Back to bathroom remodel contractors
Bigo Construction Inc.
- Based in
- Pittsburg
- On San Francisco permits
- Nov 2015 to Aug 2026
- Last 24 months
- 11 permits filed
30 permits since 2000: 22 completed, 5 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 9 completed, 3 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 58 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2026 | In progress issued Aug 2026 | 2225 23rd St | unit #205: rebuild bathroom due upper unit water leak. replace plastic surrounding shower wall & tub. replace shower valve & trim. repair sheetrock at walls & ceiling as needed. repair in-kind.Details
unit #205: rebuild bathroom due upper unit water leak. replace plastic surrounding shower wall & tub. replace shower valve & trim. repair sheetrock at walls & ceiling as needed. repair in-kind. | $6,000 |
| Jul 29, 2026 | In progress issued Jul 2026 | 2412 Polk St | full kitchen & (2) bathroom remodel including paint and new flooring. one bathroom is bathtub to shower. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5.Details
full kitchen & (2) bathroom remodel including paint and new flooring. one bathroom is bathtub to shower. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5. | $95,000 |
| Jun 12, 2026 | Completed final sign-off Sep 2026 | 2225 23rd St | unit 205: paint entire condo, paint kitchen cabinets & replace countertops, kitchen sink & faucet, replace bathroom vanity countertop & faucet, like to like. replace all ceiling light fixtures (7)Details
unit 205: paint entire condo, paint kitchen cabinets & replace countertops, kitchen sink & faucet, replace bathroom vanity countertop & faucet, like to like. replace all ceiling light fixtures (7) | $20,000 |
| Mar 3, 2025 | In progress issued Mar 2025 | 175 Bluxome St | drywalll repairs due toi water leak at 2 bathrooms. redo bathrooms, floor tile, reinstall existing vanilties and toilets in current locations, no change to to layout.Details
drywalll repairs due toi water leak at 2 bathrooms. redo bathrooms, floor tile, reinstall existing vanilties and toilets in current locations, no change to to layout. | $8,500 |
| Feb 7, 2025 | Completed final sign-off Feb 2025 | 175 Bluxome St | #229: drywall water damage repairs at entryway, bathroom, and mezzanine ceiling, renail baseboard and paint to comply nov #202432361Details
#229: drywall water damage repairs at entryway, bathroom, and mezzanine ceiling, renail baseboard and paint to comply nov #202432361 | $2,500 |
| Dec 9, 2024 | Completed final sign-off Jul 2026 | 4427 17th St | 560 sq ft interior renovation: kitchen, 2 bathrooms, living room ceiling cosmetic upgrade, replacement of 2 patio doors (not visible).Details
560 sq ft interior renovation: kitchen, 2 bathrooms, living room ceiling cosmetic upgrade, replacement of 2 patio doors (not visible). | $90,000 |
| Aug 1, 2024 | Expired or cancelled expired Aug 2026 | 1939 43rd Av | kitchen & bathrooms remodeling no changes to existing plumbing & drain. replacing (2) bath tubs & shower valves. replacing existing waterheater to new electric tankless. electrical panel upgrade. no walls remove. no str. work.Details
kitchen & bathrooms remodeling no changes to existing plumbing & drain. replacing (2) bath tubs & shower valves. replacing existing waterheater to new electric tankless. electrical panel upgrade. no walls remove. no str. work. | $80,000 |
| Jul 10, 2024 | Completed final sign-off Sep 2024 | 2001 Mcallister St | apt 322: remodel bathroom. r/r tub, showever valve & trim, toilet, vanity/sink/faucet. replace vanity light, replace floor & wall tiles.Details
apt 322: remodel bathroom. r/r tub, showever valve & trim, toilet, vanity/sink/faucet. replace vanity light, replace floor & wall tiles. | $15,000 |
| Apr 25, 2023 | Completed final sign-off Dec 2023 | 2414 Polk St | apartment remodeling: (2) full bathrooms and kitchen paint and new flooring.Details
apartment remodeling: (2) full bathrooms and kitchen paint and new flooring. | $65,000 |
| Feb 27, 2023 | Completed final sign-off Mar 2023 | 2001 Mcallister St | #111: to comply with complaint# 202303148: reconstruction of master bathroom and closet due to water flood. replace shower pan and shower valve. replace shower enclosure tile, install new sheetrock where is needed. replace vanity light.Details
#111: to comply with complaint# 202303148: reconstruction of master bathroom and closet due to water flood. replace shower pan and shower valve. replace shower enclosure tile, install new sheetrock where is needed. replace vanity light. | $13,000 |
| Nov 23, 2022 | Completed final sign-off Feb 2025 | 511 35th Av | unit 513: kitchen renovation with layout change + minor partition wall adjustment. remodel (3) bathrooms. back stair tread replace in kind, less than 50%. replace roof decking material in kind. replace (e) flooringDetails
unit 513: kitchen renovation with layout change + minor partition wall adjustment. remodel (3) bathrooms. back stair tread replace in kind, less than 50%. replace roof decking material in kind. replace (e) flooring | $40,000 |
| Sep 22, 2022 | Completed final sign-off Nov 2022 | 2001 Mcallister St | bathroom remodeling remove (e) tub, convert to shower, replace all tile, wall and floor, replace shower valve to use same drain & same plumbingDetails
bathroom remodeling remove (e) tub, convert to shower, replace all tile, wall and floor, replace shower valve to use same drain & same plumbing | $20,000 |
| Aug 25, 2022 | Completed final sign-off Oct 2022 | 2001 Mcallister St | apt 109: remodel bathroom: r/r bathroom walls, floor, tile, tub & shower head fixtures. remove tub door.Details
apt 109: remodel bathroom: r/r bathroom walls, floor, tile, tub & shower head fixtures. remove tub door. | $5,500 |