Yianni Doulis
- Listed as
- architect
- On San Francisco permits
- Jun 2025 to Jun 2026
3 permits since 2000 (architect on 3 permits): 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 5, 2026 | In progress issued Jun 2026 | 26 Mizpah St | Lackey Construction Inc | revision to previously approved #202506068102 for minor changes to the foundation plan and some structural changes based on site conditionsDetails
revision to previously approved #202506068102 for minor changes to the foundation plan and some structural changes based on site conditions | |
| Jan 16, 2026 | In progress issued Jan 2026 | 26 Mizpah St | Lackey Construction Inc | revision to pa 202506068102 reverting location for windows 204b & 204c in bedroom 3 (204) and inserted within (e) opening; windows 204b & 204c will revert from 60 fire rated in operable outswing casement. no work at front or in prowDetails
revision to pa 202506068102 reverting location for windows 204b & 204c in bedroom 3 (204) and inserted within (e) opening; windows 204b & 204c will revert from 60 fire rated in operable outswing casement. no work at front or in prow | |
| Jun 23, 2025 | In progress issued Dec 2025 | 26 Mizpah St | Lackey Construction Inc | 310 sf horizontal addition at rear, new dormers, remodel throughout the three floors, electrical service upgrade.Details
310 sf horizontal addition at rear, new dormers, remodel throughout the three floors, electrical service upgrade. | $790,000 |