Big Boys Construction Inc.
- Based in
- Livermore
- On San Francisco permits
- May 2011 to Aug 2025
- Last 24 months
- 2 permits filed
16 permits since 2000: 13 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 in progress. Typically 161 days from filing to permit and 306 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2025 | In progress issued May 2025 | 3020 20th Av | g/f: a new bedroom and bathroom - new conditioned space taken from (e) garage. (2) new french doors at the front elevation with concrete stoops & stairs <30" above (e) grade. a remodeled kitchen and bathroom on 2nd story. new skylights, windows and french doors will be added.Details
g/f: a new bedroom and bathroom - new conditioned space taken from (e) garage. (2) new french doors at the front elevation with concrete stoops & stairs <30" above (e) grade. a remodeled kitchen and bathroom on 2nd story. new skylights, windows and french doors will be added. | $195,000 |
| May 1, 2018 | Completed final sign-off Sep 2019 | 1612 Castro St | replace existing front stair at entryDetails
replace existing front stair at entry | $8,000 |
| Dec 19, 2013 | Completed final sign-off Apr 2015 | 120 Quintara St | proposed bedroom & exercise room & new staircase @ lower level. structural reinforcement. typical removal of (e) concrete slab & laundry room.Details
proposed bedroom & exercise room & new staircase @ lower level. structural reinforcement. typical removal of (e) concrete slab & laundry room. | $93,600 |