Bill Jang Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Dec 2016
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2016 | Completed final sign-off Mar 2017 | 2512 23rd Av | kitchen remodel: new cabinets, countertop, tiles. bathroom remodel: new fixtures, add toilet. for new toilet, provide a minimum 24"x3o"w clear floor space in front of toilet. no (n)wall & no (e)wall relocation. lighting in kitchen & bathroom remodel shall comply w/cec 150.0(k)3 & 150.0(k)5.Details
kitchen remodel: new cabinets, countertop, tiles. bathroom remodel: new fixtures, add toilet. for new toilet, provide a minimum 24"x3o"w clear floor space in front of toilet. no (n)wall & no (e)wall relocation. lighting in kitchen & bathroom remodel shall comply w/cec 150.0(k)3 & 150.0(k)5. | $30,000 |
| Feb 2, 2010 | Completed final sign-off Apr 2010 | 335 Grove St | to comply with his nov# 201032125, dated 01/26/2010. dry rot repair & stairs. less than 50%.Details
to comply with his nov# 201032125, dated 01/26/2010. dry rot repair & stairs. less than 50%. | $500 |
| Feb 2, 2010 | Expired or cancelled cancelled Jan 2026 | 335 Grove St | dry rot repair in rearDetails
dry rot repair in rear | $500 |
| Jan 22, 2010 | Completed final sign-off Mar 2010 | 174 Beaver St | bathroom remodel-new fixtures, new tile, new lights. note: work is @ 174 beaver street.Details
bathroom remodel-new fixtures, new tile, new lights. note: work is @ 174 beaver street. | $10,500 |
| Jun 15, 2009 | Completed final sign-off Sep 2009 | 1927 11th Av | bathroom remodel-new tile cabinets, lighting, vanity, tub/shower, toilet. provide fluorescent lights or "manual on" occupancy sensor per title 24 mandatory lighting measures.Details
bathroom remodel-new tile cabinets, lighting, vanity, tub/shower, toilet. provide fluorescent lights or "manual on" occupancy sensor per title 24 mandatory lighting measures. | $12,000 |
| Jun 25, 2008 | Completed final sign-off Aug 2008 | 719 Clayton St | work @ unit# 719 only. bathroom remodel. new fixtures. vanity. paint & finishes throughout.Details
work @ unit# 719 only. bathroom remodel. new fixtures. vanity. paint & finishes throughout. | $7,000 |
| May 3, 2006 | Completed final sign-off Jul 2006 | 2474 Fulton St | kitchen renovation new cabinets top fixtures 2 windows in kind all work in unit 2474 only (not visible from street)Details
kitchen renovation new cabinets top fixtures 2 windows in kind all work in unit 2474 only (not visible from street) | $25,000 |
| Feb 9, 2006 | Completed final sign-off May 2006 | 2478 Fulton St | kitchen renovation. new cabinets, flooring, replace in kind windows, appliances, countertops, lighting. no change to partitions. windows not visible from street.Details
kitchen renovation. new cabinets, flooring, replace in kind windows, appliances, countertops, lighting. no change to partitions. windows not visible from street. | $25,000 |
| Jan 3, 2005 | Completed final sign-off Feb 2005 | 263 14th Av | reface extg cbnts/new tile flr/back splash/change fixtures at 2n floorDetails
reface extg cbnts/new tile flr/back splash/change fixtures at 2n floor | $7,500 |
| Oct 20, 2004 | Completed final sign-off Mar 2007 | 717 Clayton St | to comply with physical inspection report (attched) #3r-4023 report, condo conversion.Details
to comply with physical inspection report (attched) #3r-4023 report, condo conversion. | $10,000 |
| Jan 13, 2003 | Completed final sign-off Apr 2003 | 33 Terrace Dr | 2 bathrms renovation. new tub/shower, vanites, tile floors. toilets, new wood windows same sizes. (bDetails
2 bathrms renovation. new tub/shower, vanites, tile floors. toilets, new wood windows same sizes. (b | $15,000 |
| Oct 4, 2002 | Completed final sign-off Dec 2002 | 33 Terrace Dr | kitchen remodel,new cabinets,counter tops,tile flrs,appliances,bathrm remodel,new sink,toilet tiles.Details
kitchen remodel,new cabinets,counter tops,tile flrs,appliances,bathrm remodel,new sink,toilet tiles. | $45,000 |
| Aug 20, 2002 | Completed final sign-off Sep 2002 | 88 Lake Forest Ct | remodel exist bath to main floor. no change to floor plan.Details
remodel exist bath to main floor. no change to floor plan. | $5,000 |
| Jan 20, 2000 | Completed final sign-off Jun 2000 | 1610 09th Av | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $30,000 |