Back to bathroom remodel contractors
Bergquist Builders
- Based in
- San Anselmo
- On San Francisco permits
- Jan 2005 to May 2026
- Last 24 months
- 13 permits filed
109 permits since 2000: 91 completed, 5 in progress, 4 never finaled, 9 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
38 bathroom remodel permits: 30 completed, 2 in progress, 2 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2026 | In progress issued Jan 2026 | 1834 Gough St | struct. and arch. revision to p/a 202505055790 including lowering of the first floor level by about 12 inches, construct new foundation/slab/footings and stem wall, remodel/reconfigure 1st floor laundry room and bathroom, install new door system in existing 2nd floor opening at rear of bldg.Details
struct. and arch. revision to p/a 202505055790 including lowering of the first floor level by about 12 inches, construct new foundation/slab/footings and stem wall, remodel/reconfigure 1st floor laundry room and bathroom, install new door system in existing 2nd floor opening at rear of bldg. | $52,000 |
| Dec 29, 2025 | In progress issued Jan 2026 | 229 Granville Wy | modification to 202505126238 to eliminate the previously approved rear yard deck and stairs, construct new foundation at room 001 to accommodate existing field conditions, construct ground/lower floor shower and bathroom.Details
modification to 202505126238 to eliminate the previously approved rear yard deck and stairs, construct new foundation at room 001 to accommodate existing field conditions, construct ground/lower floor shower and bathroom. | $20,000 |
| Dec 22, 2025 | Expired or cancelled withdrawn Dec 2025 | 1834 Gough St | revision to permit 202505055790. lowering of the basement floor levl with new footing and stem wall. basement laundry room and bathroom remodel.Details
revision to permit 202505055790. lowering of the basement floor levl with new footing and stem wall. basement laundry room and bathroom remodel. | $38,000 |
| Jul 31, 2023 | Never finaled issued Aug 2023, no final | 1 Loma Vista Tr | revision to pa# 202212017478. basement: create habitable area with rec room & bath. floor 1: alternate fireplace location. floor 2: delete 1 proposed window. replace (e) wood windows in-like kind & operation (wood).Details
revision to pa# 202212017478. basement: create habitable area with rec room & bath. floor 1: alternate fireplace location. floor 2: delete 1 proposed window. replace (e) wood windows in-like kind & operation (wood). | $125,000 |
| Dec 1, 2022 | Never finaled issued Dec 2022, no final | 1 Loma Vista Tr | 1st fl: remodel kitchen, living, dining. create powder room. new doors to (e) deck. add gas fire place. 2nd fl: remodel (e) bathroom. create 2nd bath & utility room.Details
1st fl: remodel kitchen, living, dining. create powder room. new doors to (e) deck. add gas fire place. 2nd fl: remodel (e) bathroom. create 2nd bath & utility room. | $160,000 |
| May 25, 2021 | Completed final sign-off Oct 2022 | 107 Upper Tr | rev to pa 2019-1120-7777: renovating master bathroom, replacing doors 7 new windows at rear. replace rear deck.Details
rev to pa 2019-1120-7777: renovating master bathroom, replacing doors 7 new windows at rear. replace rear deck. | $150,000 |
| Mar 23, 2021 | Completed final sign-off Jun 2022 | 1201 05th Av | unit #1207: remodel extg bathroom, add new bathroom, add closets, remove some interior walls and where demolished walls are load bearing, add structural support.Details
unit #1207: remodel extg bathroom, add new bathroom, add closets, remove some interior walls and where demolished walls are load bearing, add structural support. | $100,000 |
| Mar 15, 2021 | Completed final sign-off Oct 2022 | 1251 Vallejo St | revision to pa# 201803123380. work remove from original pa. not rebuilding roof area or adding skylight or removing walls on 3ed fl, or replacing windows on facade. work retained: add beam at garage level. remove & replace bathrooms & kitchens on 2nd & 3rd fl. replace windows on side & rear.Details
revision to pa# 201803123380. work remove from original pa. not rebuilding roof area or adding skylight or removing walls on 3ed fl, or replacing windows on facade. work retained: add beam at garage level. remove & replace bathrooms & kitchens on 2nd & 3rd fl. replace windows on side & rear. | $200,000 |
| Mar 8, 2021 | Expired or cancelled withdrawn Apr 2021 | 1201 05th Av | unit 1207 - existing walls to be removed, kithcne to be redone with new appliacne and sink location, remodel (e) bath and add 1 additional bathroom.Details
unit 1207 - existing walls to be removed, kithcne to be redone with new appliacne and sink location, remodel (e) bath and add 1 additional bathroom. | $100,000 |
| Dec 10, 2020 | Completed final sign-off Jun 2021 | 1249 Vallejo St | rear structure - in-kind bathroom remodel with no change to floor plan or walls. remove & replace vanity, sinks, & faucets, shower & tub controls, all floor & wall tile. existing tub & toilet to remain.Details
rear structure - in-kind bathroom remodel with no change to floor plan or walls. remove & replace vanity, sinks, & faucets, shower & tub controls, all floor & wall tile. existing tub & toilet to remain. | $30,000 |
| Feb 28, 2020 | Completed final sign-off Aug 2021 | 91 Commonwealth Av | replace kitchen cabinets, appliance & plumbing remain in extg locations. new electrical. remodel master bath. voluntary strengthening of west kitchen wall. plumbing counts remain same.Details
replace kitchen cabinets, appliance & plumbing remain in extg locations. new electrical. remodel master bath. voluntary strengthening of west kitchen wall. plumbing counts remain same. | $100,000 |
| Aug 28, 2019 | Completed final sign-off Aug 2021 | 91 Commonwealth Av | modification to 201907176106 new voluntary seismic stregthening. changes to the design of rear yard stair. modify 2 rear yard facing windows. removal of (e) ext trellis above garage. minor int partitions. electric radiant in bathroomsDetails
modification to 201907176106 new voluntary seismic stregthening. changes to the design of rear yard stair. modify 2 rear yard facing windows. removal of (e) ext trellis above garage. minor int partitions. electric radiant in bathrooms | $5,000 |
| Oct 14, 2016 | Completed final sign-off Feb 2017 | 122 Palm Av | bath remodel: toi;let, sink, shower, replace in all in-kindDetails
bath remodel: toi;let, sink, shower, replace in all in-kind | $20,000 |
| Oct 2, 2015 | Completed final sign-off Sep 2016 | 133 17th Av | new master bath & closet addition @ rear of 2nd floor on (e) roof deck. add roof to (e) deck.Details
new master bath & closet addition @ rear of 2nd floor on (e) roof deck. add roof to (e) deck. | $36,000 |
| Jul 28, 2015 | Completed final sign-off Sep 2016 | 133 17th Av | revision to 201302069626. foundation and framing changes to original plans. 2nd fl bath, toilet room layout change. delete windows at family room south wallDetails
revision to 201302069626. foundation and framing changes to original plans. 2nd fl bath, toilet room layout change. delete windows at family room south wall | $500 |
| Jun 8, 2015 | Completed final sign-off Mar 2016 | 550 Davis St | kitchen & bath remodel, new hardwood floors, new lighting, paint. all work in-kind. n/a for maher.Details
kitchen & bath remodel, new hardwood floors, new lighting, paint. all work in-kind. n/a for maher. | $100,000 |
| Apr 23, 2014 | Completed final sign-off Feb 2015 | 111 27th Av | remodel including 135 sq ft of infill addition at extg garage, rebuild extg stairs at 1st and 2nd floors, remodel master bedroom and bath, reconfigure bedroom closet, and remodel 4th floor bedroom, and bathroom. new doors at rear yard ground level and new windows at rear stairwell.Details
remodel including 135 sq ft of infill addition at extg garage, rebuild extg stairs at 1st and 2nd floors, remodel master bedroom and bath, reconfigure bedroom closet, and remodel 4th floor bedroom, and bathroom. new doors at rear yard ground level and new windows at rear stairwell. | $120,000 |
| Jun 18, 2013 | Completed final sign-off Dec 2013 | 2430 Broadway | remodel master bathroom and master closet add washer dryer; interior work only, demolish 2nd bathroom @ master bedrm @ closetDetails
remodel master bathroom and master closet add washer dryer; interior work only, demolish 2nd bathroom @ master bedrm @ closet | $16,000 |
| Feb 6, 2013 | Completed final sign-off Sep 2016 | 133 17th Av | 1 & 2 story addition at rear for new family room at 1st fl. bedroom at 2nd fl. remodel kitchen, new powder room, new master bath. new exterior stair to basement.Details
1 & 2 story addition at rear for new family room at 1st fl. bedroom at 2nd fl. remodel kitchen, new powder room, new master bath. new exterior stair to basement. | $235,000 |
| Oct 7, 2011 | Completed final sign-off Sep 2012 | 2114 Baker St | unit 3 only, 2nd and 3rd fl. floor 2: remodel kitchen and powder room, provide 5/4" ipe over e 1 hr deck/roof assembly. floor 3: convert bedroom to master bath. remodel bath, convert bathroom to utility room. remodel master bedroom. add new gas fire place per listings.Details
unit 3 only, 2nd and 3rd fl. floor 2: remodel kitchen and powder room, provide 5/4" ipe over e 1 hr deck/roof assembly. floor 3: convert bedroom to master bath. remodel bath, convert bathroom to utility room. remodel master bedroom. add new gas fire place per listings. | $52,000 |
| Aug 9, 2011 | Completed final sign-off Oct 2011 | 650 Delancey St | kitchen remodel: replace in kind cabinets, counters, appliances. bath remodel: replace in kind vanity, tile floor, counter tops. no structural or plans, no new floor plans. no door, window, walls or ceiling on this permit.Details
kitchen remodel: replace in kind cabinets, counters, appliances. bath remodel: replace in kind vanity, tile floor, counter tops. no structural or plans, no new floor plans. no door, window, walls or ceiling on this permit. | $20,000 |
| Nov 29, 2010 | Completed final sign-off Jun 2011 | 2632 Laguna St | provide dwgs. to clarify scope of work under app#201009070308 as requested by inspector. original scope of work: remodel kit., entry, w/d, pwdr. rm, 2-baths, paint, hardwd. provide high efficiency lights/dimmer per cec 150. no struct. provide exhaust fan vento to exterior.Details
provide dwgs. to clarify scope of work under app#201009070308 as requested by inspector. original scope of work: remodel kit., entry, w/d, pwdr. rm, 2-baths, paint, hardwd. provide high efficiency lights/dimmer per cec 150. no struct. provide exhaust fan vento to exterior. | |
| Sep 7, 2010 | Completed final sign-off Jun 2011 | 2632 Laguna St | remodel: kitchen, pantry, w/d, powder room, 2 baths, paint, hardwood. provide high efficency lights/sensor/dimmer per cec150(k), no structural, provide exhaust fan venting to exterior.Details
remodel: kitchen, pantry, w/d, powder room, 2 baths, paint, hardwood. provide high efficency lights/sensor/dimmer per cec150(k), no structural, provide exhaust fan venting to exterior. | $110,000 |
| Aug 2, 2010 | Completed final sign-off Nov 2011 | 2615 Union St | lower (e) 7'-6" basement floor for 8'-6" head height. full seismic upgrade for lower level. relocate unit 2617 from floor "1" to basement level. create (1) bath and (1) bedroom unit. replace (e) garage door with (3) windows. work in unit 2615 under seperate permit.Details
lower (e) 7'-6" basement floor for 8'-6" head height. full seismic upgrade for lower level. relocate unit 2617 from floor "1" to basement level. create (1) bath and (1) bedroom unit. replace (e) garage door with (3) windows. work in unit 2615 under seperate permit. | $80,000 |
| May 3, 2010 | Completed final sign-off Aug 2010 | 1522 Lake St | remove wall at kitchen (2nd floor) & provide new steel beam, columns and footings. remodel bathroom at 4th floor (top)Details
remove wall at kitchen (2nd floor) & provide new steel beam, columns and footings. remodel bathroom at 4th floor (top) | $15,000 |
| Feb 1, 2010 | Completed final sign-off Aug 2010 | 1522 Lake St | remodel bath & kitchen in kind: cabients, appliances, coutners, paint @ kitchen & vanity, toielt @ powder room on 2nd floor; vanity & toilet @ master bath & vanity, tub, toilet @ guest bath on 3rd floor.Details
remodel bath & kitchen in kind: cabients, appliances, coutners, paint @ kitchen & vanity, toielt @ powder room on 2nd floor; vanity & toilet @ master bath & vanity, tub, toilet @ guest bath on 3rd floor. | $80,000 |
| Dec 9, 2008 | Completed final sign-off Jul 2009 | 318 Spear St | kitchen remodel:new cabs, counters, flooring, plmg, elec, platform floor. 3 bathrooms:new tile floor, vanity, access, waynes coating. general: change all interior doors. base shoe, opening thru partition. demo: kitchen cabs, counters, bath flooring.Details
kitchen remodel:new cabs, counters, flooring, plmg, elec, platform floor. 3 bathrooms:new tile floor, vanity, access, waynes coating. general: change all interior doors. base shoe, opening thru partition. demo: kitchen cabs, counters, bath flooring. | $110,000 |
| Jul 22, 2008 | Expired or cancelled expired Apr 2010 | 79 Divisadero St | bathroom remodel. replace as is toilet, shower, vanity and tile. provide exhaust fan. provide fluorescent light or manual on occupancy sensor.Details
bathroom remodel. replace as is toilet, shower, vanity and tile. provide exhaust fan. provide fluorescent light or manual on occupancy sensor. | $20,000 |
| Mar 3, 2008 | Completed final sign-off Jul 2008 | 45 Adair St | kitchen remodel: cabs, counters, plumbing, flooring, appliances. bath remodel: flooring, tile walls, toilets, vanities. general work:painting and carpetDetails
kitchen remodel: cabs, counters, plumbing, flooring, appliances. bath remodel: flooring, tile walls, toilets, vanities. general work:painting and carpet | $20,000 |
| Mar 3, 2008 | Completed final sign-off Jul 2008 | 45 Adair St | work @ unit# a only. kitchen remodel. cabinets, counters, plumbing, flooring, appliances. bath remodels: flooring, tile, toilets, vanities. general work: paint, carpet.Details
work @ unit# a only. kitchen remodel. cabinets, counters, plumbing, flooring, appliances. bath remodels: flooring, tile, toilets, vanities. general work: paint, carpet. | $20,000 |
| Mar 3, 2008 | Completed final sign-off Jun 2008 | 37 Adair St | work @ upper flat only. kitchen remodel. cabinets, counters, plumbing, electrical, appliances, flooring. bath remodels: flooring, tile wall, toilets, vanities. general work: paint, hardwood, carpet.Details
work @ upper flat only. kitchen remodel. cabinets, counters, plumbing, electrical, appliances, flooring. bath remodels: flooring, tile wall, toilets, vanities. general work: paint, hardwood, carpet. | $20,000 |
| Mar 3, 2008 | Completed final sign-off Jul 2008 | 45 Adair St | work @ unit# c only. kitchen remodel. cabinets, counters, plumbing, flooring, appliances. bath remodels: flooring, tile wall, toilets, vanities. general work: paint, carpet.Details
work @ unit# c only. kitchen remodel. cabinets, counters, plumbing, flooring, appliances. bath remodels: flooring, tile wall, toilets, vanities. general work: paint, carpet. | $20,000 |
| May 1, 2007 | Completed final sign-off Sep 2007 | 1854 Vallejo St | revision: add one power room and one full bath. floors, vanity, shower, plumbing & electrical, frame & drywall.Details
revision: add one power room and one full bath. floors, vanity, shower, plumbing & electrical, frame & drywall. | $15,000 |
| Apr 6, 2007 | Completed final sign-off Sep 2007 | 1854 Vallejo St | 1 kit remodel: cab, floor, plumb, electrical, 50% of kitchen watts shall be blurescent, 2 bathr remodel + cab, floor, plumbing, electrical,, hard wood floor refinishing and paint throughout flurescent lights or o.s. in bathroom.Details
1 kit remodel: cab, floor, plumb, electrical, 50% of kitchen watts shall be blurescent, 2 bathr remodel + cab, floor, plumbing, electrical,, hard wood floor refinishing and paint throughout flurescent lights or o.s. in bathroom. | $20,000 |
| Apr 6, 2007 | Completed final sign-off Aug 2007 | 1262 Lombard St | 12 bath remodel: cabs, flooring, tubs, shower, electric paint replace two small leaks doors with two pocket doors where and as shown on the plans. priviat florescent lights or o.s. in bathrooms.Details
12 bath remodel: cabs, flooring, tubs, shower, electric paint replace two small leaks doors with two pocket doors where and as shown on the plans. priviat florescent lights or o.s. in bathrooms. | $50,000 |
| Sep 19, 2006 | Completed final sign-off Jan 2007 | 601 Van Ness Av | unit #942-bath remodel: tile shower floors, install new vanity and shower doors. non structural work in unit #942.Details
unit #942-bath remodel: tile shower floors, install new vanity and shower doors. non structural work in unit #942. | $10,000 |
| Jun 6, 2006 | Completed final sign-off Nov 2006 | 1255 California St | remodel 2 bathrooms: demo, framing, plumbing, electrical, tile, cabinetry. install hardwood floor @ 2 bedrooms.Details
remodel 2 bathrooms: demo, framing, plumbing, electrical, tile, cabinetry. install hardwood floor @ 2 bedrooms. | $15,000 |
| Mar 30, 2005 | Expired or cancelled expired Mar 2006 | 650 02nd St | renew existing permit app 200403299897- new contractor- (kitchen & bath remodel)Details
renew existing permit app 200403299897- new contractor- (kitchen & bath remodel) | $12,000 |