Back to kitchen remodel contractors
Bellcore Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Sep 2020
- Last 24 months
- 0 permits filed
88 permits since 2000: 68 completed, 2 never finaled, 18 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 17 completed. Typically 0 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 28, 2016 | Completed final sign-off Sep 2017 | 1333 Jones St | unit 810 - remodel (e) kitchen & 2 bathrooms includes new plumbing fixtures, new light fixtures, cabinets & appliances no relocation of doors, or windows no structural no change on wallDetails
unit 810 - remodel (e) kitchen & 2 bathrooms includes new plumbing fixtures, new light fixtures, cabinets & appliances no relocation of doors, or windows no structural no change on wall | $75,000 |
| Sep 21, 2016 | Completed final sign-off Feb 2017 | 1200 California St | apt #19d: interior remodel, new hardwood flooring, new led lighting fixtures, new plumbing fixtures, new cabinets in two bathrooms and one kitchen, new tile in bathrooms. no window and no structural work, no wall altered.Details
apt #19d: interior remodel, new hardwood flooring, new led lighting fixtures, new plumbing fixtures, new cabinets in two bathrooms and one kitchen, new tile in bathrooms. no window and no structural work, no wall altered. | $85,000 |
| Sep 6, 2016 | Completed final sign-off Mar 2017 | 765 Market St | unit 24b: new plumbing fixtures in ki6chen & bathroom, new hardwood flooring. new tile & stone in kitchen & bathroom, new cabinets, r/r recessed lights, new appliances , no structural work, no change to windows or doors. maintain all fire ratings. no walls moved, removed, aded or infiled.Details
unit 24b: new plumbing fixtures in ki6chen & bathroom, new hardwood flooring. new tile & stone in kitchen & bathroom, new cabinets, r/r recessed lights, new appliances , no structural work, no change to windows or doors. maintain all fire ratings. no walls moved, removed, aded or infiled. | $65,000 |
| Jun 14, 2016 | Completed final sign-off Nov 2016 | 219 Brannan St | #17d -remodel 1 kitchen; replace e. fireplace gas unit with new one; relocate book shelves; demo closets in guest room removing interior of closets.Details
#17d -remodel 1 kitchen; replace e. fireplace gas unit with new one; relocate book shelves; demo closets in guest room removing interior of closets. | $75,000 |
| Jun 14, 2016 | Completed final sign-off Jan 2017 | 1333 Jones St | unit #905: remodel kitchen: new cabinets, fixtures, appliances. remodel master and guest baths: new vanities & fixtures. revise lighting through out. all layouts to remain unchanged. no walls moved, removed added or installed.Details
unit #905: remodel kitchen: new cabinets, fixtures, appliances. remodel master and guest baths: new vanities & fixtures. revise lighting through out. all layouts to remain unchanged. no walls moved, removed added or installed. | $200,000 |
| Feb 23, 2016 | Completed final sign-off Jan 2017 | 850 Powell St | apt 403: remodel 2 bathrooms. new kitchen countertops.Details
apt 403: remodel 2 bathrooms. new kitchen countertops. | $30,000 |
| Dec 29, 2015 | Completed final sign-off Sep 2016 | 1200 California St | #10b- remodel 1 kitchen, 2 baths. remove non structural wall between guest bedroom and living rm. new lighting. no change to unit count and no exterior work done.Details
#10b- remodel 1 kitchen, 2 baths. remove non structural wall between guest bedroom and living rm. new lighting. no change to unit count and no exterior work done. | $125,000 |
| Aug 11, 2015 | Completed final sign-off Jul 2016 | 301 Mission St | open interior non-bearing wall between kitchen and living room. new hardwood flooring misc. electrical modificationsDetails
open interior non-bearing wall between kitchen and living room. new hardwood flooring misc. electrical modifications | $50,000 |
| Jun 2, 2015 | Completed final sign-off Jun 2016 | 1200 California St | remodel kitchen & bathroom (2) no walls being moved misc electrical modifications,new wood floors & paint throughout.no doors or windowsDetails
remodel kitchen & bathroom (2) no walls being moved misc electrical modifications,new wood floors & paint throughout.no doors or windows | $100,000 |
| Apr 7, 2015 | Completed final sign-off Nov 2015 | 1150 Lombard St | remodel existing kitchen & master bathroom, replace misc recessed lights, repaint walls.Details
remodel existing kitchen & master bathroom, replace misc recessed lights, repaint walls. | $70,000 |
| Sep 22, 2009 | Completed final sign-off Aug 2010 | 2452 Washington St | relocate bath, expand ktichen over 1st floor kitchen, add deck.Details
relocate bath, expand ktichen over 1st floor kitchen, add deck. | $200,000 |
| Jan 5, 2007 | Completed final sign-off Jul 2007 | 1000 North Point St | replace kitchen/bath fixtures, kitchen 50% lighting must be fluorescent, bathroom fluorescent or controlled by motion sensors (no structural in kind)Details
replace kitchen/bath fixtures, kitchen 50% lighting must be fluorescent, bathroom fluorescent or controlled by motion sensors (no structural in kind) | $18,000 |
| Oct 2, 2006 | Completed final sign-off Oct 2009 | 146 Funston Av | demo & replace all ext. rear stairs, extend g/f 3' and fill in (e) 8'x12' space, extend 1/f 3' & fill in (e) deck space 8'x12', add new deck 8'x13', add new deck @ 2/f 8'x15' & construct new ext. stairs connecting all levels w/rearyard, internal; add new bath & b.r. @ g/f, move bath/kitchen on 1/f,Details
demo & replace all ext. rear stairs, extend g/f 3' and fill in (e) 8'x12' space, extend 1/f 3' & fill in (e) deck space 8'x12', add new deck 8'x13', add new deck @ 2/f 8'x15' & construct new ext. stairs connecting all levels w/rearyard, internal; add new bath & b.r. @ g/f, move bath/kitchen on 1/f, | $350,000 |
| Dec 2, 2005 | Completed final sign-off Oct 2007 | 1919 Baker St | horizontal addition: extend 1st floor dining room into sideyard, extend br, 5' south, extend family room 5' south & remodel kitchen & powder room, excavate rear of ll, create new bedrm & bath, add 2nd floor. deck. add int stair betwn ll and 1st floor @ rear & remodel 2nd floor bath.Details
horizontal addition: extend 1st floor dining room into sideyard, extend br, 5' south, extend family room 5' south & remodel kitchen & powder room, excavate rear of ll, create new bedrm & bath, add 2nd floor. deck. add int stair betwn ll and 1st floor @ rear & remodel 2nd floor bath. | $400,000 |
| Jun 4, 2004 | Completed final sign-off Oct 2004 | 2790 19th Av | kitchen & bath remodel. cabniet & fixture change out -no structural workDetails
kitchen & bath remodel. cabniet & fixture change out -no structural work | $35,000 |
| Jan 16, 2002 | Completed final sign-off Mar 2002 | 364 Page St | replace kitchen cabinets,sink & countertops unit#24. no structural work.Details
replace kitchen cabinets,sink & countertops unit#24. no structural work. | $12,000 |
| Feb 27, 2001 | Completed final sign-off Jan 2002 | 881 Fulton St | kitchen remodel, add 1/2 bath rmDetails
kitchen remodel, add 1/2 bath rm | $23,000 |