Back to bathroom remodel contractors
Bill Jang Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Dec 2016
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 64 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2016 | Completed final sign-off Mar 2017 | 2512 23rd Av | kitchen remodel: new cabinets, countertop, tiles. bathroom remodel: new fixtures, add toilet. for new toilet, provide a minimum 24"x3o"w clear floor space in front of toilet. no (n)wall & no (e)wall relocation. lighting in kitchen & bathroom remodel shall comply w/cec 150.0(k)3 & 150.0(k)5.Details
kitchen remodel: new cabinets, countertop, tiles. bathroom remodel: new fixtures, add toilet. for new toilet, provide a minimum 24"x3o"w clear floor space in front of toilet. no (n)wall & no (e)wall relocation. lighting in kitchen & bathroom remodel shall comply w/cec 150.0(k)3 & 150.0(k)5. | $30,000 |
| Jan 22, 2010 | Completed final sign-off Mar 2010 | 174 Beaver St | bathroom remodel-new fixtures, new tile, new lights. note: work is @ 174 beaver street.Details
bathroom remodel-new fixtures, new tile, new lights. note: work is @ 174 beaver street. | $10,500 |
| Jun 15, 2009 | Completed final sign-off Sep 2009 | 1927 11th Av | bathroom remodel-new tile cabinets, lighting, vanity, tub/shower, toilet. provide fluorescent lights or "manual on" occupancy sensor per title 24 mandatory lighting measures.Details
bathroom remodel-new tile cabinets, lighting, vanity, tub/shower, toilet. provide fluorescent lights or "manual on" occupancy sensor per title 24 mandatory lighting measures. | $12,000 |
| Jun 25, 2008 | Completed final sign-off Aug 2008 | 719 Clayton St | work @ unit# 719 only. bathroom remodel. new fixtures. vanity. paint & finishes throughout.Details
work @ unit# 719 only. bathroom remodel. new fixtures. vanity. paint & finishes throughout. | $7,000 |
| Aug 20, 2002 | Completed final sign-off Sep 2002 | 88 Lake Forest Ct | remodel exist bath to main floor. no change to floor plan.Details
remodel exist bath to main floor. no change to floor plan. | $5,000 |
| Jan 20, 2000 | Completed final sign-off Jun 2000 | 1610 09th Av | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $30,000 |