structural work.Details
unit #1901: replacement of kitchen and bath cabinets, counters, and lighting with all led in same configuration as existing. new plumbing fixtures, tiles, doors and hardwood floor. 1 bathroom, 1 kitchen, replace door in kind. no structural work. | $45,885 |
| Aug 14, 2017 | Never finaled issued Aug 2017, no final | 1940 Vallejo St | unit # 9 bathroom replace & repair (e) tile, countertop vanity, change out leaking faucet, toilet, living room repalce worn sach & glass only (5) in kind replacemet only not visible to streetDetails
unit # 9 bathroom replace & repair (e) tile, countertop vanity, change out leaking faucet, toilet, living room repalce worn sach & glass only (5) in kind replacemet only not visible to street | $7,500 |
| Jul 5, 2017 | Completed final sign-off Jun 2018 | 999 Green St | unit 2404: replacement in-kind, replace(e) interior doors, kitchen/bath cabinets, appliances, counters, led lights, tile, plumbing fixtures; @ east wall of unit replace (e) window glass onto (e) frame, patch/drywall as needed, no structural.Details
unit 2404: replacement in-kind, replace(e) interior doors, kitchen/bath cabinets, appliances, counters, led lights, tile, plumbing fixtures; @ east wall of unit replace (e) window glass onto (e) frame, patch/drywall as needed, no structural. | $40,000 |
| Apr 27, 2017 | Completed final sign-off Jan 2018 | 624 Noriega St | interior remodel of a kitchen, three bathrooms and living room. work in these areas to include new cabinets, countertops, tile, appliances, plumbing fixtures, low efficacy lighting, lighting controls and outlets per code, interior doors, door hardwares and hardwood flooring. no structural work.Details
interior remodel of a kitchen, three bathrooms and living room. work in these areas to include new cabinets, countertops, tile, appliances, plumbing fixtures, low efficacy lighting, lighting controls and outlets per code, interior doors, door hardwares and hardwood flooring. no structural work. | $30,000 |
| Apr 24, 2017 | Completed final sign-off Apr 2018 | 999 Green St | repair and replace in kind, where neccessary water damaged cabinets, appliances, flooring etc. in living room, dining room and (2) bathrooms. no structural work.Details
repair and replace in kind, where neccessary water damaged cabinets, appliances, flooring etc. in living room, dining room and (2) bathrooms. no structural work. | $18,000 |
| Jan 9, 2017 | Completed final sign-off Mar 2020 | 1167 Munich St | add (n) vertical 2nd fl w/ (n) bedroom, bath. kitchen: replace (e) cabinets, counter, sink & fixtures. bathroom: replace (e) vanity, sink, lights & fixtures.Details
add (n) vertical 2nd fl w/ (n) bedroom, bath. kitchen: replace (e) cabinets, counter, sink & fixtures. bathroom: replace (e) vanity, sink, lights & fixtures. | $160,000 |
| Sep 29, 2016 | Expired or cancelled suspend Aug 2021 | 3241 Washington St | remodel of interior unit & associated structural work including relocating kitchen, baths & laundry. replace existing windows or sashes at select locations. install new radiant heat system. new floors, repaint all walls, ceiling & trims. interiors demo less than 75% casement windows street facing,Details
remodel of interior unit & associated structural work including relocating kitchen, baths & laundry. replace existing windows or sashes at select locations. install new radiant heat system. new floors, repaint all walls, ceiling & trims. interiors demo less than 75% casement windows street facing, | $437,000 |
| Aug 22, 2016 | Completed final sign-off Nov 2016 | 310 Townsend St | replace in kind. no alteration of wall window and door. kitchen - replace existing countertop. bathroom - replace existing vanity sink, faucet, fan and medicine cabinet, tile floor. n/a maherDetails
replace in kind. no alteration of wall window and door. kitchen - replace existing countertop. bathroom - replace existing vanity sink, faucet, fan and medicine cabinet, tile floor. n/a maher | $6,500 |
| Jul 25, 2016 | Never finaled issued Jul 2016, no final | 2 Fallon Pl | replacement in-kind kitchen - replace (e) cabinets and laminate floors, bathroom - replace (e0 cabinets and tile. no structural work - no wall modification.Details
replacement in-kind kitchen - replace (e) cabinets and laminate floors, bathroom - replace (e0 cabinets and tile. no structural work - no wall modification. | $4,800 |
| Jun 23, 2016 | Completed final sign-off Jun 2017 | 999 Green St | unit 3004 - remodel 2 bedrooms, 2 baths and kitchen. existing exterior glazed wall to remain, refurbish (e) frames and galss as requiredDetails
unit 3004 - remodel 2 bedrooms, 2 baths and kitchen. existing exterior glazed wall to remain, refurbish (e) frames and galss as required | $290,100 |
| Dec 30, 2015 | Completed final sign-off Nov 2016 | 771 36th Av | interior remodel, replace kitchen cabinets, finishes & fixtures; (2) bathrooms (powder & full bath), replace fixtures & cabinets; no change to walls, doors or windows. no structural work.Details
interior remodel, replace kitchen cabinets, finishes & fixtures; (2) bathrooms (powder & full bath), replace fixtures & cabinets; no change to walls, doors or windows. no structural work. | $35,000 |
| Jun 26, 2015 | Completed final sign-off Nov 2015 | 945 Green St | scope of work includes arch renovation of 2nd fl unit at 945 green. demo of e bathroom walls and replacement of fixtures and finishesDetails
scope of work includes arch renovation of 2nd fl unit at 945 green. demo of e bathroom walls and replacement of fixtures and finishes | $36,000 |
| Apr 23, 2015 | Completed final sign-off Jul 2016 | 999 Green St | unit 3101: remodel uni, new light & plumbing fixtures, new hardwood floors throughout, new kitchen cabinets; remodel 1 kitchen, 2 bathrooms, 1 bedroom, no structural.Details
unit 3101: remodel uni, new light & plumbing fixtures, new hardwood floors throughout, new kitchen cabinets; remodel 1 kitchen, 2 bathrooms, 1 bedroom, no structural. | $65,000 |
| Apr 21, 2015 | Completed final sign-off Jul 2016 | 999 Green St | #3103 - remodel kitchen, one bathroom, dining room & living room. inteiror remodel only - new finishes on walls & floors, new light + plumbing fixtures, cabinets. no structural work.Details
#3103 - remodel kitchen, one bathroom, dining room & living room. inteiror remodel only - new finishes on walls & floors, new light + plumbing fixtures, cabinets. no structural work. | $80,000 |
| Feb 10, 2015 | Completed final sign-off Jul 2016 | 225 Clipper St | revision to 201312305281. adding bar sink and add permit clarification that 2nd fl bath adjustments as shown in orig permit. relocate water heaterDetails
revision to 201312305281. adding bar sink and add permit clarification that 2nd fl bath adjustments as shown in orig permit. relocate water heater | $4,000 |
| Sep 18, 2014 | Never finaled issued Sep 2014, no final | 1270 Chestnut St | renew app#201309116472 for final inspection. replacement in kind at bathroomDetails
renew app#201309116472 for final inspection. replacement in kind at bathroom | $4,000 |
| Sep 18, 2014 | Never finaled issued Sep 2014, no final | 1270 Chestnut St | unit #2:renew app#201309116471 for final inspection. replacement in kind at bathroomDetails
unit #2:renew app#201309116471 for final inspection. replacement in kind at bathroom | $6,000 |
| Sep 18, 2014 | Never finaled issued Sep 2014, no final | 1270 Chestnut St | unit #1:renew app#201309116470 for final inspection. replacement in kind at bathroomDetails
unit #1:renew app#201309116470 for final inspection. replacement in kind at bathroom | |
| May 15, 2014 | Completed final sign-off May 2014 | 840 Powell St | unit 103: install bathroom fan (1) with new.Details
unit 103: install bathroom fan (1) with new. | $500 |
| Apr 2, 2014 | Completed final sign-off Sep 2014 | 229 Brannan St | replacement in kind, kitchen: replace (e) cabinets, sink, countertop,floor,& fixtures, 2 bathrooms :replace (e) vanity,countertops,sinks& fixtures,living room :replace (e) hardwood floor, no changes to doors or windows, all work just for unit 16eDetails
replacement in kind, kitchen: replace (e) cabinets, sink, countertop,floor,& fixtures, 2 bathrooms :replace (e) vanity,countertops,sinks& fixtures,living room :replace (e) hardwood floor, no changes to doors or windows, all work just for unit 16e | $25,500 |
| Dec 30, 2013 | Completed final sign-off Jul 2016 | 225 Clipper St | foundation & concrete slab replacement, rebuild interior stair (n) fenestration & horiztal/vertical addition @ rear of bldg. upgrade to electrical & plumbing adding 1 1/2 baths. addition of single car garage, driveway & curb cut.Details
foundation & concrete slab replacement, rebuild interior stair (n) fenestration & horiztal/vertical addition @ rear of bldg. upgrade to electrical & plumbing adding 1 1/2 baths. addition of single car garage, driveway & curb cut. | $200,000 |
| Nov 26, 2013 | Completed final sign-off May 2014 | 878 Haight St | bathroom: replace bathroom fixtures in kind and re-finishing floor, no changes, sink, toilet, vanity only.Details
bathroom: replace bathroom fixtures in kind and re-finishing floor, no changes, sink, toilet, vanity only. | $4,500 |
| Sep 11, 2013 | Never finaled issued Sep 2013, no final | 1270 Chestnut St | replacement in kind: bathroom: unit#3 - replace (e) sink, vanity, bathtub, light, fan, drywall, floor and fixtures, livingroom wall heater. no changes - all in kind.Details
replacement in kind: bathroom: unit#3 - replace (e) sink, vanity, bathtub, light, fan, drywall, floor and fixtures, livingroom wall heater. no changes - all in kind. | $8,000 |
| Sep 11, 2013 | Never finaled issued Sep 2013, no final | 1270 Chestnut St | replacement in kind: bathroom: unit#2- replace (e) sink, vanity, bathtub, light, fan, drywall, floor and fixtures. no changes - all in kind.Details
replacement in kind: bathroom: unit#2- replace (e) sink, vanity, bathtub, light, fan, drywall, floor and fixtures. no changes - all in kind. | $8,000 |
| Sep 11, 2013 | Never finaled issued Sep 2013, no final | 1270 Chestnut St | replacement in kind: bathroom: unit#1 - replace (e) sink, vanity, bathtub, light, fan, drywall, floor and fixtures. no changes - all in kind.Details
replacement in kind: bathroom: unit#1 - replace (e) sink, vanity, bathtub, light, fan, drywall, floor and fixtures. no changes - all in kind. | $8,000 |
| Apr 8, 2013 | Never finaled issued Apr 2013, no final | 1750 Taylor St | #703- replacement in kind: kitchen- replace existing counter, cabinets, sink, appliances & fixtures. masterbath & hallway bath- replace existing counter, vanity, sink and fixtures.Details
#703- replacement in kind: kitchen- replace existing counter, cabinets, sink, appliances & fixtures. masterbath & hallway bath- replace existing counter, vanity, sink and fixtures. | $24,500 |
| Mar 29, 2013 | Completed final sign-off Nov 2013 | 999 Green St | bunit #1401-replacement in kind, kitchen-replace (e) counter, cabinets, sink, appliances & fixtures. master bathroom & hallway bathroom-replace (e) counter, vanity, sink & fixturesDetails
bunit #1401-replacement in kind, kitchen-replace (e) counter, cabinets, sink, appliances & fixtures. master bathroom & hallway bathroom-replace (e) counter, vanity, sink & fixtures | $24,500 |
| Sep 18, 2012 | Completed final sign-off Jun 2013 | 999 Green St | # 2203: replacement "ink kind" master bath: replace (e) counter, vanity, snk and fixtures.Details
# 2203: replacement "ink kind" master bath: replace (e) counter, vanity, snk and fixtures. | $10,000 |
| Sep 18, 2012 | Completed final sign-off Jun 2013 | 999 Green St | #2201: replacement "in kind" kitchen: replace (e) counter, cabinets, sink, appliances and fixtures. master bath and hallway bath: replace (e) counter, vanity, sink and fixtures.Details
#2201: replacement "in kind" kitchen: replace (e) counter, cabinets, sink, appliances and fixtures. master bath and hallway bath: replace (e) counter, vanity, sink and fixtures. | $24,500 |
| Jul 12, 2012 | Completed final sign-off Jun 2013 | 121 Liberty St | master bath: replace (e) vanity, sink, tub, light & fixtures in kind on 2nd floor. lighting will comply with title 24. no exterior work.Details
master bath: replace (e) vanity, sink, tub, light & fixtures in kind on 2nd floor. lighting will comply with title 24. no exterior work. | $10,000 |
| Apr 18, 2012 | Completed final sign-off Sep 2012 | 1750 Taylor St | unit #902 - remodel existing master bath & add a closet, add a bathtub at guest bath & remodel, enlarge guestroom & remodel kitchen.Details
unit #902 - remodel existing master bath & add a closet, add a bathtub at guest bath & remodel, enlarge guestroom & remodel kitchen. | $125,000 |
| Mar 20, 2012 | Completed final sign-off Sep 2012 | 999 Green St | unit #1905-bathroom remodel, replace (e) vanity, top, sink & fixtures in kind.Details
unit #1905-bathroom remodel, replace (e) vanity, top, sink & fixtures in kind. | $10,000 |