Back to kitchen remodel contractors
Bigo Construction Inc.
- Based in
- Pittsburg
- On San Francisco permits
- Nov 2015 to Aug 2026
- Last 24 months
- 11 permits filed
30 permits since 2000: 22 completed, 5 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 294 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2026 | In progress issued Jul 2026 | 2412 Polk St | full kitchen & (2) bathroom remodel including paint and new flooring. one bathroom is bathtub to shower. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5.Details
full kitchen & (2) bathroom remodel including paint and new flooring. one bathroom is bathtub to shower. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5. | $95,000 |
| Jun 12, 2026 | Completed final sign-off Sep 2026 | 2225 23rd St | unit 205: paint entire condo, paint kitchen cabinets & replace countertops, kitchen sink & faucet, replace bathroom vanity countertop & faucet, like to like. replace all ceiling light fixtures (7)Details
unit 205: paint entire condo, paint kitchen cabinets & replace countertops, kitchen sink & faucet, replace bathroom vanity countertop & faucet, like to like. replace all ceiling light fixtures (7) | $20,000 |
| Dec 9, 2024 | Completed final sign-off Jul 2026 | 4427 17th St | 560 sq ft interior renovation: kitchen, 2 bathrooms, living room ceiling cosmetic upgrade, replacement of 2 patio doors (not visible).Details
560 sq ft interior renovation: kitchen, 2 bathrooms, living room ceiling cosmetic upgrade, replacement of 2 patio doors (not visible). | $90,000 |
| Aug 1, 2024 | Expired or cancelled expired Aug 2026 | 1939 43rd Av | kitchen & bathrooms remodeling no changes to existing plumbing & drain. replacing (2) bath tubs & shower valves. replacing existing waterheater to new electric tankless. electrical panel upgrade. no walls remove. no str. work.Details
kitchen & bathrooms remodeling no changes to existing plumbing & drain. replacing (2) bath tubs & shower valves. replacing existing waterheater to new electric tankless. electrical panel upgrade. no walls remove. no str. work. | $80,000 |
| Feb 5, 2024 | Completed final sign-off Apr 2024 | 26 Mizpah St | kitchen remodeling, replacing all kitchen cabinets, countertops sink, p-traps, (no changes on plumbing) adding all necessary electrial outlets. no wall alterationDetails
kitchen remodeling, replacing all kitchen cabinets, countertops sink, p-traps, (no changes on plumbing) adding all necessary electrial outlets. no wall alteration | $22,500 |
| Apr 25, 2023 | Completed final sign-off Dec 2023 | 2414 Polk St | apartment remodeling: (2) full bathrooms and kitchen paint and new flooring.Details
apartment remodeling: (2) full bathrooms and kitchen paint and new flooring. | $65,000 |
| Nov 23, 2022 | Completed final sign-off Feb 2025 | 511 35th Av | unit 513: kitchen renovation with layout change + minor partition wall adjustment. remodel (3) bathrooms. back stair tread replace in kind, less than 50%. replace roof decking material in kind. replace (e) flooringDetails
unit 513: kitchen renovation with layout change + minor partition wall adjustment. remodel (3) bathrooms. back stair tread replace in kind, less than 50%. replace roof decking material in kind. replace (e) flooring | $40,000 |
| Feb 14, 2019 | Completed final sign-off Dec 2020 | 1251 37th Av | revision to pa 2015-1116-2696 - relocation of laundry & powder room, kitchen & new sheer wall (add reinforcing to some walls. no exterior changes.Details
revision to pa 2015-1116-2696 - relocation of laundry & powder room, kitchen & new sheer wall (add reinforcing to some walls. no exterior changes. | $20,000 |