Back to kitchen remodel contractors
Bill Jang Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Dec 2016
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2016 | Completed final sign-off Mar 2017 | 2512 23rd Av | kitchen remodel: new cabinets, countertop, tiles. bathroom remodel: new fixtures, add toilet. for new toilet, provide a minimum 24"x3o"w clear floor space in front of toilet. no (n)wall & no (e)wall relocation. lighting in kitchen & bathroom remodel shall comply w/cec 150.0(k)3 & 150.0(k)5.Details
kitchen remodel: new cabinets, countertop, tiles. bathroom remodel: new fixtures, add toilet. for new toilet, provide a minimum 24"x3o"w clear floor space in front of toilet. no (n)wall & no (e)wall relocation. lighting in kitchen & bathroom remodel shall comply w/cec 150.0(k)3 & 150.0(k)5. | $30,000 |
| May 3, 2006 | Completed final sign-off Jul 2006 | 2474 Fulton St | kitchen renovation new cabinets top fixtures 2 windows in kind all work in unit 2474 only (not visible from street)Details
kitchen renovation new cabinets top fixtures 2 windows in kind all work in unit 2474 only (not visible from street) | $25,000 |
| Feb 9, 2006 | Completed final sign-off May 2006 | 2478 Fulton St | kitchen renovation. new cabinets, flooring, replace in kind windows, appliances, countertops, lighting. no change to partitions. windows not visible from street.Details
kitchen renovation. new cabinets, flooring, replace in kind windows, appliances, countertops, lighting. no change to partitions. windows not visible from street. | $25,000 |
| Oct 4, 2002 | Completed final sign-off Dec 2002 | 33 Terrace Dr | kitchen remodel,new cabinets,counter tops,tile flrs,appliances,bathrm remodel,new sink,toilet tiles.Details
kitchen remodel,new cabinets,counter tops,tile flrs,appliances,bathrm remodel,new sink,toilet tiles. | $45,000 |
| Jan 20, 2000 | Completed final sign-off Jun 2000 | 1610 09th Av | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $30,000 |