Back to bathroom remodel contractors
Bellcore Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Sep 2020
- Last 24 months
- 0 permits filed
88 permits since 2000: 68 completed, 2 never finaled, 18 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 22 completed. Typically 0 days from filing to permit and 183 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 28, 2016 | Completed final sign-off Sep 2017 | 1333 Jones St | unit 810 - remodel (e) kitchen & 2 bathrooms includes new plumbing fixtures, new light fixtures, cabinets & appliances no relocation of doors, or windows no structural no change on wallDetails
unit 810 - remodel (e) kitchen & 2 bathrooms includes new plumbing fixtures, new light fixtures, cabinets & appliances no relocation of doors, or windows no structural no change on wall | $75,000 |
| Sep 21, 2016 | Completed final sign-off Feb 2017 | 1200 California St | apt #19d: interior remodel, new hardwood flooring, new led lighting fixtures, new plumbing fixtures, new cabinets in two bathrooms and one kitchen, new tile in bathrooms. no window and no structural work, no wall altered.Details
apt #19d: interior remodel, new hardwood flooring, new led lighting fixtures, new plumbing fixtures, new cabinets in two bathrooms and one kitchen, new tile in bathrooms. no window and no structural work, no wall altered. | $85,000 |
| Sep 6, 2016 | Completed final sign-off Mar 2017 | 765 Market St | unit 24b: new plumbing fixtures in ki6chen & bathroom, new hardwood flooring. new tile & stone in kitchen & bathroom, new cabinets, r/r recessed lights, new appliances , no structural work, no change to windows or doors. maintain all fire ratings. no walls moved, removed, aded or infiled.Details
unit 24b: new plumbing fixtures in ki6chen & bathroom, new hardwood flooring. new tile & stone in kitchen & bathroom, new cabinets, r/r recessed lights, new appliances , no structural work, no change to windows or doors. maintain all fire ratings. no walls moved, removed, aded or infiled. | $65,000 |
| Jun 14, 2016 | Completed final sign-off Jan 2017 | 1333 Jones St | unit #905: remodel kitchen: new cabinets, fixtures, appliances. remodel master and guest baths: new vanities & fixtures. revise lighting through out. all layouts to remain unchanged. no walls moved, removed added or installed.Details
unit #905: remodel kitchen: new cabinets, fixtures, appliances. remodel master and guest baths: new vanities & fixtures. revise lighting through out. all layouts to remain unchanged. no walls moved, removed added or installed. | $200,000 |
| Mar 24, 2016 | Completed final sign-off Sep 2016 | 1810 Jackson St | remodel 2-1/2 bathrooms; misc. electrical work; paint, no structural work; same configuration. compliance with maher ordinance no 155-13 not required.Details
remodel 2-1/2 bathrooms; misc. electrical work; paint, no structural work; same configuration. compliance with maher ordinance no 155-13 not required. | $100,000 |
| Feb 23, 2016 | Completed final sign-off Jan 2017 | 850 Powell St | apt 403: remodel 2 bathrooms. new kitchen countertops.Details
apt 403: remodel 2 bathrooms. new kitchen countertops. | $30,000 |
| Dec 29, 2015 | Completed final sign-off Sep 2016 | 1200 California St | #10b- remodel 1 kitchen, 2 baths. remove non structural wall between guest bedroom and living rm. new lighting. no change to unit count and no exterior work done.Details
#10b- remodel 1 kitchen, 2 baths. remove non structural wall between guest bedroom and living rm. new lighting. no change to unit count and no exterior work done. | $125,000 |
| Aug 24, 2015 | Completed final sign-off Dec 2015 | 3240 Sacramento St | bathroom remodel. new wood flooring. remove and replace existing lighting. no structural workDetails
bathroom remodel. new wood flooring. remove and replace existing lighting. no structural work | $30,000 |
| Jun 2, 2015 | Completed final sign-off Jun 2016 | 1200 California St | remodel kitchen & bathroom (2) no walls being moved misc electrical modifications,new wood floors & paint throughout.no doors or windowsDetails
remodel kitchen & bathroom (2) no walls being moved misc electrical modifications,new wood floors & paint throughout.no doors or windows | $100,000 |
| Apr 7, 2015 | Completed final sign-off Nov 2015 | 1150 Lombard St | remodel existing kitchen & master bathroom, replace misc recessed lights, repaint walls.Details
remodel existing kitchen & master bathroom, replace misc recessed lights, repaint walls. | $70,000 |
| May 29, 2012 | Completed final sign-off Sep 2012 | 1333 Jones St | add wet bar, add office, bath, dinning room and pantry cabinets. add new electrical including moving panel. add new oen and regrigerator. no structual work. revison to pa#201201303134.Details
add wet bar, add office, bath, dinning room and pantry cabinets. add new electrical including moving panel. add new oen and regrigerator. no structual work. revison to pa#201201303134. | $20,000 |
| Jan 30, 2012 | Completed final sign-off Sep 2012 | 1333 Jones St | work in unit #705: bathroom renoation (one) (n) lighting comply with cec 150(k), no structural work.Details
work in unit #705: bathroom renoation (one) (n) lighting comply with cec 150(k), no structural work. | $45,000 |
| Oct 5, 2009 | Completed final sign-off Oct 2009 | 84 Palm Av | remove old windows, install new window ( one window at bathroom) on side wall of building. no structural work.Details
remove old windows, install new window ( one window at bathroom) on side wall of building. no structural work. | $2,000 |
| Sep 22, 2009 | Completed final sign-off Aug 2010 | 2452 Washington St | relocate bath, expand ktichen over 1st floor kitchen, add deck.Details
relocate bath, expand ktichen over 1st floor kitchen, add deck. | $200,000 |
| Jun 26, 2009 | Completed final sign-off Oct 2009 | 84 Palm Av | remodel of existing bathroom new tile and fixtures no structural work lighting with occupancy sensorDetails
remodel of existing bathroom new tile and fixtures no structural work lighting with occupancy sensor | $15,000 |
| Dec 17, 2008 | Completed final sign-off May 2009 | 1725 20th St | revision to application 200710034501s1. finaliza skylight, door & window options plus add partitions, half bathroom & bedroom in part of den.Details
revision to application 200710034501s1. finaliza skylight, door & window options plus add partitions, half bathroom & bedroom in part of den. | $14,000 |
| Jan 5, 2007 | Completed final sign-off Jul 2007 | 1000 North Point St | replace kitchen/bath fixtures, kitchen 50% lighting must be fluorescent, bathroom fluorescent or controlled by motion sensors (no structural in kind)Details
replace kitchen/bath fixtures, kitchen 50% lighting must be fluorescent, bathroom fluorescent or controlled by motion sensors (no structural in kind) | $18,000 |
| Oct 2, 2006 | Completed final sign-off Oct 2009 | 146 Funston Av | demo & replace all ext. rear stairs, extend g/f 3' and fill in (e) 8'x12' space, extend 1/f 3' & fill in (e) deck space 8'x12', add new deck 8'x13', add new deck @ 2/f 8'x15' & construct new ext. stairs connecting all levels w/rearyard, internal; add new bath & b.r. @ g/f, move bath/kitchen on 1/f,Details
demo & replace all ext. rear stairs, extend g/f 3' and fill in (e) 8'x12' space, extend 1/f 3' & fill in (e) deck space 8'x12', add new deck 8'x13', add new deck @ 2/f 8'x15' & construct new ext. stairs connecting all levels w/rearyard, internal; add new bath & b.r. @ g/f, move bath/kitchen on 1/f, | $350,000 |
| Dec 2, 2005 | Completed final sign-off Oct 2007 | 1919 Baker St | horizontal addition: extend 1st floor dining room into sideyard, extend br, 5' south, extend family room 5' south & remodel kitchen & powder room, excavate rear of ll, create new bedrm & bath, add 2nd floor. deck. add int stair betwn ll and 1st floor @ rear & remodel 2nd floor bath.Details
horizontal addition: extend 1st floor dining room into sideyard, extend br, 5' south, extend family room 5' south & remodel kitchen & powder room, excavate rear of ll, create new bedrm & bath, add 2nd floor. deck. add int stair betwn ll and 1st floor @ rear & remodel 2nd floor bath. | $400,000 |
| Jun 4, 2004 | Completed final sign-off Oct 2004 | 2790 19th Av | kitchen & bath remodel. cabniet & fixture change out -no structural workDetails
kitchen & bath remodel. cabniet & fixture change out -no structural work | $35,000 |
| May 15, 2001 | Completed final sign-off May 2001 | 2271 Union St | revision to 9913286 study rm to full bath revise plan for as built condition per inspector 1st fl oDetails
revision to 9913286 study rm to full bath revise plan for as built condition per inspector 1st fl o | |
| Feb 27, 2001 | Completed final sign-off Jan 2002 | 881 Fulton St | kitchen remodel, add 1/2 bath rmDetails
kitchen remodel, add 1/2 bath rm | $23,000 |