Eric Kreager
- License
- S3266
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S3266 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Jun 2026 to Jul 2026
2 permits since 2000 (engineer on 2 permits): 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Lackey Construction Inc
- Architects
- Brian Brown, Yianni Doulis
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 9, 2026 | In progress issued Jul 2026 | 1033 Dolores St | revision to pa#: 202605282096 to: remove and replace damaged subfloor in work area, lower (e) floor joist 12" at rear of permit work area, plus replace (e) piers and girders w/(n), replace 6x10 wood beam w/ new steel beam, minor modifications to permited shear wall lengths.Details
revision to pa#: 202605282096 to: remove and replace damaged subfloor in work area, lower (e) floor joist 12" at rear of permit work area, plus replace (e) piers and girders w/(n), replace 6x10 wood beam w/ new steel beam, minor modifications to permited shear wall lengths. | ||
| Jun 5, 2026 | In progress issued Jun 2026 | 26 Mizpah St | Lackey Construction Inc | revision to previously approved #202506068102 for minor changes to the foundation plan and some structural changes based on site conditionsDetails
revision to previously approved #202506068102 for minor changes to the foundation plan and some structural changes based on site conditions |