Big Boys Construction Inc.
- Based in
- Livermore
- On San Francisco permits
- May 2011 to Aug 2025
- Last 24 months
- 2 permits filed
16 permits since 2000: 13 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 in progress. Typically 0 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2025 | In progress issued May 2025 | 3020 20th Av | g/f: a new bedroom and bathroom - new conditioned space taken from (e) garage. (2) new french doors at the front elevation with concrete stoops & stairs <30" above (e) grade. a remodeled kitchen and bathroom on 2nd story. new skylights, windows and french doors will be added.Details
g/f: a new bedroom and bathroom - new conditioned space taken from (e) garage. (2) new french doors at the front elevation with concrete stoops & stairs <30" above (e) grade. a remodeled kitchen and bathroom on 2nd story. new skylights, windows and french doors will be added. | $195,000 |
| May 14, 2019 | Completed final sign-off Jun 2019 | 656 Elizabeth St | at (e) rooms we are adding a 2 bathrooms (his & hers) and a closet note: all work to be interior onlyDetails
at (e) rooms we are adding a 2 bathrooms (his & hers) and a closet note: all work to be interior only | $25,000 |
| Apr 11, 2016 | Completed final sign-off May 2016 | 1859 33rd Av | interior home improvement, 2/f- add hallway to create one bedroom, garage level- add a wall in playroom to make an office, legalize bathroom.Details
interior home improvement, 2/f- add hallway to create one bedroom, garage level- add a wall in playroom to make an office, legalize bathroom. | $8,750 |
| Dec 4, 2014 | Completed final sign-off Jun 2015 | 861 Vermont St | upstairs bathroom remodl - replace shower, tub, floor, vanity, camode, & fan. remove & install new tile.Details
upstairs bathroom remodl - replace shower, tub, floor, vanity, camode, & fan. remove & install new tile. | $18,000 |
| May 30, 2013 | Completed final sign-off Oct 2013 | 1859 33rd Av | kitchen remodel repl of counters and counter tops, repl a window kitchen, install electrical, bathroom remodel, replacement of tile & fixture, (no structural changes) window not visible from street u factor 0.4 maxDetails
kitchen remodel repl of counters and counter tops, repl a window kitchen, install electrical, bathroom remodel, replacement of tile & fixture, (no structural changes) window not visible from street u factor 0.4 max | $24,750 |
| Jun 10, 2011 | Completed final sign-off Aug 2011 | 1859 33rd Av | remodel 1 bath - remove old and replace with new. lighting to comply with cel 150 (k), replace in kind 4 windows at rear not visible from street. max. u factor .40. no change wall & exterior door.Details
remodel 1 bath - remove old and replace with new. lighting to comply with cel 150 (k), replace in kind 4 windows at rear not visible from street. max. u factor .40. no change wall & exterior door. | $9,000 |
| May 23, 2011 | Completed final sign-off Nov 2011 | 45 Digby St | remodel of 3 existing bathrooms and existing kitchenDetails
remodel of 3 existing bathrooms and existing kitchen | $40,000 |