Block 6709, lot 005
26 Mizpah St
- City’s use
- Single Family Residential
- Built
- 1906
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 1,750 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 5, 2026 | In progress issued Jun 2026 | 26 Mizpah St | Lackey Construction Inc | revision to previously approved #202506068102 for minor changes to the foundation plan and some structural changes based on site conditionsDetails
revision to previously approved #202506068102 for minor changes to the foundation plan and some structural changes based on site conditions | |
| Jan 16, 2026 | In progress issued Jan 2026 | 26 Mizpah St | Lackey Construction Inc | revision to pa 202506068102 reverting location for windows 204b & 204c in bedroom 3 (204) and inserted within (e) opening; windows 204b & 204c will revert from 60 fire rated in operable outswing casement. no work at front or in prowDetails
revision to pa 202506068102 reverting location for windows 204b & 204c in bedroom 3 (204) and inserted within (e) opening; windows 204b & 204c will revert from 60 fire rated in operable outswing casement. no work at front or in prow | |
| Jun 23, 2025 | In progress issued Dec 2025 | 26 Mizpah St | Lackey Construction Inc | 310 sf horizontal addition at rear, new dormers, remodel throughout the three floors, electrical service upgrade.Details
310 sf horizontal addition at rear, new dormers, remodel throughout the three floors, electrical service upgrade. | $790,000 |
| Oct 26, 2024 | In progress issued Oct 2024 | 26 Mizpah St | Lackey Construction Inc | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $134,969 |
| Feb 5, 2024 | Completed final sign-off Apr 2024 | 26 Mizpah St | Bigo Construction Inc. | kitchen remodeling, replacing all kitchen cabinets, countertops sink, p-traps, (no changes on plumbing) adding all necessary electrial outlets. no wall alterationDetails
kitchen remodeling, replacing all kitchen cabinets, countertops sink, p-traps, (no changes on plumbing) adding all necessary electrial outlets. no wall alteration | $22,500 |
| Mar 22, 2011 | Never finaled issued Mar 2011, no final | 26 Mizpah St | San Francisco Window Pros Inc. | replace 8 wood windows with 8 milgard ulta woodclad series fiberglass windows. all like for like with the exception of one that is currently a casement-fixed-casement window that we are replacing with an x/0 sliderDetails
replace 8 wood windows with 8 milgard ulta woodclad series fiberglass windows. all like for like with the exception of one that is currently a casement-fixed-casement window that we are replacing with an x/0 slider | $7,000 |
| Jan 21, 2011 | Completed final sign-off Mar 2011 | 26 Mizpah St | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $13,200 |
| Aug 14, 2003 | Expired or cancelled expired Jan 2005 | 26 Mizpah St | Standardconstr/Standardroof | reroofingDetails
reroofing | $7,950 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Lackey Construction Inc (4), Bigo Construction Inc., San Francisco Window Pros Inc., Standardconstr/Standardroof, Tom Lee Roofing Inc.
- Architects
- Yianni Doulis (3)
- Engineers
- Adrianus Vermeulen, Eric Kreager, Eric Kreager
- Subcontractors
- Dewayne S. Allen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.