Bjlgc Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2011 to Aug 2026
- Last 24 months
- 7 permits filed
148 permits since 2000: 111 completed, 4 in progress, 25 never finaled, 8 expired or cancelled.
Of the 25 never-finaled permits, 1 is 3 to 5 years old, 10 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 5 completed, 1 never finaled. Typically 11 days from filing to permit and 59 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2025 | Completed final sign-off Sep 2025 | 310 Walnut St | replacement in-kind (e) dry rot damaged post at rear deck. less than 50% of deck to be altered/replaced.Details
replacement in-kind (e) dry rot damaged post at rear deck. less than 50% of deck to be altered/replaced. | $7,500 |
| May 9, 2024 | Completed final sign-off Feb 2025 | 2610 Filbert St | replace e) deteriorated deck-n) deck will be construscted of pressure treated wood & rot resistant decking to improve safety & mitigation. cantiliver framing & braces for the side. replace deck in kind same size & locationDetails
replace e) deteriorated deck-n) deck will be construscted of pressure treated wood & rot resistant decking to improve safety & mitigation. cantiliver framing & braces for the side. replace deck in kind same size & location | $30,000 |
| Nov 28, 2023 | Completed final sign-off Feb 2025 | 875 California St | ph2-rooftop remodel, new rooftop kitchen, pergola, sound system, fire table, parapet, raised deck area.Details
ph2-rooftop remodel, new rooftop kitchen, pergola, sound system, fire table, parapet, raised deck area. | $90,000 |
| Jun 22, 2023 | Never finaled issued Jul 2023, no final | 2610 Filbert St | repair 12' x 6' quarry tile deck located above homes main/entry. not visible from the street. scope includes: minor repair of dryot at plywood deck surface to allow for re-roofing by anderson roofing. in kind repairDetails
repair 12' x 6' quarry tile deck located above homes main/entry. not visible from the street. scope includes: minor repair of dryot at plywood deck surface to allow for re-roofing by anderson roofing. in kind repair | $6,000 |
| Feb 23, 2015 | Completed final sign-off May 2015 | 53 Marston Av | comply with nov 201519882. rebuild rear deck. remove side deck.Details
comply with nov 201519882. rebuild rear deck. remove side deck. | $5,000 |
| Mar 15, 2013 | Completed final sign-off Apr 2013 | 842 North Point St | interior garage, repair existing dryrot @ wall and ceiling area. exterior garage- repair existing dryrot @ wood siding and frame area, exterior 1st level- repair existing dryrot @ wood siding and deck area.Details
interior garage, repair existing dryrot @ wall and ceiling area. exterior garage- repair existing dryrot @ wood siding and frame area, exterior 1st level- repair existing dryrot @ wood siding and deck area. | $7,000 |