Bergquist Builders
- Based in
- San Anselmo
- On San Francisco permits
- Jan 2005 to May 2026
- Last 24 months
- 13 permits filed
109 permits since 2000: 91 completed, 5 in progress, 4 never finaled, 9 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
11 deck permits: 8 completed, 1 in progress, 2 never finaled. Typically 11 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2025 | In progress issued Jan 2026 | 229 Granville Wy | modification to 202505126238 to eliminate the previously approved rear yard deck and stairs, construct new foundation at room 001 to accommodate existing field conditions, construct ground/lower floor shower and bathroom.Details
modification to 202505126238 to eliminate the previously approved rear yard deck and stairs, construct new foundation at room 001 to accommodate existing field conditions, construct ground/lower floor shower and bathroom. | $20,000 |
| Dec 1, 2022 | Never finaled issued Dec 2022, no final | 1 Loma Vista Tr | 1st fl: remodel kitchen, living, dining. create powder room. new doors to (e) deck. add gas fire place. 2nd fl: remodel (e) bathroom. create 2nd bath & utility room.Details
1st fl: remodel kitchen, living, dining. create powder room. new doors to (e) deck. add gas fire place. 2nd fl: remodel (e) bathroom. create 2nd bath & utility room. | $160,000 |
| May 25, 2021 | Completed final sign-off Oct 2022 | 107 Upper Tr | rev to pa 2019-1120-7777: renovating master bathroom, replacing doors 7 new windows at rear. replace rear deck.Details
rev to pa 2019-1120-7777: renovating master bathroom, replacing doors 7 new windows at rear. replace rear deck. | $150,000 |
| Jun 26, 2019 | Completed final sign-off Aug 2021 | 91 Commonwealth Av | demolition of an exgt deck & stairs @ level one: addition of gaurdrail at termination of extg first floor deck. second floor stairs to remain.Details
demolition of an exgt deck & stairs @ level one: addition of gaurdrail at termination of extg first floor deck. second floor stairs to remain. | $1,000 |
| Mar 19, 2018 | Never finaled issued Jun 2019, no final | 1522 Lake St | convert attic on upper lvl into habitable space. demolish portion of lvl 3 flr to be lowered. reconstruct flr @ lower elevation, demolish portion of roof. reconstruct roof @ a higher elevation, relocate stairs & (n) windows. (n) deck.Details
convert attic on upper lvl into habitable space. demolish portion of lvl 3 flr to be lowered. reconstruct flr @ lower elevation, demolish portion of roof. reconstruct roof @ a higher elevation, relocate stairs & (n) windows. (n) deck. | $200,000 |
| Oct 2, 2015 | Completed final sign-off Sep 2016 | 133 17th Av | new master bath & closet addition @ rear of 2nd floor on (e) roof deck. add roof to (e) deck.Details
new master bath & closet addition @ rear of 2nd floor on (e) roof deck. add roof to (e) deck. | $36,000 |
| Aug 12, 2015 | Completed final sign-off Apr 2017 | 1892 Green St | remove extg glass windscreen and replace with new frameless safety glass windscreen. provide new deck surface waterproofing and new pedestal paversDetails
remove extg glass windscreen and replace with new frameless safety glass windscreen. provide new deck surface waterproofing and new pedestal pavers | $50,000 |
| Jul 15, 2014 | Completed final sign-off Jun 2016 | 2430 Broadway | infill (e) portion of deck between living room & kitchen @ 2nd floor. extend deck above over infill & fireplace (gas) @ living room. ** maher: compliance with ordinance no# 155-13 not required **Details
infill (e) portion of deck between living room & kitchen @ 2nd floor. extend deck above over infill & fireplace (gas) @ living room. ** maher: compliance with ordinance no# 155-13 not required ** | $55,000 |
| Jul 24, 2012 | Completed final sign-off Jan 2013 | 30 Loma Vista Tr | replace & expand deck at rear & side of house, less than 24" above grade in rear yard setbackDetails
replace & expand deck at rear & side of house, less than 24" above grade in rear yard setback | $5,000 |
| Oct 7, 2011 | Completed final sign-off Sep 2012 | 2114 Baker St | unit 3 only, 2nd and 3rd fl. floor 2: remodel kitchen and powder room, provide 5/4" ipe over e 1 hr deck/roof assembly. floor 3: convert bedroom to master bath. remodel bath, convert bathroom to utility room. remodel master bedroom. add new gas fire place per listings.Details
unit 3 only, 2nd and 3rd fl. floor 2: remodel kitchen and powder room, provide 5/4" ipe over e 1 hr deck/roof assembly. floor 3: convert bedroom to master bath. remodel bath, convert bathroom to utility room. remodel master bedroom. add new gas fire place per listings. | $52,000 |
| Jun 2, 2011 | Completed final sign-off Jul 2011 | 1124 Stanyan St | replace e rear deck at floor 2 in like kind; alter configuration of existing flr 3 roof deck.Details
replace e rear deck at floor 2 in like kind; alter configuration of existing flr 3 roof deck. | $17,000 |