Bergquist Builders
- Based in
- San Anselmo
- On San Francisco permits
- Jan 2005 to May 2026
- Last 24 months
- 13 permits filed
109 permits since 2000: 91 completed, 5 in progress, 4 never finaled, 9 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
13 stairs permits: 9 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 15 days from filing to permit and 371 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2025 | In progress issued Jan 2026 | 229 Granville Wy | modification to 202505126238 to eliminate the previously approved rear yard deck and stairs, construct new foundation at room 001 to accommodate existing field conditions, construct ground/lower floor shower and bathroom.Details
modification to 202505126238 to eliminate the previously approved rear yard deck and stairs, construct new foundation at room 001 to accommodate existing field conditions, construct ground/lower floor shower and bathroom. | $20,000 |
| Sep 5, 2025 | Completed final sign-off May 2026 | 225 Vasquez Av | addendum to prev permit 201706018092 & 202002033372. revision of interior stair from center stringer to cantilevered treads at upper level. new access required for pge electrical meter located on east side of house. concrete planter altered to include steps.Details
addendum to prev permit 201706018092 & 202002033372. revision of interior stair from center stringer to cantilevered treads at upper level. new access required for pge electrical meter located on east side of house. concrete planter altered to include steps. | $20,000 |
| May 12, 2025 | In progress issued Oct 2025 | 229 Granville Wy | renovation of an (e) 2 story single family. no change to (e) envelope. new interior walls, finishes & ceiling. new windows, fixtures and skylights - interior stair and new openings.Details
renovation of an (e) 2 story single family. no change to (e) envelope. new interior walls, finishes & ceiling. new windows, fixtures and skylights - interior stair and new openings. | $335,000 |
| Dec 16, 2024 | Expired or cancelled expired May 2026 | 225 Vasquez Av | revision to permit 201706018092-s2. new closet in hallway. revision to structural framing at shower, stair, and hall.Details
revision to permit 201706018092-s2. new closet in hallway. revision to structural framing at shower, stair, and hall. | |
| Aug 28, 2019 | Completed final sign-off Aug 2021 | 91 Commonwealth Av | modification to 201907176106 new voluntary seismic stregthening. changes to the design of rear yard stair. modify 2 rear yard facing windows. removal of (e) ext trellis above garage. minor int partitions. electric radiant in bathroomsDetails
modification to 201907176106 new voluntary seismic stregthening. changes to the design of rear yard stair. modify 2 rear yard facing windows. removal of (e) ext trellis above garage. minor int partitions. electric radiant in bathrooms | $5,000 |
| Jul 17, 2019 | Completed final sign-off Aug 2021 | 91 Commonwealth Av | changes to interior partitions, a new interior stair, removal of an (e) rear yard stair, new stair to rear yard, removal of (e) blown air heating system, installation of new radiant floor heating system, relocation of electrical meter, removal of (e) tanked water heater, installation of new tanklessDetails
changes to interior partitions, a new interior stair, removal of an (e) rear yard stair, new stair to rear yard, removal of (e) blown air heating system, installation of new radiant floor heating system, relocation of electrical meter, removal of (e) tanked water heater, installation of new tankless | $550,000 |
| Jun 26, 2019 | Completed final sign-off Aug 2021 | 91 Commonwealth Av | demolition of an exgt deck & stairs @ level one: addition of gaurdrail at termination of extg first floor deck. second floor stairs to remain.Details
demolition of an exgt deck & stairs @ level one: addition of gaurdrail at termination of extg first floor deck. second floor stairs to remain. | $1,000 |
| Mar 19, 2018 | Never finaled issued Jun 2019, no final | 1522 Lake St | convert attic on upper lvl into habitable space. demolish portion of lvl 3 flr to be lowered. reconstruct flr @ lower elevation, demolish portion of roof. reconstruct roof @ a higher elevation, relocate stairs & (n) windows. (n) deck.Details
convert attic on upper lvl into habitable space. demolish portion of lvl 3 flr to be lowered. reconstruct flr @ lower elevation, demolish portion of roof. reconstruct roof @ a higher elevation, relocate stairs & (n) windows. (n) deck. | $200,000 |
| Apr 23, 2014 | Completed final sign-off Feb 2015 | 111 27th Av | remodel including 135 sq ft of infill addition at extg garage, rebuild extg stairs at 1st and 2nd floors, remodel master bedroom and bath, reconfigure bedroom closet, and remodel 4th floor bedroom, and bathroom. new doors at rear yard ground level and new windows at rear stairwell.Details
remodel including 135 sq ft of infill addition at extg garage, rebuild extg stairs at 1st and 2nd floors, remodel master bedroom and bath, reconfigure bedroom closet, and remodel 4th floor bedroom, and bathroom. new doors at rear yard ground level and new windows at rear stairwell. | $120,000 |
| Feb 6, 2013 | Completed final sign-off Sep 2016 | 133 17th Av | 1 & 2 story addition at rear for new family room at 1st fl. bedroom at 2nd fl. remodel kitchen, new powder room, new master bath. new exterior stair to basement.Details
1 & 2 story addition at rear for new family room at 1st fl. bedroom at 2nd fl. remodel kitchen, new powder room, new master bath. new exterior stair to basement. | $235,000 |
| Aug 26, 2010 | Completed final sign-off Nov 2011 | 2615 Union St | unit #2615: 1st flr-absorb relocated unit #2617 into unit. reconstruct front exterior stair. reconfigure interior stair, kitchen & family rm. 2nd flr - reconfigure int stair to 3rd flr. 3rd flr cutback top story to create roof deck. reconfigure bathrm. unit #2617 relcoated with pa# 2010/08/02/7892.Details
unit #2615: 1st flr-absorb relocated unit #2617 into unit. reconstruct front exterior stair. reconfigure interior stair, kitchen & family rm. 2nd flr - reconfigure int stair to 3rd flr. 3rd flr cutback top story to create roof deck. reconfigure bathrm. unit #2617 relcoated with pa# 2010/08/02/7892. | $200,000 |
| Jun 5, 2007 | Completed final sign-off Jun 2007 | 45 Adair St | stair repair in kind at side.Details
stair repair in kind at side. | $5,000 |
| Jun 6, 2006 | Completed final sign-off Sep 2006 | 155 Graystone Tr | remodel 2 door openings, 2 headers, drywall, flooring, paint. 1 strong back (work in living room & stair area).Details
remodel 2 door openings, 2 headers, drywall, flooring, paint. 1 strong back (work in living room & stair area). | $30,000 |