Back to kitchen remodel contractors
Big Boys Construction Inc.
- Based in
- Livermore
- On San Francisco permits
- May 2011 to Aug 2025
- Last 24 months
- 2 permits filed
16 permits since 2000: 13 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 in progress. Typically 8 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2025 | In progress issued May 2025 | 3020 20th Av | g/f: a new bedroom and bathroom - new conditioned space taken from (e) garage. (2) new french doors at the front elevation with concrete stoops & stairs <30" above (e) grade. a remodeled kitchen and bathroom on 2nd story. new skylights, windows and french doors will be added.Details
g/f: a new bedroom and bathroom - new conditioned space taken from (e) garage. (2) new french doors at the front elevation with concrete stoops & stairs <30" above (e) grade. a remodeled kitchen and bathroom on 2nd story. new skylights, windows and french doors will be added. | $195,000 |
| May 30, 2013 | Completed final sign-off Oct 2013 | 1859 33rd Av | kitchen remodel repl of counters and counter tops, repl a window kitchen, install electrical, bathroom remodel, replacement of tile & fixture, (no structural changes) window not visible from street u factor 0.4 maxDetails
kitchen remodel repl of counters and counter tops, repl a window kitchen, install electrical, bathroom remodel, replacement of tile & fixture, (no structural changes) window not visible from street u factor 0.4 max | $24,750 |
| May 23, 2011 | Completed final sign-off Nov 2011 | 45 Digby St | remodel of 3 existing bathrooms and existing kitchenDetails
remodel of 3 existing bathrooms and existing kitchen | $40,000 |